Council archive · source document
Bushfire Hazard Assessment Management Plan v2 - 434 Lake Cooroibah Rd Lake Cooroibah v1 · RAL26/0015
Plans and drawings: the text below has words only, no drawings.
Bushfire Hazard Assessment & Management Plan v2 NCES REF: J001445 434 Lake Cooroibah Rd Lake Cooroibah, QLD 2. Are designed to ensure a potential available fuel load is maintained at less than 8 tonnes/hectare in aggregate and with a fuel structure that remains discontinuous. • The Lot 8 driveway corridor to the north and east of the Lot 7 building envelope be maintained in a low fuel load state. • The extent of VHC 9.1 does not expand within the site. • All future Lot 7 boundary fencing and any fencing within Lot 7 comprise either non- combustible materials, hardwood fencing, or a pine post and rail design. Pine paling fencing is not to be used. Any timber fencing does not fix directly to buildings and is provided with a minimum 1m separation comprised of non-combustible materials (i.e. a tubular steel/aluminium swing gate. A further detailed description of landscaping requirements is detailed in Section 5.6 Landscaping and Regrowth. 6.3 Water Supply The availability of a reliable water supply for firefighting purposes is a vital tool in the defence of bushfire impact. The new lot will not be serviced by the reticulated town water supply. The new water supply to Lot 7 should therefore satisfy Assessment Benchmark 4 of the SPP Bushfire 2019, which references the QFES 2019 Bushfire Resilient Communities document for information regarding appropriate static water supply. Section 9.1 of Bushfire Resilient Communities’ states: An appropriate static water supply (in bushfire prone areas where reticulated supply is not provided) to support effective emergency services response includes a water tank that is available solely for firefighting purposes and can be accessed by firefighting appliances. The water tank is to be provided within 10 metres of each building (other than a class 10 building), which: a) is either below ground level or of non-flammable construction; b) has a take-off connection at a level that allows the following dedicated, static water supply to be left available for access by firefighters: i.10,000 litres for residential buildings; Lot 7 is expected to host residential buildings hence provision of 10,000 litres supply located within 10 metres of each residential building on the lot is required. Pumps used for powering the water supply are to comprise petrol powered pumps with a minimum flow capacity of 7.5L /sec (i.e. Honda fire fighter pump etc). The tanks are to be provided with a 50mm male camlock fitting to enable QFES to access the water supply and be provided with sufficient hose length to circumference the dwelling. A 50mm blue lay flat hose or similar is recommended. Plate 9 outlines an example of a reserve water supply in a standard tank. © 2026 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Bushfire Hazard Assessment Management Plan v2 - 434 Lake Cooroibah Rd Lake Cooroibah v1.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.