Original source · versioned page text
Development Application Part 1 of 2 - Cover Letter - IDAS Forms 1 and 6 - OPW13/0022
Very large file: it may take a few minutes
The original of this document is very large (66.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Fax number (non-mandatory requirement) I 07 5443 5642
e-mail address (non-mandatorY requirement)
I [email protected]
Applicant’s reference number (non-mandatory
requirement)
1. What is the nature of the development proposed and what type of approval is being sought?
Table A-Aspect 1 of the application (If there are additional aspects to the application please list in Table B-Aspect 2.)
a) What is the nature of the development? (Please only tick one box.)
D Material change of use D Reconfiguring a lot D Building work rgj Operational work
b) What is the approval type? (Please only tick one box.)
D Preliminary approval D Preliminary approval rgj Development
under s241 of SPA under s24~ and s242 permit
of SPA
c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
I Driveway works.
d) What is the level of assessment? (Please only tick one box.)
D Impact assessment rgj Code assessment
Table B-Aspect 2 of the application (If there are additional aspects to the application please list in Table C-Additional
aspects of the application.)
a) What is the nature of development? (Please only tick one box.)
D’Material change of use D Reconfiguring a lot D Building work D Operational work
b) What is the approval type? (Please only tick one box.)
D Preliminary approval D Preliminary approval D Development
under s241 of SPA under s241 and s242 permit
of SPA
c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
d) What is the level of assessment?
D Impact assessment D Code assessment
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.