Delegated Report - Code - Planning MCU25 0020 (As Published) · MCU25/0020
Landscaping Works
10. A minimum of 20% of the site must be retained as soft landscaping.
11. Side boundaries are to include a mix of vegetation which includes shrubs and trees. The
plants are to be sourced from the Noosa Plan 2020 - PSP2 Landscaping planning scheme
policy and maintained for the life of the use at the site.
12. Existing vegetation in the road reserve must be retained, unless written authorisation from
Council is granted for the clearing.
Flood Immunity and Earthworks
13. The minimum floor levels of all habitable rooms must be at least 300 millimetres above the
Defined Flood Event – 1% AEP.
Site Access and Driveways
14. A sealed access driveway must be provided from Ravenwood Drive to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
an Operational Works approval, be generally in accordance with SCG’s Driveway & Access
Plan (0280-OW4.1, Rev. B) dated 9 October 2025.
Stormwater Drainage
15. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge without causing scour or damage to the subject site or any adjoining properties.
Easements
16. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
17. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
18. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
19. All works must be carried out in accordance with the recommendations contained in
Tectonic’s Geo-environmental Investigation Proposed Residence (25040-001-Rev1) dated 4
June 2025 and endorsed as part of the building approval.
20. A dilapidation survey must be carried out of all adjacent properties, structures and
infrastructure prior to the commencement of works and endorsed as part of the building
approval.
Acid Sulfate Soils
21. All works must be carried out in accordance with ADG Consulting’s Dewatering Management
Plan (ADG1786.25, Rev. 1) dated 7 October 2025 and endorsed as part of the building
approval.
Earthworks and Retaining Walls
22. All earthworks and associated retaining structures/batters, both above and below ground,
both temporary and permanent, must be contained entirely within the subject site unless
written permission form the respective landowner(s) is provided to Council. All earthworks
must be undertaken in accordance with the provisions of Australian Standard AS3798:
Guidelines on Earthworks for Commercial and Residential Developments.
Page 13 of 16
Document Set ID: 24102305
Version: 7, Version Date: 29/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU25 0020 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.