Skip to the record
For the highest quality transcripts.

Original source · versioned page text

20210105 - DA Form 1 - Development Application

of 13

Page text shows just the words. Original shows the document exactly as it was published.

PART 7 – FURTHER DETAILS

 20) Are there any associated development applications or current approvals? (e.g. a preliminary approval)
     Yes – provide details below or include details in a schedule to this development application
     No
 List of approval/development             Reference number                     Date                                 Assessment
 application references                                                                                             manager
     Approval                                                                                                       NSC
                                          132006.1165                          Detached House
     Development application
     Approval                                                                                                       Suncoast Building
                                          112007.102                           Dwelling                             Approvals
     Development application
     Approval                                                                  Alterations & Additions To           Pacific BCQ
                                          PC18/1285
     Development application                                                   Dwelling
     Approval                                                                                                       NSC
                                          132006.1165.01                       Material Change of Use
     Development application

 21) Has the portable long service leave levy been paid? (only applicable to development applications involving building work or
      operational work)
     Yes – a copy of the receipted QLeave form is attached to this development application
     No – I, the applicant will provide evidence that the portable long service leave levy has been paid before the
     assessment manager decides the development application. I acknowledge that the assessment manager may
     give a development approval only if I provide evidence that the portable long service leave levy has been paid
     Not applicable (e.g. building and construction work is less than $150,000 excluding GST)
 Amount paid                           Date paid (dd/mm/yy)                            QLeave levy number (A, B or E)
 $

 22) Is this development application in response to a show cause notice or required as a result of an enforcement
 notice?
     Yes – show cause or enforcement notice is attached
     No

 23) Further legislative requirements
 Environmentally relevant activities
 23.1) Is this development application also taken to be an application for an environmental authority for an
 Environmentally Relevant Activity (ERA) under section 115 of the Environmental Protection Act 1994?
     Yes – the required attachment (form ESR/2015/1791) for an application for an environmental authority
     accompanies this development application, and details are provided in the table below
     No
 Note: Application for an environmental authority can be found by searching “ESR/2015/1791” as a search term at www.qld.gov.au. An ERA
 requires an environmental authority to operate. See www.business.qld.gov.au for further information.
 Proposed ERA number:                                                   Proposed ERA threshold:
 Proposed ERA name:
     Multiple ERAs are applicable to this development application and the details have been attached in a schedule to
     this development application.
 Hazardous chemical facilities
 23.2) Is this development application for a hazardous chemical facility?
     Yes – Form 69: Notification of a facility exceeding 10% of schedule 15 threshold is attached to this development
     application
     No


                                                                                                                                      Page 8
                                                                                                   DA Form 1 – Development application details
                                                                                                                Version 1.2— 7 February 2020
Log in to download the original file

20210105 - DA Form 1 - Development Application.pdf · 268 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.