Council archive · source document
Bushfire Hazard Assessment Management Plan v2 - 434 Lake Cooroibah Rd Lake Cooroibah v1 · RAL26/0015
Plans and drawings: the text below has words only, no drawings.
Bushfire Hazard Assessment & Management Plan v2 NCES REF: J001445 434 Lake Cooroibah Rd Lake Cooroibah, QLD 8.2 State Planning Policy – Natural Hazards, Risk and Resilience The Department of State Development, Manufacturing, Infrastructure and Planning’s State Planning Policy – State interest guidance material – Natural hazards, risk and resilience – Bushfire (December 2019) contains the development assessment benchmarks for natural hazards, risk and resilience - bushfire. The SPP assessment benchmarks prevail over those prescribed in the SCRC Bushfire Hazard Overlay Code where they involve the same design elements. An assessment of the proposed development’s compliance with each of the assessment benchmarks has been provided below. Assessment Benchmark 4 To ensure emergency services can respond effectively, development is located within a reticulated water supply area or includes a dedicated static water supply that is available solely for fire-fighting purposes and can be accessed by fire-fighting vehicles. Reticulated water supply is not available to the development. A dedicated water supply is required that satisfies Assessment Benchmark 4. Where reconfiguring a lot creating lots of greater than 2000 square metres To ensure emergency access and operational space for firefighters, include a development footprint plan that is separated from the closest edge of the adjacent mapped medium, high or very high potential bushfire intensity area by a distance that achieves a radiant heat flux level of 29 kilowatt per square metre or less. The plan of development satisfies the <29kW/m2 RHF setback requirement for Lot 7 which will host a new dwelling. Where reconfiguring a lot creating additional lots for the purpose of residential development and a reticulated water supply is not provided. The recommendations set in Section 5.3 herein require the development to include a dedicated static water supply that is available solely for fire-fighting purposes and can be suitably accessed by fire- fighting vehicles. To ensure safe access and egress and operational space for rural fire-fighting vehicles, a fire trail and working area is provided that separates the new residential lot or development footprint plans from adjacent mapped medium, high or very high potential bushfire intensity areas (refer diagram below) and is designed and constructed in accordance with the design parameters in Table 4. © 2026 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Bushfire Hazard Assessment Management Plan v2 - 434 Lake Cooroibah Rd Lake Cooroibah v1.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.