Council archive · source document
Appendix B Code Compliance Statements · MCU22/0038
Noosa Business Centre – Lot 22 Medihub Noosa Plan 2006 dated June 2018
Compliance
Specific Outcomes Probable Solutions Response
ü/û/NA
industry has regard to the desired visualcharacter of
the locality.
Management of Operations No Solution Provided
O93
On-site drainage is designed, constructed and
maintained to:
a) minimise erosion;
b) avoid pollution of groundwater and
surfacewater;
c) provide opportunities to conserve and
reusewater on the site; and
d) prevent additional flooding or inundation.
O94
Noise, vibration and dust emissions from the
development are managed to acceptable levels.
O95
Operations minimise lighting impacts on roadsand
other properties
O96
Public access to the site is managedappropriately
O97
Development is designed in a manner which will
not compromise the stability, safety or operation
of infrastructure.
O98
Development is designed and managed to minimise
the risk and impact of any accidental spillsand / or
releases of chemicals and other materials that may
contaminate soil, stormwater, groundwaterand/or
air.
Landscaping No Solution Provided
O99
Page | 67
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix B Code Compliance Statements.pdfRelated documentApplication case desk ↗
About this file
- File size
- 332 KB (small file)
- File type
No other editions are linked here.