Skip to the record
The only place to find full transcripts.

Council archive · source document

Bushfire Hazard Assessment Management Plan v2 - 434 Lake Cooroibah Rd Lake Cooroibah v1 · RAL26/0015

of 44

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Bushfire Hazard Assessment & Management Plan v2                                        NCES REF: J001445
434 Lake Cooroibah Rd Lake Cooroibah, QLD




8.2 State Planning Policy – Natural Hazards, Risk and Resilience
The Department of State Development, Manufacturing, Infrastructure and Planning’s State Planning
Policy – State interest guidance material – Natural hazards, risk and resilience – Bushfire (December
2019) contains the development assessment benchmarks for natural hazards, risk and resilience -
bushfire. The SPP assessment benchmarks prevail over those prescribed in the SCRC Bushfire
Hazard Overlay Code where they involve the same design elements.
An assessment of the proposed development’s compliance with each of the assessment
benchmarks has been provided below.
Assessment Benchmark 4
To ensure emergency services can respond effectively, development is located within a reticulated
water supply area or includes a dedicated static water supply that is available solely for fire-fighting
purposes and can be accessed by fire-fighting vehicles.
Reticulated water supply is not available to the development. A dedicated water supply is required
that satisfies Assessment Benchmark 4.
Where reconfiguring a lot creating lots of greater than 2000 square metres
To ensure emergency access and operational space for firefighters, include a development footprint
plan that is separated from the closest edge of the adjacent mapped medium, high or very high
potential bushfire intensity area by a distance that achieves a radiant heat flux level of 29 kilowatt
per square metre or less.
The plan of development satisfies the <29kW/m2 RHF setback requirement for Lot 7 which will host
a new dwelling.
Where reconfiguring a lot creating additional lots for the purpose of residential development and a
reticulated water supply is not provided.
The recommendations set in Section 5.3 herein require the development to include a dedicated static
water supply that is available solely for fire-fighting purposes and can be suitably accessed by fire-
fighting vehicles.
To ensure safe access and egress and operational space for rural fire-fighting vehicles, a fire trail
and working area is provided that separates the new residential lot or development footprint plans
from adjacent mapped medium, high or very high potential bushfire intensity areas (refer diagram
below) and is designed and constructed in accordance with the design parameters in Table 4.




© 2026                                            31

Used in these records

About this file

File size
7.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Bushfire Hazard Assessment Management Plan v2 - 434 Lake Cooroibah Rd Lake Cooroibah v1.pdf · 7.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.