The owner of Unit 1 is currently renovating the existing unit as it is relatively old and in urgent need of
renovation and modernization. As part of the renovation, the applicant seeks to improve the function
of the existing upper level northern deck by increasing the length of the deck by an additional 2.07
metres to create a more useable deck with an overall length of 5 metres. The additional deck area
2
results in an additional floor area of 13.25m . The new deck area is also proposed to be covered with
a new slim line roof. Proposal plans prepared by Aboda Design Group are attached.
In support of the proposal the following is noted:
• The proposal slightly increases the length on an existing deck;
• The proposed new pergola will not be readily visible to surrounding public area as the
site is located above normal eye level;
• Existing vegetation around the site will reduce any visual impacts of the proposed
works;
• The deck will be located over an existing portion of the building; and
• The proposed extension to the deck will be visually consistent with the form of
development in the area.
Sustainable Planning Act
Section 367 of the Sustainable Planning Act defines a permissible change for a development approval
as:
(1) A permissible change, for a development approval, is a change to the approval that
would not, because of the change—
(a) result in a substantially different development; or
(b) if the application for the approval were remade including the change—
(i) require referral to additional concurrence agencies;
or
(ii) for an approval for assessable development that previously did not require
impact assessment—require impact assessment; or
(c) for an approval for assessable development that previously required impact
assessment—be likely, in the responsible entity’s opinion, to cause a person to make a
properly made submission objecting to the proposed change, if the circumstances allowed; or
(d) cause development to which the approval relates to include any prohibited development.
The proposed change is considered to comply with the requirements of the Sustainable Planning Act
as detailed below:
(a) result in a substantially different development;
The proposed change does not result in a substantially different development as minimal
external works are proposed and the residential use remains the same.
(b) if the application for the approval were remade including the change—
(i) require referral to additional concurrence agencies;
or
(ii) for an approval for assessable development that previously did not require
impact assessment—require impact assessment; or
No concurrence agencies would be triggered by the proposal and the level of assessment
has not altered.
(c) for an approval for assessable development that previously required impact
assessment—be likely, in the responsible entity’s opinion, to cause a person to make a
properly made submission objecting to the proposed change, if the circumstances allowed;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Martoo Supporting letter -changes application to NC.pdfRelated documentApplication case desk ↗
Martoo Supporting letter -changes application to NC.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.