Council archive · source document
Bushfire Hazard Assessment Management Plan v2 - 434 Lake Cooroibah Rd Lake Cooroibah v1 · RAL26/0015
Plans and drawings: the text below has words only, no drawings.
Bushfire Hazard Assessment & Management Plan v2 NCES REF: J001445 434 Lake Cooroibah Rd Lake Cooroibah, QLD 5 BUSHFIRE RISK ASSESSMENT 5.1 General A bushfire risk assessment has been prepared generally in accordance with State Planning Policy – State Interest Guideline – Natural Hazards, Risk and Resilience (DILGP, 2016) and AS/NZS ISO 31000:2018 – Risk Management Methodology. The bushfire risk assessment assesses the risk that the proposed new buildings will be exposed to an acceptable to tolerable level of radiant heat impact from the adjacent confirmed Potential Bushfire Intensity areas depicted on Plan BF03 – Local Hazard Map. Plate 7 illustrates the concept of radiant heat exposure. Plate 7 – Figure A 5.1 Bushfire attack mechanisms (Planning for Bush Fire Protection, 2006) According to AS/NZS ISO 31000:2018, a ‘hazard’ is defined as a source of potential harm or a situation with a potential to cause loss, whereas a ‘risk’ is the chance of something happening that will have an impact on objectives measured in terms of consequences and likelihood. The State Planning Policy – State Interest Guideline – Natural Hazards, Risk and Resilience (DILGP, April 2016) refers to ‘acceptable risk’, ‘tolerable risk’, and ‘intolerable risk’ which are defined below. • Acceptable risk o A risk that, following an understanding of the likelihood and consequences, is sufficiently low to require no new treatments or actions to reduce risk further. Individuals and society can live with this risk without feeling the necessity to reduce the risks any further. • Tolerable risk o A risk that, following an understanding of the likelihood and consequences, is low enough to allow the exposure to continue, and at the same time high enough to require new treatments or actions to reduce risk. Society can live with this risk but believes that as much as is reasonably practicable should be done to reduce the risks further. • Intolerable risk o A risk that, following an understanding of the likelihood and consequences, is so high that it requires actions to avoid or reduce the risk. Individuals and society will not accept this risk, and measures are to be put in place to reduce risks to at least a tolerable level. 5.2 Likelihood of Bushfire Impact AS/NZS ISO 31000:2018 defines ‘Likelihood’ as the chance that something might happen. Likelihood can be defined, determined, or measured objectively or subjectively and can be expressed either qualitatively or quantitatively (using mathematics). The following ‘likelihood’ categories for the probability of the assessed bushfire attack mechanisms impacting the assessment area have been adopted within this assessment: • Likely - Will probably occur © 2026 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Bushfire Hazard Assessment Management Plan v2 - 434 Lake Cooroibah Rd Lake Cooroibah v1.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.