Council archive · source document
Approved Plans MCU13/0171
Plans and drawings: the text below has words only, no drawings.
SUNSHINE COAST REGIONAL COUNCIL
APPROVED
MCU 13/0171 1 NOV 13
A Line interior of Museum
Gate & Fence area with brick B
Concrete tilt panel fire rated wall Fence
2,600
1,100
8,541
Existing Drying Rm
Reconfigured as Cool Rm
9,800
Museum
Steel Portal
Entry Trellis 206 m2
Workers
Lunch rm
OUT
Roller Door
Public Toilets
6,825
20,982
11 M
DA
up
1 OUT
M
1 Warehousing
7,453
Entry up
Foyer /
Lockers
Meeting Line of Mezanine above
Reception
Staff Toilets/
45,638
F Change
Fridge Display
Sales staff
Tea Rm
Roller Door
7,453
Informal
Lunch rm
Storage TRUCKS UNLOADING
Office
C Function / C
Factory
Display Rm Manager Roller
Door
Manufacturing
Office 1,000 m2
Manager Dispatch
15,366
Restored
Void
Ramp Up
Historic
Delivery
Truck
Scissor Lift Door Roller Door Roller Door Roller Door Roller Door
dp dp dp dp
Concrete tilt panel infill
0
,49 1,924 6,064 8,522 7,465 7,460 7,462 6,097 8,503 6,092 7,540 7,542 7,058 7,073 7,986 7,085 7,227 9,013
16
A B Line of existing awning over
3,852
Existing stormwater
from downpipes
bo
un
da
ry
lin
e
Existing pedestrian
bridge and path
Existing Drain
Line of 6m
Landscape
buffer zone
Ground Floor Plan
1:200
0 5m 25m
WIMMERS FACTORY 06 September 2013
SCALE 1 : 200 @ A1
271 Lake Macdonald dr.
ROBINSON
A RC HIT ECT S
Lake Macdonald PAGE No. DA-03 Copyright of Robinson Architects 2013.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
APPROVED PLANS MCU13/0171Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.