Council archive · source document
Appendix B Code Compliance Statements · MCU22/0038
Noosa Business Centre – Lot 22 Medihub Noosa Plan 2006 dated June 2018
Compliance
Specific Outcomes Probable Solutions Response
ü/û/NA
O104 No solution provided
Resource extraction activities in proximity tothe
Noosa River system only occur where—
a) there is a clear demonstrated need;
b) no feasible and prudent alternatives
areavailable; and
c) it can be demonstrated that the
intrinsic natural values and
resources of the river system can
be managed and protected in an
ecologically sustainable manner.
O105 No solution provided
Industrial business Type 3 Extractive usesare
designed, located and operated to ensure—
a) haulage routes associated with
extractiveresources—
i are located on roads where the
haulageroute will minimise adverse
impacts on residential and urban
residential amenity;
ii are located on roads which are of
adequate construction and which
may be upgraded as part of the
utilisation ofthe extractive
resource; and
iii are adequately maintained as a part
of the utilisation of the extractive
resource;and
b) the utilisation of any extractive resource
does not result in adverse visual impacts
from majorroads; and
c) the rehabilitation of extractive industry
sites, prior to or in conjunction with land
use changeson the site of the resources or
within buffers to the resource.
Page | 69
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix B Code Compliance Statements.pdfRelated documentApplication case desk ↗
About this file
- File size
- 332 KB (small file)
- File type
No other editions are linked here.