Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

RFI - Engineering correspondence

of 3

Page text shows just the words. Original shows the document exactly as it was published.

The MUSIC model file is included with this response for review of the treatment nodes, being a
swale and GPT to simulate the grate on the existing field inlet pit for proposed Lot 4.

This correspondence and attached documentation conclude the partial response to Council’s
information request and is provided in accordance with the requirements of Part 3 of the DA
Rules, Planning Act 2016.


If you wish to discuss this matter further, please contact Cameron Landreth on (07) 5443 8285.

Yours sincerely,




CAMERON LANDRETH - Director
BEng (Hons), NER, RPEQ 19358
For and behalf of;
BARLOW SHELLEY CONSULTING ENGINEERS (AUST) PTY LTD

Encl:
Updated Civil OPW Drawings (Rev-B)
Sediment Basin Calculations
MUSIC Model for subdivision




 2023 - Bullgate                                                                       Page 3 of 3
Log in to download the original file

RFI - Engineering correspondence.pdf · 183 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.