Council archive · source document
22441 DA - Response to Information Request [As Published] · 132001.210331.2
Council's Reference: DA 22441
OurReference: 00716 LO3KG f Y la rtoo
Our Project Planner. Nadine Gorton
e .D consulting m
B an “1 ‘9 itd
yous .
2y = 2 > town planners +
15” May 2007 Bm % =z urban designers
ze mm abn | 86 120 928 707
Be CO
e 3
Chief Executive Officer
Noosa Shire Council
PO Box 141
TEWANTIN Q 4565
Attention: Kerri Coyle - Land Use Section
Dear Kerri,
RE:
Application for a Minor Change to Development Approval (22441 DA) for a Dwelling House
at 10 Park Road, Noosa Heads described as Lot 55 on RP52918.
| refer to the above development application and in particular to the request for additional information issued
by Noosa Council and dated 22 February 2007.
This request listed four (4) items that Council considers it requires in order to complete its assessment of the
above application. The applicant has decided to respond to four (4) of these items as detailed below:
tem 1:
Comment:
SUNSHINE COAST OFFICE
1/199 GYMPIE TERRACE, NOOSAVILLE
TELEPHONE |
[email protected]
07 5455 5425 FACSIMILE |
Whiten details and / or plans indicating how the building will achieve the Specific Outcome
in relation to setbacks of The Noosa Plan ~ Detached House Code Table 14.26 Specific
Outcomes 01. Concem is raised that the proposed changes will result in less landscaping
at the site’s front that would assist in screening the building from Park Road.
The applicant submits amended plans that indicate the location of the existing approved
dwelling on site compared to the changes proposed as part of this application. A
comparison of the original plans against the proposed changes reveals that the original
plans approved the garage with a setback of 0.6 metre. The proposed changes provide
the garage setback 0.0 metres to 7.0 metres with an average of 4 metres.
As indicated by the amended plans, the garage itself will be excavated into the site with the
dune reinstated over. Thus the only part of the garage that will be visible is the excavated
entrance.
With regard to the Specific Outcomes the proposal is considered to comply with the Noosa
Plan as detailed below:
Setbacks
O71 Buildings and other structures are appropriately designed and sited to—
a) provide amenity for users of the premises as well as preserve the visual and
acoustic privacy of adjoining and nearby land uses;
The location of the garage provides a setback that is greater than the previous
approval on the site and the adjoining development to the south. The garage
location provides greater area for the provision of soft landscaping to be at the front
of the site than the previous approval.
b) preserve any existing vegetation that will buffer the proposed building from
adjoining uses;
GYMPIE OFFICE
PO BOX 1684 NOOSA HEADS Q 4567 1/28 REEF STREET GYMPIE | PO BOX 391 GYMPIE Q 4570
07 5455 5725 TELEPHONE | 0754827440 FACSIMILE | 07 5482 4952
[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 57 pages
Page 2
@ Page2
Item 2:
Comment:
Item 3:
Comment:
ftem 4:
Comment:
The proposed garage location enables the retention of significant vegetation at the
front of the site.
C) allow for landscaping to be provided between buildings; and
The design enables substantial landscaping to be provided between the structures
on the site as well as adjoining buildings on the surrounding sites.
a) maintain the visual continuity and pattern of buildings and landscape elements
within the street.
As indicated above, the proposed setback provides a greater setback than those
previously approved on the site and surrounds. The proposed setback is
consistent with the surrounding area and the site to the south which provides a
double garage to the front of the site and is within the front 6.0 metre setback.
The proposed setback will enable retention of existing vegetation at the front of the
site as well as supplementary landscaping that will reinforce the landscape
elements in the Park Road.
Elevations of the proposal from Park Road detailing the proposed finished ground level
area around the garage.
Amended plans prepared by Kidd & Co are provided detailing the proposed finished
ground levels for the development. As indicated by these plans, the basement is buried
beneath the dune apart from the entrance to the garage and entry door.
An amended site-specific geotechnical report {in regards to slope stability / slide hazard)
reflecting the changes made to the layout.
A geotechnical report prepared by Morrison Geotechnic is provided and concludes that the
construction of a dwelling on the site is feasible.
An arborist's report indicating how the trees will be protected on site during construction,
confirming that the trees are able to be successfully retained on site and identifying any
pruning required to site the building. Concem is raised that the revised plans for the
dwelling house extend the built works closer to the trees.
An arborists report prepared by Leaf and Limb Consultancy is attached. The Building
Designer has also provided additional plans indicating the interrelationship between
vegetation on the site and the amended plans.
The supply of this additional information completes the applicant's response to Council's above request for
additional information in relation to this development application.
It is requested that Noosa Council completes its assessment of-the above application as soon as possible
now that the decision making period has commenced under the integrated Planning Act 1997.
Yours sincerely
AE ora_
Nadine Gorton
Senior Planner
Martoo Consulting Pty. Ltd.
Ce Kidd & Co
First Picked P/L
Page 3
FIRST PICKED PTY. BEACH HOUSE - 10 PARK ROAD, NOOSA HEADS. NORTH-WEST PERSPECTIVE - PRELIMINARY. JANUARY 2007 Heaqnes
Page 4
*
» FLOOR AREAS
KIT /DINE/LIV = 71.3m?
kidd
BED 1 25.08?
BED 2 25.08m? + 6 O
BED 3 25.08m?
TOTAL 146.54m? designers
SITE COVER
SITE 881.25m?
FOOTPRINT (inc decks
20 Duke Street
SITE COVER 31.3% Sunshine Beach QLD 4567
PO Box 262
Noosa Heads QLD 4567
Telephone 07 5447 5633
Facsimile 07 5447 5833
|
‘SUBTERRAIN
| GARAGE
UNDER
i
{
|
[email protected]
www.kiddco.com.au
This drawing is to be
read in conjunction with
Engineers Drawings &
Reports.
Construction to comply
with all relevant SAA &
BCA Codes & standard
Bidg By4aw 1975 & as
amended
FLioN
Verify al dimensions on
Site prior to commencement
of any works, These
drawings are not to be
used for seating.
Copyright for design &
drawings remain the
property of the authors,
CONSULTANTS,
Stuctura! Engineers
fon
BE
Pavit
Project
TREE HOUSE
Location
10 PARK ROAD
NOOSA HEADS
Client
FIRST PICKED PTY
Drawing Title
SITE PLAN
Scale Date
as shown JAN 07
Drawn By . Job No:
SF 0703
Drawing No. tssue No.
SD.101 (3)
landscape timber steps
and walkway
{indicated by dotted line)
/ + \SITE PLAN
\s0.108 / SCALE 1:200 @A3
Page 5
FLOOR AREAS
KIT (DINE/LIV—(71.3m?
BED 1 25.08m?
BED 2 25.08m?
BED 3 25.08m? .
TOTAL 146.54m? outline of former 594
developmen®®
SITE COVER approved garage
SITE 881.25m?
FOOTPRINT (inc decks 275.47m?
SITE COVER 31.3%
Note:
Solid fill indicates the former
development approved
extent of the dwelling. footprint of former ®
Note:
development
This drawing has been created to approved dwelling
>
F
indicate footprint comparisons
only between proposed Kidd +
Co Sketch Design and the former
development approved Design.
Note:
Proposed dwelling designed
around retention of existing trees -
indicated on plan.
oA8,
22
39
on
\
Paw OG
footprint of former
development approved
dwelling
\ —
/ 1 \SITE PLAN OVERLAY
\s0.102/ SCALE 1:200 @A3
Peary
kidd
+CO
designers
20 Duke Street ©
Sunshine Beach QLD 4567
PO Box 262 :
Noosa Heads QLD 4567
07 5447 5633
Telephone
Facsimile 07 5447 5833
[email protected]
www.kiddeo.com.au
‘This drawing is to be
read in conjunction with
Engineers Drawings &
Reports.
Construction to comply
with all relevant SAA &
BCA Codes & standard
Bldg By-law 1975 8 as
amended
Project
TREE HOUSE
Location
10 PARK ROAD
NOOSA HEADS
Client
FIRST PICKED PTY
Drawing Title
SITE PLAN OVERLAY
Scale Date
as shown JAN 07
Drawn By Job No:
SF . 0703
Orawing No. - Issue No.
SD.102 (P4)
Page 6
/ \\\ WW \ tn | my
FLOOR AREAS / VA t \ \
« KIT /DINE/LIV 71.3? / \ \ \ \ \ \
BED 1 25.08m? \ ( \ 54 \ To
BED 2 25.08m? ; 1 1 \
BED 3 508m? \ § eo \ | Py y H
~ outline of former 5918 \ \ C| \ | -
TOTAL 146.54m? ae 4 deel one | ro 4 | | kidd
SITE COVER | | \
approved garage, || \ \ | \ \ \ | | uae
designers
SITE 881.25m?
20 Duke Street
‘Sunshine Beach QLD 4567
\
PO Box 262
extent of the dwelling. ) \ footprint of former 7 Noosa Heads QLD 4587
Note: a te q ~~ development | mee _ =
This drawing has been createdto 7 ™ ; (approved dwelling ania eres
indicate footprint comparisons ig ae ae
only between proposed Kidd + | ' 64 [email protected]
Co Sketch Design and the former FY 2 in, ee se
development approved Design \? oA a worw:kiddco.com.au -
Note: This drawing is to be
Proposed dwelling designed 5 ‘ead in conjunction wah
around retention of existing tees 7 . | Nl a | | Engineers Drawings &
indicated on plan. | | ; She Reports.
° $ = \' | ~ J Construction to comply
Se wit al relevant SAA &
= ‘BCA Codes & standard
Big Bylaw 1975 & as
amended
Verify al mensions on
‘te prior tb commencement
of any werks. These
drawings are not to be
sed for scaling.
Copyright for design 8
cravings remain the
property of the authors.
™ (CONSULTANTS
‘Stuctral Engineers
mm 5G
footprint of former
development approved
dwelling
TREE HOUSE
noes —— y Location
4 4 10 PARK ROAD
NOOSA HEADS
Chent
FIRST PICKED PTY
Drawing Title
SITE PLAN OVERLAY
‘Scale Date
as shown JAN 07
‘Drawn By Job No:
SF 0703
Issue No.
Drawing No.
WD.102 | P4
Page 7
/ e
| trunk
; tanked RC Bock REINSTATED
/ retaining wall,
i refer eng. DUNE
}
i
; rain water harvesting
tank under reinstated
@ duneonconcetegarage | Mm aes
trunk _ slab over. refer sched.
REINSTATED
DUNE
tanked RC biock retaining
walt submerged under
teinstated dune refer eng. n .
note: reinforced |
concrete lid required
‘ togarage for’ |
RC block dune teinstated dune.
retaining wall tee
render finish as sched.
pRiveway / 3)--qagr-s
concrete :
AD
tr
| an
PLATFORM |
OVER
parapet retaining
wall T.0.W RL .
10.200,refer eng. [
PLANTING
over (including decks)
TW
REINSTATED
DUNE OVER
trunk
vehicle tumtable refer Australian
Tumtable Details in extemal finishes
schedule. Note : to be read in
conjunction with structural details
MAIN
LIVING
OVER
fender finished RC block lift shaft
wall to RL12.50m. ref eng.
extent of platform over
Lo
tanked RC block
retaining wall, refer eng.
MAIN
LIVING
OVER
building footprint
kidd
Ro
designers
20 Duke Street
Sunshine Beach QLD 4567
PO Box 262
Noosa Heads QLD 4567"
Telephone 07 5447 5633
Facsimile 07 5447 5833
[email protected]
www, kiddco.com.au
This drawing is to be
read in conjunction with
Engineers Drawings &
Reports,
Construction to comply
with all relevant SAA &
BCA Codes & standard
Bldg By4aw 1975 & as
amended
Verify al dimensions on
Site prior to commencement
of any works. These
drawings are nat fo be
used for scaling.
Copyright for design &
drawings remain the
property of the authors,
CONSULTANTS
‘Stuctural Engineers
Project
TREE HOUSE
Location
10 PARK ROAD
NOOSA HEADS
Client
FIRST PICKED PTY
Drawing Title
BASEMENT PLAN
Scale Date
as shown JAN 07
Drawn By Job No:
SF 0703
Drawing No. Issue No.
SD.201 (Ps)
Page 8
contiguous bored _/ e
pile retaining wall. trunk
retaining wall glass balustrade/solid wall |
submerged junction, refer . tapered outrigger,
below dune. /~ ~ refer detail.
SUBTERRAIN ~~ raking baluster at
900mm CRS max. structural fascia.
~~
GARAGE / _
BELOW glass balustrade, refer ~
: ' silicone butt joint to glass / |
balustrade junction y > bpcmny ‘ ™ connected to main
+ | glass balustrade, refer . ' - balustrade type 4- ==. ’ structural column.
' 700 series drawings 4 5
a for details. DECK BECK S ‘o 8
: raking baluster at timber. a, sunk |-—tmber— H BS
: 900mm CRS max. le 20- [FRE 20425}—-(1 gs
it E S$ Oo mss jj “ool
4 aluminium sliding << — olass gate &maoné——-BECK— I's yl
doors,as sched, latch—|— FFi%20-425}| \ Fiatch indicates’
ee at ai tn \ — | direction of flossing
fs ——
DUNE / ightwelght—! Sle lightweight cladding with —_ | | = | ™_
BELOW auninne =F covert, lo _ , BED 1 OVER , fine on upper
- l — =
duneretining | glessbaustade, §— / [[F=——===1/%, LIVING ROOM jt | _ mer
parapet wall . refer 700 series -————$ 4 timber _— ms truss ,
drawings for details. / h Pe = = FEL aa cal col col
op EAR hatch indica —=_ = — | a
taking baluster at -l bse-DECK— ale a = | —- hatch indicates
soomy CRS max Pe teber — direction offering === \ — | | __ direction of flooring
fascia gutter.. -s-REEa ao sing door H y— mene stringer |
aluminium touvres I, c connection. | | line on upper
steel roof over | [Qor- TAI i floor aver
fift shaft. upper inclinator landing | a | |
aluminium sikding doors = OP Leo! truss oy . | structural
I. ey. PT ee posts.
wenn DIN ING ROOM. nee apt | -“ - mono stringer ine on upper |
** tmber * = =p === 22 = BARES Nae = = [5 connection. lorover = | = BED 2OVER
com @™* / STAIRS OVER |
sub board lofation | I = weer REFER 700 |
NY mn incinator trades , x eptsed fis EANDING= |: . |
s/ lei zs (below) ivingpévition == fst i SERIES |
hip flashings to match roof atm touvres . T{2P3) 4] § -— vt
sheating.. r intercom location — . a * DRAWINGS |
. [-~balustrade type-3. iriumn st 03 <r\-|__ mono stringer
I lightweight _ |||" <post* aluminium sik ing dds 2 Be connection. |
contiguous bored pile / trunk awnings over. E————r ——} Cath Se |
retalning wall below. / @ [pean “2a op ere PW at —Pool truss con |
trunk -hES——DECKIE-E: rT? 7h. a (afi |
@, «aking balusterat 77 He —afaeenll ag Le wo N 7 | --4 | |
[__ somm cRS ma Sep KITCHEN “rterjonery av) F822 bo
glass balustrade, . EFL20.150 | | (200seres) Wag Woo __ [S275 tt | bee
refer 700-series sr Erbe Ta eo i ing strat 7 connector |
drawings for detaits. ~~ _ . ft-—balustradetyppJ——pp 0 /- - ep tae 1 / raking 's\ . -
9 eS ee BED3OVER |
silicone butt joint to A~-* ~~ oP wos wor | — mys structural
glass balustrade —™ @ trunk trunk ° ) = %& truss tof). $< posts.
junction ~| @ a
lightweight cladding with ™— ‘ J — —_——
raneweng coverbetfens Structural fascia. | — | hatch indicates
" raking strut =——— direction of flooring
aluminium louvres | =
col |
|
| .
~te— — + — line on upper
Cho | col truss a) floor over
—~ 60 co}
. Qe
/_1_\GROUND FLOOR ~ bunk
raking strut post ~— e
\.8D.203 / SCALE 1:100 @A3 connected to main ~™
structural column, ™ ~~
—~
—
e
~~
~
~~
~
| ~
| trunk
| e
|@ trunk
|
|
|
|
|
|
|
|
|
|
|
|
| trunk
| e
|
|
|
|
|
FLOOR AREAS
KIT /DINE/LIV = 71.3m?
BED 1 25.08m?
BED 2 25.08m?
BED 3 25.08m?
TOTAL 146.54m?
28.08m?
TOTAL
trunk
131.56m"
kidd
+CO
designers
20 Duke Street
Sunshine Beach QLD 4567
PO Box 262
Noosa Heads QLD.4567
Telephone
Facsimile
07 5447 5633
07 5447 5833
[email protected]
www.kiddco,com.au
‘This drawing is to be
read in conjunction with
Engineers Drawings &
Reports,
Construction to comply
with all relevant SAA &
BCA Codes & standard
Bidg By4aw 1975 & as
amended
Verify al dimensions on
Ste prior to commencement
of any works. These
drawings are not to be
used for scaling.
Copyright for design &
drawings remain the
property of the authors.
CONSULTANTS,
Stucturel Engineers
a
Project
TREE HOUSE
Location
10 PARK ROAD
NOOSA HEADS
Client
‘FIRST PICKED PTY
Drawing Title
GROUND FLOOR
Scale Date
as shown JAN 07
Orawn By Job No:
SF 0703
Drawing No. Issue No,
SD.203 (2)
Page 9
trunk
Oo 2 0G
x= <n SE
fo ~LETB lightweight
& / ACK glass balustrade. awnings over.
—™—
& / ae trunk aluminium louvres
Ss ~ e
. — trunk
/ ~~
. / DECK SPA batstade ype ,
lightweight cladding and BELOW punk BELOW = SS 7 lightweight
battens togableend. —} e —— wi2 vk trunk awnings over. trunk
. j PSUR | Suni trunk e
ic ic i : timber e@ a e
lightweight __| BSE = aluminium louvres
awnings. 7 | | Pa IRRER AS —t =| ne trunk
(B= == = | a e
= fase = hatch indicates ——
/ ridge flashings to __J = —Srill 25 T direction of flooring ~~
DECK match roof sheeting. | STEP K | hard wired smoke alarm, ~
/ BELOW type 2 | trunk @® 2 BED) 1 | battery backup ~~ ~~
, ) wow baste || oe | ae al SL
/ | <——_ = sa FFL 28.462 | wall mounted air-conditioning | trunk ~
metal roof sheeting. € fall fall > 'SDECKXE- 1 8 split system above robe, | e ee
/ i oe a | he “. | condenser location T.B.A. |@ trunk
i" gutter. glass balustrade. ; + be | Le [pte joinery. EX TERRAIN
= | | rel | |
| re ah
fascia gutter. ——————> XY EN * ' EIS a8 | Jeot truss oat,
| = ' type 2 balustrade +4 = | SS
| sg at ' ! .
steel roof over if XQ o ' paneny 1 \
LIFT A \ pP—j—t structural
lift shaft. | A MAIN Wis w20 f}— type 2 balustrade | posts.
/ efal ROQF : &— landing over |
hip flashings to match roof / BELOW. LIVING canna BED 2 {_____ ne on upper
sheeting. \ : ' ROOF void OVER | floor over
/ : ' rr eRe re
| ger stare! truss ool
/ drawings|
“impr | ! rk
/ rat (21/20 | e
—— |
— hatch Indicates
tu x/ e@ DECK ——=——* direction of flooring
in turbo vent —
; mk BELOW ~ = | . -
L- lightweight timber treads to landing | «
~~ awnings. € fal 1 truss _ ol
™ tae
fascia gutter, ~ jomery «
™! DP wall mounted air-conditioning split system
™ above robe, condenser location T.B.A.
. . hard wired smoke alarm,
lightweight cladding battery backup
~ and battens to
— gable end. lightweight
“oS awnings over.
—L_ aluminium louvres
EX TERRAIN
hatch indicates
glass balustrade. irection of flooring
SSL lightweight cladding with
J1\ O O aluminium touvres = > x] e coverbattens,
FIRST FLOOR 8
\\s0.204// SCALE 1:100 @A3
Cc . . ~~ trunk
lightweight awnings over. ~~ e
steps to street level” _
kidd
+CO
designers
20 Duke Street
Sunshine Beach QLD 4567
PO Box 262
Noosa Heads QLD 4567
07 5447 5633
07 5447 5833
Telephone
Facsimile
[email protected]
www.kiddco.com.au
This drawing is to be
read in conjunction with
Engineers Drawings &
Reports.
Construction to comply
with afl relevant SAA &
BCA Codes & standard
_ Bldg Bysaw 1975 & as
amended
Verity all dimensions on
ste prior to commencement
of any works, These
drawings are not to be
used for scaling.
* Copyright for design &
drawings remain the
property of the authors.
CONSULTANTS
Stuctural Engineers
a
Project
TREE HOUSE
Location
10 PARK ROAD
NOOSA HEADS
Giient
FIRST PICKED PTY
Drawing Tite
FIRST FLOOR
Scale
as shown
Orawn By
SF 0703
Drawing No. Issue No.
SD.204 (2).
Date
JAN 07
Job No:
Page 10
~—
~ .
—
~ kidd
™—
designers
trunk lightweight cladding and | ~™ | fghtw inas.,
e battens to gable end, > eT een awnings . 20 Duke Street
~ Le ‘ Sunshine Beach QLD 4567
fidge flashings to ro nN
match roof sheeting... | ~~ PO Box 262
& ~ Noosa Heads QLD 4567
/ — fascia gutter. . =
turbo vent | ™— ~~ Telephone 07 5447 5633
lass balustrade, 20 Facsimile 07 5447 5833
trunk@® € fall fall > [ g mn SETp, =
fascia gutter. balustrade type 2 unk — Ck [email protected]
BED 1 eS OECK————s e ™ www.kiddco.com.au
metal roof sheeting... BELOW ber -
ES FFC26013 3 |@ uk This drawing i to be
Eg crea read in coriunction with
a — eee bread
lightweight awnings.. ——> XS Ce oe Eres rawings &
| ON EWE WaT] ,% | hatch indicates Constntion to comply
turbo vent © | —— direction of flooring with all relevant SAA 3
I g «E we 7 BCA Codes & standard
|_ppl|_onen riser stair 1 li = =| aluminium louvres Bidg Bytaw 1975 & as
lightweight cladding and + Mh: type 2 = hard wired smoke alarm, amended
battens to gable end. balustrade ——— battery backup Verify all dimensions on
tunk@ as|z7|28ala0|31|:2-}——=l step = ste prior to commencement
: Om So ay Stee eK wall mounted alr- of any works. These
nk @eZist B void g = conditioning split system drawings are not to be
glass balustrade, > ro ey 3 gr ECK BED 2 | above robe, condenser used for scaling,
ale 3 Eimber—| timber S| location TBA Copyright for desian &
tunk® Staeh 3 S |FRE 260% (FFL 26,038] = srunk drawings remain the
3g s sri | property of the authors.
lightweight cladding and 5 (—— asl asfaalza| ey it oe pee | e
battens to gable end, 3 —— tobe! ’, Oba g. joinery refer 800 CONSULTANTS
iM Se eee | series drawings Stuctural Engineers
| open riser stair + J | gy 5
fascia gutter. 14 | = EIS = | __fightweight cladding with
® | u 2 coverbattens.
Eco |
ridge fashings to oP: OP | ightweight
match roof sheeting.. ||) was W45 i ,
fall fal> || 4 \Y awnings over.
~~ trunk e BED 3
~ e bunk EXISTING trunk BELOW type 2 balustrade
~ _© VEGETATION Project
™ ae . metal roof sheeting... - fascia gutter, TREE HOUSE
a EXISTING Locaton
OF Statoven 6 VEGETATION 10 PARK ROAD
™ NOOSA HEADS
_ DP Client
a - = . FIRST PICKED PTY
‘men 1, ‘e Drawing Tite
~ . SECOND FLOOR
™ — Scale Date
35 tunk as shown JAN 07
lightweight cladding and IM op : e Drawn Job No:
/1\SECONDFLOOR “™"™* "TBR, ~ ors
—
~~ Drawing No. Issue No.
\ 80.205 / SCALE 1:100 @A3 ; ~
tninl
SD.205 (r2)
Page 11
we — oe
* a :
; _-”” barge flashing to match
a roofing, .
lightweight cladding and
battens to gable end.
ae fascia gutter, . Matera
lightweight cladding and "ate siaht awn PWE |
. battens to gable end: lightweight awnings, . mS ms re a)
aluminium framed louvres 4 :
lightweight awnings, . -” turbo vent
designers
turbo vent
UPPER - FL. 26.038, champ flashing to match
ee : pean
lightweight cladding and
battens to gable end.
20 Duke Street
Sunshine Beach QLD 4567
PO Box 262
Noosa Heads QLD 4567
2,576
Telephone 07 5447 §633
Facsimile 07 5447 5833
MID LEVEL- FFL. 23.4620 vee ee PASS TRS ESS, .. [email protected]
lightweight awnings, Of = ( VY“ y www kiddeo.com.au
aluminium framed doors
Tom eS 0?
fascia gutter, .
This drawing is to be
read in conjunction with
Engineers Drawings &
Reports,
Construction to comply
wih all relevant SAA &
Bidg Bylaw 1975 & as
amended
Verify all dimensions on
ste prior to commencement
of any works, These
drawings are not to be
used for scaling.
Copyright for design &
drawings remain the
property of the authors,
_ “Steel of over 18: 15° steel truss encased in
a lit shaft, . — Th painted FC, .
oe Tae QF UFT: RRL I7790 — sea posts,
a as pte, ———
CONSULTANTS:
Stuctural Engineers
3,400
oy INCLINATOR PLATFORM -_FFL 14.350,
tanked RC block parapet
retaining wall T.0.W. RL
10.200,.
Project
TREE HOUSE
Location
10 PARK ROAD
NOOSA HEADS
Client
FIRST PICKED PTY
Drawing Tite
SOUTH ELEVATION
Scale Date
as shown JAN 07
Drawn By Job No:
/T SOUTH ELEVATION nen
Keeaiz] scaters00 @x3 | a $D.502 (P2)
Page 12
barge flashing to. .
turbo vent match roofing, .
fightweight cladding and
battens to gable end,
. fascia gutter, ey
Tetal roof sheeting, .
27.5"
NN
lightweight awnings,.
fightweight cladding and
battens to gable end.
aluminium framed louvres
fascia gutter, .
lightweight awnings, .
turbo vent
aluminium framed louvres lightweight awnings,
designers
metal roof sheeting,
9
pp . ey,
UPPER LEVEL - *s
barge flashing to match — me + cme + me | es es ee ee EFL 26.038, ~UPPER
roofing, .
20 Duke Street
glass balustrade, Sunshine Beach QLD 4567
tefer 700 series
drawings
stee! posts.
DP lightweight cladding and
PO Box 262
battens to gable end.
Noosa Heads QLD 4567 —
piles.
2,576 J
~\ 275"
4 Soop steeeee
fascia gutter, . Telephone 07 5447 5633
MID LEVEL - F.FiS234622) FFL. 23.462_- MID LEVEL Facsimile 07 5447 5833
|
|
|
|
|
|
|
|
|
|
|
|
|
|
lightweight awnings, . [email protected]
aluminium framed doors www.kiddco,com.au
This drawing is to be
.. readin conjunction with
ts Engineers Drawings &
a
S s . |, Construction to comply
120.150, LS a IE aE EF 20.150 - GREBNNLO. 16.2 Concfonto cone
raking strut post connected ~~~ | BCA Codes & standard
<—— to main tse Bldg Bytaw 1975 & as
structural column, . Sea 8 amended
1s steet (oof over a Verify al dmensions on
——~ lift shaft, » Sité prior to commencement
ae of any works, These
EF.LA7.750 =TOPOF LIFT. 2 cravings ae natin be
a used for scaling,
fascia gutter, . / re Copyright for design &
drawings remain the
property of the authors,
CONSULTANTS
Stuctural Engineers
3,312
,
steel truss encased in
painted FC, .
Sa
steel posts.
3,400
FEL. 14.350_- INCLINATOR PLATFORM,
rain water harvesting tank
under reinstated dune on concrete
garage slab. .
spoon drain, .
Project
TREEHOUSE .
Location
10 PARK ROAD
NOOSA HEADS
Client
FIRST PICKED PTY
Drawing Tite
NORTH ELEVATION
Scale Date
as shown JAN 07
Drawn By Jab No:
SF 0703
Drawing No. ~ Issue No.
SD.501 (2)
(1. \NORTH ELEVATION
sa) SCALE1:100 @A3
Zz
Oo
Qt
: we
- Z < ERY
Page 13
aluminium framed louvres
turbo vent turbo vent — aluminium framed louvres
metal roof sheeting metal roof sheeting
fascia gutter fascia gutter
‘¢__———-— lightweight cladding and battens to gable end. i" | e| d
lightweight awning Sa o O
BED 2 PAVILLION
lightweight cladding and battens to gabie end.
lightweight awnings
turbo vent
BED 1 PAVILLION
turbo vent
turbo vent
BED 3.PAVILLION™
metal roof sheeting
designers
lightweight cladding and battehs to gable end,
c t
lightweight cladding and battens to gable end. ———————F |] TTT TEEPE We aye lightweight awnings,
EF 126.038 - UPPER 20 Duke Street
“ Sunshine Beach QLD 4567
lightweight awnings
aluminium framed fouvres
. PO Box 262
lightweight cladding and battens Noosa Heads QLD 4567
2.576 p
Telephone 07 5447 5633
Facsimile 07 5447 5833
MID LEVEL -_F.E.L, 23.462 LFFL. 23.462_- MID. LEVEL Saga
[email protected]
lightweight awnings, .
/ www.kiddco.com.au
aluminium framed doors hi tive ht awnings
ghwergnt awning This drawing is to be
f : read In conjunction with
lightweight cladding and t Engineers Drawings &
battens to gable end, : Reports.
/ i Construction to comply
/ FEL. 20.150 - GROUND wih all relevant SAA &
— ee I BCA Codes 8.
Bidg Bylaw 1975 & as
amended
3,312
3,312
GROUND - FF.L, 20.150 if
Sé ;
2,400
Verify af dimensions on
site prior to commencement
of any works, These
FFL. 17.750 - TOP OF Per 2 drawings are not to be
——- 7 eS et ee used for scaling,
Copynght for design &
drawings remain the
property of the authors. ©
CONSULTANTS
Stuctural Engineers
INCLINATOR DIRECTION
3,400
F.L. 14.350_- INCLINATOR PLATFORM
— — — ee Se
rain’
under reinstated dune on concrete , : 1 4 . /
garage slab. win ee 4 f
13,550
4 { render finish
Project
TREE HOUSE
Location
10 PARK ROAD
NOOSA HEADS *
: i Client
REINSTATED “ENTRY “AC block eveway retaining wa, FIRST PICKED PTY
DUNE . a / Dravng Te
REINSTATED
yp
BUNE
/
/
I
dune retaining parapet wall ,
I
7,750
retaining wall Submerged
below.dune,
——~/ ’ WEST ELEVATION
Scale Date
it REINSTATED | FL 6600 -BaSEMENT UJ astm
IT ‘~"BUNE
CT \WeSt ELEVATION == oo | | | - Sainte ae
\ s0.sos ] SCALET100 @ 3 . | SD.503 (P3)
RC block render finished driveway
retaining wall,
_\z BASEMENT - EFL-6! G0
Page 14
lightweight awnings, . turbo vent furbo vent aluminium framed louvres
metal roof sheeting, . fightweight cladding and battens to gable end.
. BED 2 PAVILLION
lightweight cladding and
fascia gutter, .
battens to gable end.
glass balustrade, refer 700
fascia gutter, . series drawings
metal roof sheeting, turbo vent DP
‘BED 3 PAVILLION
BED 1 PAVILLION
turbo vent
barge flashing to
ie
», SS
\ soso) SCALE1:100 @A3
metal roof sheeting, .
lightweight cladding and battens to gable end,
lightweight awnings, .
” S&S
A Can 20.150 -GRrounp,
EFL.30-296, - UPPER,
7
4,258
FFL. 26.038, UPPER, J
576
2
Fi. 23.462 - MID LEVEL.
*
3,312
kidd
oe
designers
20 Duke Street
Sunshine Beach QLD 4567
PO Box 262
Noosa Heads QLD 4567
Telephone 07 5447 5633
Facsimile 07 5447 5833
info@kiddco,com.au
www. kiddco.com.au
Construction to comply
with all relevant SAA &
BCA Codes & standard
Bidg By-law 1975 & as.
amended
Verify all dimensions on
Site prior to commencement
of any works, These
drawings are not to be
used for scaling.
Copyright for design &
drawings remain the
property of the authors.
CONSULTANTS
‘Stuctural Engineers
Project
TREE HOUSE
Location
10 PARK ROAD
NOOSA HEADS
Client
FIRST PICKED PTY
Drawing Tite
EAST ELEVATION
Scale Date
as shown JAN 07
Drawn By Job No:
SF 0703
Drawing No. tssue No.
SD:504 (2)
Page 15
. _baige flashing to match
ut soofing, .
_°7” fascia gutter, .
lightweight cladding and ue ‘i ntweight awm
battens to gable end. - ~ ightweight awnings, . —>
aluminium framed louvres — . -
turbo vent
turbo vent
OP >
“Beh
turbo vent
mo mmm es ee ee ee es es es ee see - eae flashing to match
_ UPPER: FL, 26038
pavill
metal roof sheeting, .
fo fascia gutter, .
fightweight awnings, .
<p
roofing, .
lightweight cladding and
battens to gable end.
fascia gutter, .
MID LEVEL - FFL. 23.462
lightweight awnings, .
aluminium framed doors
~ LIVING PAVILLION
<— steel posts.
steel truss encased in
painted FC, .
steel roof over
lift shaft, .
steel posts. —>
inclinator \
fascia gutter, .
| SHAFT
_ INCLINATOR PLATFORM,- EFL. 14.350
REINSTATED
DUNE
TELA
GARAGE
REINSTATED
DUNE ac
weet RC blockwork
a7" retaining wall,
of ref eng.
4
stab on ground.
oor slab on ground.
FEL, 6,600 - BASEMENT, _
(1 SECTION A
\so.s0r/ SCALE1;100 @A3
steel posts
kidd
+CO
designers
20 Duke Street
Sunshine Beach QLD 4567
PO Box 262
Noosa Heads QLD 4567
Telephone
Facsimile
07 5447 5633
07 5447 5833
[email protected]
www.kiddco.com.au
This drawing s to be
read in conjunction with
Engineers Drawings &
Reports,
Construction to comply
wih all relevant SAA &
BCA Codes & standard
Bidg ByJaw 1975 & as
amended
Verify all dimensions on
Site prior to commencement
of any works. These
drawings are not to be
used for scafing.
Copyright for design &
drawings remain the
property of the authors.
CONSULTANTS
Stuctural Engineers
Project
TREE HOUSE
Location
10 PARK ROAD
NOOSA HEADS
Client
FIRST PICKED PTY
Drawing Tite
SECTION
Scale Date -
as shown JAN 07
Drawn By Job No:
SF ~ 0703
Drawing No. tssue No.
SD.601 (2)
Page 16
@ BRISBANE | GOLD coast @ CABOOLTURE Unit 4 7235 Monier Road Unil 5 #36 Lawrence Drive ‘Unit s 142 Agrogroma Road Dara Ghd 4076 > Norang Qld 4211 Cabootture Old 4510 PO Bax 3983 POBox 2011 Darnt OLD 4070 Nerang Qtd 4211 PHONE: 07 37790800 PHONE: 07 9890 1599 PHONE: 07 5429 0755 FAX: 07 3279 0955. FAX: 07 S627 2027 FAX: 07 6420 2498 MORRISON EMAIL: ‘bristanolabdmorisongoo.com.ny EMAIL: goldeenstinbé>merisonano,com.au EMAIL: cabootturginh4Dmorisonnes.com.nu WEBSITE: eynwnomtsonona.com.ay . GEOTECHNIC Caboolture Laboratory Emall: [email protected] Ref No, 00979/so0 Job No, CE07/044 Author. N Morrison 40" May 2007 Kidd & Co Designers PO Box 262 NOOSA HEADS QLD 4567 . Attn: Mr Scott Falconer Email: [email protected] Dear Sir RE: 410 PARK ROAD NOOSA HEADS 1.0 INTRODUCTION The proposed tesidence is located on a steep west facing dune slope above Park Road, with vehicle access from Park Road, to a garage excavated into’ the toe of the slope. This report provides the geotechnical data required for confident design and addresses:- « The stability of the natural stope . . © The change in the stability risk with the construction of a residential dwelling « The importance of the garage construction , Approval for this work was provided in the email from Kidd & Co dated 24" April 2007. 2.0 SITE DATA This allotment has been the subject of geotechnical studies since 1981 when similar construction was proposed, but without the inclusion of a garage at the toe of the slope. Additlonal boreholes were drilled in 2004 and data from these boreholes was included in a geotechnical report for Whaley Consulting Group on behalf of their client Mr R Ure. Attached as Appendix A is a copy of our February 2004 report. It was found that soil profile on this dune slope consisted of 2.4 to 2.7 metres of very loose to loose sand covering medium dense sand to a depth of at least 14 metres. MORRISON GEOTECHNIG PTY LIMITED ABN 51 009 878 890 RPEUQ 2241
Page 17
3.0
.Job No. CE07/044
PRESENT BUILDING PROPOSAL
Arising out of many discussions and building submissions, data reviews by independent
experts and court appeals and the like, it was agreed that:-
Building on this dune slope was possible with strict controls
Large trees should remain ,
Storm runoff from the house and from the slope should be controlled
Domestic wastewater from the house should be taken to Park Road
Visual Impact should be minimal
The present proposal is the construction of a residence supported by steel screw piles, with a
garage at the toe of the slope.
4.0
41
4.2
DESIGN CONSIDERATIONS
Slope Stability
The overall slope at 30-32° (max) is marginally stable because of the presence of the
trees which have to remain. Piled foundations will provide a minor decrease of the
stability risk but most importantly is the treatment al the toe of the slope with the
garage and construction above.
_ The calculated Factor of Safety for the total face of the dune on No. 10 Park Road for
various slope conditions is given in Table 1 below.
Table 1 — Factor of Safety for Overall Slope
Slope Treatment Factor of Safety
No trees 0.92
Existing trees 1.0—1,1
With screw piles 1.0 — 1.1 (no change)
With retaining wall and garage at the toe 1.15-4.25"
of the slope
*Put another way the proposed construction increase the Factor of Safety of
the overall slope by at least 15 percent.
Piles Supports
The support of the proposed residence using screw piles requires penetration below
the very loose sand (say 3m) into the medium dense sand minimum depth of 5 pile
diameters. {f a spiral of 300mm is used, the minimum penetration is 4.5m from the
present ground level. Allowable bearing capacity values are given below that depth.
Table 2 - Base Resistance Screw Piles
Pile Depth below GL . np . Allowable Bearing Capacity
(m) Equivalent ‘N’ Value at Pile Toe (kPa)
4.5 § 240
5.0 - 13 520
5.5 45 600
00979 Kidds & Co Designers : MORRISON GEOTECHNIC
Page 18
* Job No. CE07/044 6.0 15 600 6.5 15 600 7.0 15 600 75 20 800 8.0 23 920 *Equiv ‘N’ = DCP btows/300 mm + 1.3 as a minimum vatue for this site On the basis of the above, a screw pile with a spiral diameter of 300 mm would carry a working load of 6.0 — 6.5 tonnes at a depth of 7.5 to 8.0 metres. 4.3 Garage Structure Excavation into the slope may be made using CFA (continuous flight auger) piles propped by the garage roof and sand anchors as necessary. a) Active Pressures Pressures on the high wall al the back of the garage may be calculated from i) ii) Very loose sand 0-3m Sand Density (y) Angle of Friction (4) Bip Active Pressure Coefficient Ka Uniform Pressure on Wall P,_ Medium Dense Sand > 3m Sandy Density Angle of Friction ($) Bid Active Pressure Coefficient Ka Uniform Pressure on Wall Pa 17 kNim? = 32 degrees = 1 (B= slope in degrees) = 0.85 = 0.65 yH Ky = 94H = 17.5 kNim? = 38 degrees = 0.84 = 0.5 = 0.65 yH Ke = 5.7H Active pressures on the garage wall are summarized on Figure 1. For a rigid and unyielding wall, increase the above pressures by a multiplier of 1.5. b) Passive Resistance Wall forces can be resisted by sand anchors or the garage wall acting as a prop, or a combination of both. Passive resistance from the sand on the Park Road side of the garage provides the restraint as, PR = 37D Kp PR = 1.5 yD* Ky B MR = 0.5 yD° K, B 00979 Kidds & Co Designers Pressure Force Moment MORRISON GEOTECHNIC
Page 19
5.0 a) b) °) Job No. CE07/044 Where y = Sand Bulk Density © B = Pile Diameter D = Pile Depth . Kp = Coefficient of Passive Resistance = 5.0 (0-—3m) = 10.0 (> 3m) LONG TERM EFFECTS The Residence . The residence may be supported on stee! screw piles, for which an allowable base resistance may be taken as a minimum of 500 kPa in medium dense sand, provided that:- « The piles are hot dip galvanized to protect against corrosion ¢ The minimum pile depth is 4.5m below the present ground level A further requirement is that the residence is braced or stiffened in the east-west direction at least at floor level. It would be prudent also to provide lateral restraint at ground ‘evel to overcome a potential sand.slip or downslope creep. This matter is discussed further in (b) below. ' Slope Stability The concept of a garage structure at the foot of the slope removes most of the slope stability risk, but the site above the garage remains at a slope exceeding the natural . angle of repose for dry running sand. Over the residence footprint area, the dune slope is about 32 degrees, which could slump to 30 degrees under dry conditions and loss of vegetation. If this was the case, a break in the slope of 600-700mm could occur at the rear wall of the residence, with a rise of the same amount as slip debris at the rear garage wall. A low retaining structure should be considered at least at the line of the rear of the residence. Design Parameters Sand Density = 17 kNim* Active Pressure Coefficient Kg = 0.9 Passive Pressure Coefficient Ky = = 0.9 Sand anchors could be used for horizontal (and moment) restraint. Anchors should continue into the medium dense sand below a depth of 2.5 metres, where a pull out resistance of 300 kPa is available as end bearing or 15 kPa as allowable friction. Disposal of Wastewater and Stormwater It is understoad that the residential wastewater and stormwater are to be taken to discharge points in Park Road. This is acceptable provided that the same parameters are used to provide a safe slope, which have been given for the residence. It may be necessary to support the conduits on drilled piers aver the very steep slope area. 00979 Kidds & Co Designers MORRISON GEOTECHNIC
Page 20
Job No. CE07/044 6.0 SUMMARY Construction of a residential dwelling on Lot 55 is technically feasible. There is low risk of an event which could cause a sand slip on this site, but this can be accommodated in the design. The garage structure removes most of the risk by providing support to the toe of the slope, but within the footprint area of the residence, there remains a need to cover the potential fora shallow slip. Low timber retaining struclures anchored at ground level provide a satisfactory solution. . 7.0 LIMITATIONS Recommendations given in this report are based on information supplied regarding the proposed building construction in conjunction with the findings of the investigation, Any change in construction type or in building location may require additional testing and/or make recommendations invalid. “ Every reasonable effort has been made to locate test sites so that bores are representative of the soil conditions within the area to be investigated. The client should be made aware however, that this assessment has been based on limited site data using small diameter boreholes. In some cases, soil conditions can change dramatically over short distances, therefore even careful exploration programmes may not locate all the variations. If soil conditions differing from those shown on the log sheet are encountered during construction, this office should be advised immediately. : Unless otherwise stated in commissioning documents, any dimensions or slope directions and magnitudes should not be used for any building or costing calculations. Any sketch supplied should be considered only as approximate pictorial evidence of site work. Yours faithfully . J MORRISON (RPEQ 748) for and on behalf of MORRISON GEOTECHNIC PTY LTD Encl. Appendix A — February 2004 Report Figure 1 — Pressure Distribution 00979 Kidds & Co Designers MORRISON GEOTECHNIC /
Page 21
MS OGRISBANE
POBox 4053
Dare QLD 4076
PO Bax 2015
Norong Old 4214
@ GOLD COAST & CABOOLTURE
Unt { 2285 Mandar Rood Unit § 126 Lawreeco Divo. Unit $142 Aerodrome Road
Dana Ot 4076 Nerang Cid 4211 Caboottuie Old 4510 .
I: HONE: 6 4500 PHONE: OY $400 0755
noe punee store os net oa MORRISON
Veni: meumaaneeema " GEOTECHNIC
Darra Office
Job No. 203E/194
Ref! 10096B/sw
Author: Neville Morrison
40th February, 2004
Whatley Consulting Group
PO Box 204
Ascot Qld 4007
ATTENTION MR BRIAN WHALEY FAX NO. 3268 5150
Dear Sir
RE: GEOTECHNICAL INVESTIGATION - ROBERTSON RESIDENCE
LOT 55 PARK ROAD, NOOSA HEADS
1.0 INTRODUCTION
This report records the results of a geotachnical investigation on the proposed residential site at
Lot 55 Park Road, Noosa Heads, {tis understood that a develapment approval has been given
by the Noosa Shire Council, which permits site access from Park Road,
The allotment covers part of a West facing dune slope and falls 26 metres from the rear to the
front boundary at an average slope of Just over 34 degrees and reduces to about 18 degrees
between the front boundary and Park Road.
itis understood that a garage Is proposed at the foot of the slope and Its rear (east) wall is
intended to support the dune slope. This concept Is the same as that used on the adjoining
development to the south.
Borehole data from the site Is included and design parameters are provided for the garage
structure and for the proposed residence.
it ls understood that the residence is to be of timber construction supported on steel screw piles.
MORRISON GECTECHNIC
PTY LIMITED ABN 51 009 876 899
RPEUG 2244
Page 22
Job No. 203E/194 2.0 FIELD WORK One borehole was dritled on this allotment in 1981 as part of a previcus investigation for a residential development, which did not include Park Road access, Two additional boreholes have been completed to provide design data for the present proposal. : Boreholes were drilled by hand on the steep slope and the materials encountered (sand only) are described on the racord sheets in Appendix A. At each location a dynamic cone penetrometer test (DCP) was carried out as a measure of the sand density. In this test a 9kg drop weight falling 500mm is used to drive a 30 degree tapered steel cone having a top diameter of 20mm and fitted to rods of smatlar saclion. For BH1 (1981) ‘ the penetration was measured as drop weight blows for successive penetrations of 150mm. tn the present (2004) tests, the blow count was recorded for successive penetrations of 100mm. DGP resulis are included in Appendix A. Test tocations are shown on the site plan. 3.0 RESULTS 3.1. The Site All three boreholes identified very loose sand from the surface to depths of 2.4m (BH2) to 2.7m . (BH1) over loose grading to medium dense sand. Borehole BH1 (1981) was continued to a depth of 14 metres in medium dens sand, Drilling in BH2 and BH3 was discontinued at 4 metres. DCP tesls in BH2 and BH3 were discontinued at a depth of 6 metres, 4.0 GEOTECHNICAL CONSIDERATIONS 4.1. The Site This is a very steep sand slope and the upper 2.4m to 2.7m ‘is potenilatly unstable. In an extrame event If trees were removed, the sand would adopt an angle of repose of about 30 degrees, similar fo that on exposed dunes in the Noosa areas. A minor unsupported excavation at the toe of the slape could cause a significant slip. 4.2. The Garage (BH2) 4.2.4, Genera! Comment Support to the toe of the slope by the garage removes the risk of a major slope failure. This is a significant and important structure and ils construction must, by necessity, have no impact on the slope as a whole. Any support wall requiring apen (unsupported) excavation or any construction involving significant vibrations should be avoided, A crib block wall, a reinforced earth wall or a sheet pile solution have no application on this sile. The use of a grout injected pile support is recommended. It Is understood that this solution is part of the present design. : 10096B Whaley Consulting Group (Robertson) MORRISON GEOTECHNIC
Page 23
Jab No. 203E/194 It is also understood that the garage roof will be used for construction material storage and the site of a crane. The garage wall therefore will be propped at the top. 4.2.2. Design Parameters i) Active Pressure [ : 4 Very loose Sand Pa = 11H; Medium dense Sand Ps = 7.2(H; +H.) ps = 0.85 7H Ky Where y = Soll Density = 17kN/m? K, = Very loose Sand = 09 K, = Medium dense Sand = 0.65 il) Passive Resistance The excavation will expose the medium dense sand where narmal Rankine pressure ‘esistance applies. P, #70 K, Where D = Pils depth below the excavation y = SoilDensity = 18kN/m* K,= 6.0 The passive pressure coefficient assumes wall friction /@ = 0.6 Propping loads can be taken by cantilever action on bored pile sunder the west garage wall. mo, For individual piles:- br = 39D Kp Pa = 1.5 yD?KpB Mg = 0.5 70° KpB Where B = Pile diameter 10096B Whaley Consulting Group (Robertson) MORRISON GEOTECHNIC
Page 24
Job No. 203E/194
rel
4.3. The Residence fh
The residence ners one on steel screw piles, for which an allowable base resistance
may be taken as 400kPa in medium dense sand, provided that~
i) The piles are hot dip galvanized to protect against corrosion.
ii) The minimum pie depth of 4.0m below the present ground level.
A further requirement Is that the residence is braced or stiffaned in the east-west direction at least
at floor level. It would be prudent also to provide lateral restraint at ground level to overcame a
potential sand slip or downslope creep, This matter Is discussed further in Section 5.
5.0 SLOPE STABILITY
The concept of a garage structure ai the foot of the slope ramoves most of the slope stability risk,
but the site above the garage remalns at a slope exceeding the natural angle of repose for dry
running sand, ,
Over the residence footprint area, the dune slope is about 32 degrees, which could slump to 30
degrees under dry conditions and loss of vegetation. If this was the case, a break in the slope of
600-700mm could occur at ihe rear wall of the residence, with a rise of the same amount as slip
debris at the rear garage wall. A {ow retaining structure should be considered at least at the line
of the rear of the residence,
Design Parameters
Sand:density : = 17kN/m®
Active pressure coefficientK, = 0.9
Passive pressure coefficlentK, = 0.9
Sand anchors could be used for horizontal (and moment) restraint. Anchors should continue into
the medium dense sand below a depth of 2.5 metres, where a pull out resistance of 300kPa Is
available as end bearing or 15kPa as allowable friction.
6.0 DISPOSAL OF WASTE WATER AND STORMWATER
tt is understoad that the residential waste water and stormwater are to be taken to discharge
points in Park Road. This is acceptable provided that the same parameters are used to provide a
safe slope, which have been given for the residence. It may be necessary to support the conduits
on drilled piers over the very steep slope area.
10096B Whaley Consulting Group (Robertson) : MORRISON GEOTECHNIC
Page 25
dob No. 203E/194 7.0. SUMMARY Construction of a residential dwelling on Lot 55 is technically faasible. There is a low risk of an event which could cause a sand slip on this site, but this can be accommodated in the design. The garage structure removes most of the risk by providing support to the toe of the slope, but within the footprint area of the residence, there remains a need to cover the potential for a shallow slip, Low timber. retaining siructures anchored at ground level provide a satisfactory solution. as “8.0 LIMITS OF INVESTIGATION Recommendations given in this report are basad on Information supplied regarding the proposed bullding construction In conjunction with the findings of the investigafion, Any change in construction type or in building location may require additional testing and/or make recommendations invalid. Every reasonable effort has been made to locate test sites so that bores. are representative of the soil conditions within the area to be investigatad. The client shoufd be made aware however, that this assessment has been based on limited sile dala using small diameter boreholes. In some cases, soil conditions can change dramatically over short distances, therefore even careful exploration programmes may not locate all the variations. !f soll conditions differing from those shown on the log sheet are encountered during construction, this office should be advised immediately. Unless otherwise staled in commissioning documents, any dimensions or slope directions and magnitudes should not be used for any building or costing calculations. Any sketch supplied should be considered only as approximate pictorial evidance of site work. Yours faithfully NJ MORRISON (RPEQ 748) for and on behalf of . MORRISON GEOTECHNIC PTY LIMITED Encl Site Plan Appendix A - Borehole Record Sheets 10096B Whaley Consulting Group (Robertson) MORRISON GEOTECHNIC
Page 26
| Borehole Location Plan MORRISON 17 GEOTECHNIC ee BH1 (1981) Legend BH3 Borehale location > BH3 (2004) Scale: 200 > BH4 (2004) Lot 55 Park Road
Page 27
APPENDIX A BOREHOLE RECORD SHEETS
Page 28
Re we wre wwe ee ee
Bore l.
[ Client: W. W. Blair Pty. Ltd.
Project: Proposed Residence
Location: Lots 2 and 3 Park Road, Noosa Heads.
Job No. 815/362
Date: LOth August, 1981
Surface Rule
i perry SAMPLING & FIELO TESTING
OF BIT
STRATA CLASSIFICATION use
' CHANGE Australian Standard 1288 — 1977 Cepth Type . Field Tezt
(ml im) Reswhts
DC | Blows/250mn
0 SURFACE 0-0.15 ‘ 1.
SAND (SP) : 0.15-0. 30°! 1
very loose, fine to medium grained, grey, 0,30-0.45 1°
trace of organic matter, moist. 0,45-0.60 1
‘ ' ‘ 0.60~0.75 0
0.60 |SAND (SP) 0.75-0.90 1
{very loose, fine to medium grained, grey, 0.90-1.05 1
moist. . me" 1 2.05-1.20 0
- 1 4.20-1,35 1
1.35~1,50 0
1.60 ,| SAND (SP) *71.50-1,65 1
\ very loose, fine to medium grained, brown |
and dark brown, moist. ‘ - 1.65-1.80 1
: o 1.80-1.95 I
1,95-2.10
2.10-2.25 +
2.25-2.40 2
2.40-2.55
2,.55-2.70 a
2.70 | SAND (SP) 2.70-2.85 5
as above, 1.60-2.10m, loose to medium dense, 2,85~3.00 sf 8
4.00~4,15 5
4.15-4,30 7
4.30-4.45 8
4.90 | SAND (SP) “5.
medium dense, fine to medium grained, off 315.8. 35 14
: white and brown, moist. 5. 30-545 11
1 . . . . ef NN
) 6 .00-6.15 13
. 6.15-6_30 11
. 3/6. 30-6. 45 4 13
{ cont. sheet 2
WATER
DAILL TYPE: HAND AUGER = NOTEO:
|
| pare: M. BURNETT AND M. COYLE syeapy
U S0-Undiswrsed 50mm diam. tubs sampie
| 0 -Olsurbed Samole
Vo = Steal V Bit
q SPT -Standerd Panewration Test, N. Value ix number of blows vo driva 50mm
q sompler 300mm with 3 61.6kg drop hammer ialling 762mm, Blow
count shown { ) is the number af blows required to driva USO
200mm. '
| P= Hand panetromerer estimace of shear strength, kPa
| So - Vane sheor value, kPa . ™
SS Sok SURVEYS PTY, LTD.
=
CONSULTANTS IN THE APPLIED EARTH SCIENCES
22 KENSAL ST., MOOROOKA. Q, Ph.: 48 0333
Page 29
".RECORD OF BOREHOLE
Bore 1
| cient: W. W. Blair Pty. Ltd.
Project: Proposed Residence
Location: Lots 2 and 3 Park Road. Noosa Heads
I-
Date: 10th
Surface R.L.:
‘Job No: 815/362
August, 1981
DEPTH SAMPLING & FIELO TESTING
OF . SIT -
STRATA CLASSIFICATION USED
CHANGE Australian Standard 1289 — {977 oearh Type ; Field Test
DC_IBlows /150mm
! cont. from sheet 1 ;
i 7.00-7.15 6
7.15-7.30 7
7.30-7.45 7
i 7.60 | SAND (SP) :
medium dense, medium to fine grained, pale 8.00-8.15 9
] brown, moist. . 8. 15-8. 30 11
| , 8.30-9.00 10
| 9.00-9.15 7
ty 9.15-9.30 9
9. 30-10 .00 ll
10.0-10.15 1
: 10.15-10.3 12 .
10.3-11.0 13
| 11,0-11.15 7
11.15-11.3 10
; 11.3-12.0 11
| ;
: 12.0-12.15 12
| 12.15-12.3) 12
12..3-13.0 13
13.0-13.15 8
13.15-13.3 8
.| ; 4 13.3-11.8 lo
. a
' ) 13.80 | LIMIT OF HAND AUGER/BORE CAVING 13.8-13.95 8
i DRILLING DISCONTINUED. 13.95-14.1 10
. ; - __ | 14.1-14.25 11
{
!
1
i
4 . WATER
DRILL TYPE: HAND AUGER NOTED:
: DATE: M. BURNETT AND M. COYLE STEADY
? ’ LEVEL:
U 50-Undisturbed SOmm diam. tube sample
D -Oilsturbed Sample
SPT -Standard Penetration Test, N. Value is number of blows to drive SOmm
sampler 200mm with a 63.6kg drop hammer falling 762mm. Blow
count shawn [ } is the number of blows required to drive USO
Pp Hand penctrometer estimate of shear strength, kPa
S — Vane shear value, kPa
Vo = Steel V Bit
coun 5 SOIL SURVEYS PTY. LTD.
. Ss
CONSULTANTS IN THE APPLIED EARTM SCIENCES
22 KENSAL ST., MOORGOKA. Q. Ph: 48 0333
Page 30
ts MORRISON GEOTECHNIC PTY LIMITED incorporating Soil Surveys Technical Services A.B.N. 51 009 878 899 PO Box 3063, Darra 4076 Telephone: (07) 3279 0900 Fax: (07) 3279 0955 NATA LABORATORY 1169 Record of Borehole CUENT: WHALEY CONSULTING GROUP JOB NO. 203E/194 PROJECT: GEOTECHNICAL INVESTIGATION ORDER NO. LOCATION: ~ LOT 55 PARK ROAD, NOOSA HEADS DATE: 30.14.04 Bore No. 2 [ Surface RL: Sampling and Field Testing Depth of Classification Australian Standard 1726-1993 Bit Depth Type | Field Test Strata Used | (m) Results Change (m) ' 0.00 Silty SAND (SM) Very loose, fine to medium grained, grey, with organics, moist. 1.60 SAND (SP) Loose, fine to medium grained, pale grey, moist. 2.70 As above but medium dense. 3.00 Silty SAND (SM) Medium dense, fine to medium grained, dark brown, moist. 3.40 SAND (SP) Medium dense, fins to medium grained, brown, moist. 4,00 BOREHOLE TERMINATED Drill Type: | HAND AUGER Waier Noted: - Driller. Logged by S Harry Steady Level: - U50 Undisturbed 50mm diam. tube . S$ Vane shear value. kPa. oO Olsturbed Sample Vv Steel V Bit SPT Standard Penalration Tesi, N Value is number of blows to drive 50mm TC Tungsien Carbide Bit sampler 300mm with a 63.6kg hammer falling 762mm. Blow count DC Jis the number of btows required to delve USO 300mm PP Hand penetrometer estimale of unconfined compressive strength qu, kPa 10096BH/1 Dynamic Cone Test, 9.09kg hammer, fall 508mm, driving 30 degree taper cone 20mm, fitted to rods of smaller section,
Page 31
ts
MORRISON GEOTECHNIC PTY LIMITED
Incorporating Soil Surveys Technical Services
A.BN. 51 009 878 899
PO Box 3063, Darra 4076 Telephone: (07) 3279 0900 Fax: (07} 3279 0955
NATA LABORATORY 1169
Record of Borehole
CLIENT: ‘WHALEY CONSULTING GROUP JOB NO. 203E/194
PROJECT: GEOTECHNICAL INVESTIGATION ORDER NO.
LOCATION: LOT 55 PARK ROAD, NOOSA HEADS DATE: 30,1,04
Bora No. 3 [Surface RL: Sampling and Field Testing -
Depth of Classification Australian Standard 1726-1993 Bit Depth Type | Field Test
Strata | Used | (m) Resulis
Change (m) : .
0.00 Silty SAND (SM)
Loose, fine to medium grained, grey, with organics,
moist. :
1.20 SAND (SP)
Loose, fine to medium grained, pale grey, moist.
3.00 SAND (SP)
Medium dense, fine to medium grained, brown, moist.
4.00 BOREHOLE TERMINATED
Drill Type: | HAND AUGER Water Noted: -
Driller: Logged by S Harry Steady Level:_-
U50 Undisturbed 50mm diam. tube S Vane shear value. kPa.
D Disturbed Sample Vv Steel V Bit
SPT Standard Penetration Test, N Value Is number of blows to drive 50mm TC Tungsten Carbide Bit
sampler 300mm with a 63.8kg hammer falling 762mm. Blow count DC
{ )is the number of blows required. ta drive U50 300mm
PP Hand. penatromater astimate of unconfined compressive strength qu, kPa
10096BH/2 :
Dynamic Cone Test, 9.09kg hammer, fall
508mm, driving 30 degree taper cone 20mm,
fitted lo rods of smaller section.
Page 32
10096BH/3 Morrison Georecunic Pry Livirep incorporating Soil Surveys Technical Services ABN, 051 009 878 899 PO Box 3063, Darra 4076 Telephone: (07) 3279 0900 Fax: (07) 3279 0955 Job No. 203E/194 DYNAMIC CONE TEST AS 1289 6.3.2 Construction at Lot 55 Park Road, Noosa Heads DATE TESTED: 30,1.04 TEST NO: DC1 ‘ TEST NO. DC1 (cont) Location Adj BH2 Adj BH2 Depth Blows / 100mm. 0,00 - 0.10: Own Weight 3.00 - 3.10 2 0.10 - 0.20 ‘ 3.40 - 3.20 2 0.20 - 0.30 . 3.20 - 3.30 3 0.30 - 0.40 . 3.30 - 3.40 3 0.40 - 0.50 1 3.40 - 3.50 4 0.50 - 0,60 0.5 3.50 - 3.60 4 0.60 - 0.70 0.5 3.60 - 3.70 4 0.70 - 0.80 0.5 3.70 - 3.80 4 0.80 - 0.90 0.5 3.80 - 3.90 4 0.90 - 1.00 4 3.90 - 4.00 _4 1.00 - 1.40 0.5 4,00 - 4.10 4 1.10 ~ 1.20 0.5 4.10 - 4.20 5 1.20 - 1.30 1 4.20 - 4.30 4 1.30 - 1.40 . i 4.30 - 4.40 4 4.40 - 1.50 4 4.40 - 4.50 3 4.50 - 1.60 4 4.60 - 4.60 2 1.60 - 1.70 4 4.60 - 4.70 3 1.70 - 1.80 2 4.70 - 4.80 3 1.80 - 1.90 1 4.80 - 4.90 4 4.90 - 2.00 2° 4.90 - 5.00 4 2.00 - 2.10 2 5.00 - 5.10 6 2.10 - 2.20 2 5.10 - 5.20 5 2.20 - 2.30 2. §.20 - §.30 6 2.30 - 2.40 2 5.30 - 5.40 7 2.40 - 2.50 2 5.40 - 5.50 & 2.50 - 2.60 2 5.50-- 5.60 40 2.60 - 2.70 2 5.60 - 5.70 40 2.70 - 2.80 3 5.70 - 5.80 40 2.80 - 2.90 3 5.80 - 5,80 44 2.90 - 3.00 3 5.90 - 6.00 12
Page 33
Morrison Geotecanic Pry Liwrrep Incorporating Soil Surveys Technical Services A.B.N. 051 009 878 899 PO Box 3063, Darra 4076 Telephone: (07) 3279 0900 Fax: (07) 3279 0955 Job No. 203E/194 DYNAMIC CONE TEST “AS 1289 6.3.2 Construction at Lot 55 Park Road, Noosa Heads DATE TESTED: 30.1,04 TEST NO, DC2 TEST NO. DC2 (cont) Location Adj BH3 Adj BH3 Depth Blows / 100mm 0.00 - 0,40 1 3.00 - 3.10 4 0.10 - 0.20 4 3.10 - 3,20 5 0.20 - 0.30 4 3.20 - 3.30 4 0.30 - 0,40 4 3.30 - 3,40 4 . 0.40 - 0.50 4 3.40 - 3.50 3 0.50 - 0.60 4 3.50 - 3.60 3 0.60 - 0.70 06 3.60 - 3.70 3 0.70 - 0.80_- 0.5 3.70 + 3.80 3 0.80 - 0.90 4 3.80 - 3.90 4 0.90 - 1.00 4 3.90 - 4.00 4 4.00 - 1.10 4 4,00 - 4,10 4 1.10 - 1.20 0.5 4.10 - 4.20 4 4,20 - 1.30 0.5 4.20 - 4.30 4 1.30 » 1.40 i 4,30 - 4.40 5 4.40 - 1,50 4 4.40 - 4.50 8 4.50 - 1.60 4 4.50 - 4.60 6 4.60 - 1.70 2 4.80 - 4,70 Z 41.70 - 1.80 4 4.70 - 4.80 7 41.80 - 1.90 2 4,80 - 4.90 8 4.90 - 2,00 2 4.90 - 5.00 5 2.00 - 2.10 2 §.00- 5.10 4 2.10 - 2.20 2 §.10 - 6.20 6 2.20 - 2.30 2 §.20 - 5,30 5- 2.30 - 2.40 2 §,30 - 5.40 8 2.40 - 2.50 3 §.40 - 5.50 44 2.50 - 2.60 3 5.50 - 5.60 Z 2.60 - 2,70 4 5.60 - 5.70 § 2.70 - 2.80 4 5.70 - 5.80 8 2.80 - 2.90 4 5.80 - §,90 7 2.90 - 3.00 4 5.90 - 6.00 10 10096BH/4
Page 34
Very loose SAND H= 0-3m H> 3m Medium dense SAND p=5.7H GARAGE RETAINING WALL CE07/044 PRESSURE DISTRIBUTION _
Page 35
ae _ HORTICULTURAL CONSULTANCY . - =
aan PO: BOX 3, .KIN:KIN QLD. 4571. -Ph:(07): 5486. 7164 ne
yee ~ Email: leafandlimb@bigpond. com: coe
‘. oe _ Arborist t Report -
‘0. Park Road.
Noosa Heads a
QLD 4567.
: Produced by: .
. " Mr SamuelA R Cowie’ oo.
~ Leaf and Limb Horticultural Consultancy” ve
7 of May 2 2007.
ee ne
HORTICULTURAL/ARBORICULTURAL CONSULTANCY * SURVEYS * TREE ASSESSMENTS * TREE REPORTS * RESISTOGRAPH TESTING
Page 36
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 ' Summary Mr Scott Falconer of Kidd + Co Designers requested this tree report for the site at No 10 Park Road Noosa Heads QLD, after discussion with Noosa Council Officers, to assess the impact of the proposed development on the trees. The aim of the project is to retain as many trees as possible on site prior, during and after construction of the proposed development. This report is a full arboricultural development assessment that includes the tree retention and protection procedures from the tree management plan from the previous development on the site. The site was inspected on the 6" of May 2007 to document and assess all the trees shown on . the plans supplied. A previous site inspection was conducted in September 2006. The report details the trees on the site and root growth noted during inspection, including investigations from other sites in close proximity. The report aims to detail the best arboricultural practices and required protection methods for the construction of the proposed development, including long-term tree and vegetation planning. Published research by Matheny and Clark (Matheny & Clark 1998),. including references from Harris (Harris 2004) are the basis of the tree protection methods in this report. Due to an example of root growth from an exposed dead trunk base, and other examples found during inspection of other sites in close proximity, root growth characteristics are given based on this example and references from Perry (1982 & 1994). Assessment of excavation impacts was taken from BS5837: 2005. Tree identification was done using several references, including Haslam (2004). All other literature cited or reviewed i is listed in the references at the end of the report. Tree No 57 This tree is the property of Noosa Shire Council, therefore any risk assessment of the damage caused by the sewer line construction is their responsibility. There is the major possibility that the trees’ structural integrity has been severely compromised by the loss of the tension roots during construction of the sewer line, therefore requiring removal and replacement due to the high target value present. Any further assessment of the impacts of the driveway construction therefore cannot be undertaken until council’s final decision on the tree. Garage Construction & Trees No 47, 48, 49 & 50. Currently tree No 47 is dead, therefore its interaction with the proposed development is nil. Removal of the tree will be required prior to construction being undertaken, but due to slope stability issues retention of the stump and major woody roots will assist in erosion control. Planting of a replacement tree after construction is the best course of action. Tree No 50 is in very poor condition, as the canopy has died, resulting in epicormic growth off the main trunk. Long-term retention of this tree is not viable. Removal (stump retention) and replacement with a suitable tree after construction is therefore the best course of action. Trees No 48 and 49 are is such close proximity to the excavation of the garage and lift construction that massive lateral root loss will result in either tree decline or death. As the garage/lift construction will support the slope after construction, the removal and replacement of these two trees is the best course of action. Building Foundations Given the use of pile/screw pile foundation using the friction, method instead of pads due to slope characteristics, installation of the foundations will have very little impact on tree root systems and the trees’ long-term retention on site. The retention of the trees above the garage construction (aside from Trees No 47, 48, 49 & 50) is required to assist-in the stabilisation of Leaf and Limb Horticultural Consultancy Prepared by Mr Samuel A R Cowie 7” of May 2007
Page 37
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 the slope. It should be noted that several small trees or large shrubs currently occupy the foot print of the proposed development, if removed, their stumps and roots should be left on site for erosion control. The construction of the house along the top of the piles will help minimise disturbance to the soil surface, thus enabling minimum disturbance and retention of all trees after foundation construction. The use of the tree management plan documented in the recommendations of this report will assist in maintaining the trees on the site during construction. Future Landscaping Additional planting of future replacement trees and vegetation. is recommended for the long- term soil stability either above or below the proposed development. This should include the area underneath the building. Recommendation is made that the Tree Management Plan (TMP) contained within this report is using prior, during and after construction to insure minimum impact on all trees and _ vegetation being retained. Leaf and Limb Horticultural ConsultancyO Prepared by Mr Samuel A R Cowie 7 of May 2007
Page 38
TABLE OF CONTENTS Introduction Methodology. Observations | 3.1 Site Soils 3.2 Comparative Root Investigations 3.3 The Trees 3.4 Proposed Foundation Types Discussion 4.1 Root Growth Patterns 4.2 Tree Protection Methods 43 Pier and Beam 4.4 Site Slope Stability Conclusions 5.1 Tree No 57 5.2 Garage Construction & Trees No 47, 48, 49 & 50 ~ 5.3 - Building Foundations : - 5.4 Future Landscaping Recommendations 6.1 Additional Management Practices Tree Management Plan References Appendix A List of Photos Nol No2 No 3 List of Diagrams Nol No2 Attachments - Site Plan (Dwg No 101, Issue P3) - Basement (Dwg No 201, Issue P2) Page UNnNnnr wnnn 10 10 10 10 11 16 17 bPw
Page 39
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 1 11 2.1 Introduction Mr Scott Falconer of Kidd + Co Designers requested this tree report for the site at No 10 Park Road Noosa Heads QLD, after discussion with Noosa Council Officers, to assess the impact of the proposed development on the trees. The aim of the project is to retain as many trees as possible on site prior, during and after construction of the proposed development. This report is a full arboricultural development assessment that includes the tree retention and protection procedures from the tree management plan from the previous development on the site. The site was inspected on the 6"" of May 2007 to document and assess all the trees shown on the plans supplied. A previous site inspection was conducted in September 2006. The report details the trees on the site and root growth noted during inspection, including investigations from other sites in close proximity. The report aims to detail the best arboricultural practices and required protection methods for the construction of the proposed development, including long-term tree and vegetation planning. Methodology Published research by Matheny and Clark (Matheny & Clark 1998), including references from Harris (Harris 2004) are the basis of the tree protection methods in this report. Due to an example of root growth from an exposed dead trunk base, and other examples found during inspection of other sites in close proximity, root growth characteristics are given based on this example and references from Perry (1982 & 1994). Assessment of excavation impacts was taken from BS5837: 2005. Tree identification was done using several references, including Haslam (2004). Ail other literature cited or reviewed is listed in the references at the end of the report. Mr Scott Falconer supplied plans of the proposed development that are cited ‘where references are made to building construction. Also supplied was a PDF copy of the development permit from GMA Certification Group Pty Ltd (including associated documents), dated.the 8" of January 2007. ‘ Tree condition and health are assessed for the species and its age class, based on foliage colour, foliage density, shoot elongation, woundwood development, lack or minimal signs of epicormic growth and twig dieback. A diameter tape was used for all measurements, giving an average diameter based on the , circumference measurement. Diameter at Breast Height (DBH) is taken at 1400mm above ground level on the highest side of the trunk. A Ricoh RR 1 digital camera (set at the highest resolution) was used for photographic documentation. : No Resistograph®, Picus Tomograph®, full laboratory soil analysis or root excavation assessment was carried out, unless noted in this report. All tree assessment was carried out from ground level. Leaf and Limb Horticultural Consultancy © - Prepared by Samuel Cowie . : 7® of May 2007
Page 40
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 3.1 3.2 3.3 Documentation The Site Soils . The report by Morrison Geotechnic (dated the 10" of February 2004) details the geotechnical considerations of the stability on the natural site and its make up. The bore hole investigations conducted on the 30" of January 2004 show loose fine to medium grained silty sand with organic material as the A horizon layer. This is consistent with observations during site inspection. The soil remains as a loose sand until 3 metres depth, at which point a medium dense fine to medium grained sand is recorded. Both boreholes were terminated at 4 metres. The depth of the sand plays an important part of tree root © development (see photo No 1) as outlined in 4.1 of this report. Comparative Root investigations Previous investigations on a site in close proximity to 10 Park Road discovered the best example of root growth (see Photo No 1) for trees growing naturally on the sandy soils found on the site. A soil slip had exposed the formation of the first radical root that had become a major tap root extending deep into the loose sandy soils on the slope (see 4.1 of this report). Normal lateral formation of the major woody root system that extends normally from the trunk base was reduced in size, and grew out of the top 500mm of taproot. This development of lateral roots was again observed to be consistent on the site of 10 Park Road, as with other sites in close proximity. The trees that have germinated and grown on the site as part of the naturally endemic vegetation all show signs of soil buildup on the high side of the trunk with lateral root development showing on the low side due to sand slippage. All Ficus species seen on the site show strong lateral root development, with one semi mature Ficus benjamina example (not documented on the plans) found below Tree No 17 showing strong lateral root development possibly due to pot production methods. : The Trees Ho . The tree survey conducted on the 6" of May 2007 is attached as Appendix A in this report. Two plans are attached showing trée locations, both from Kidd’ + Co Designers (Dwg No SD.101, issue P3, and SD. 201, Issue P2). All attached plans have trunk locations highlighted in relation to buildings shown. The following trees should be noted during assessment and construction phases. Trees are listed from the bottom to the top of the site. Tree No68 Council tree. Tension roots on driveway side. Tree No57 Council tree. Possible tension root damage due to previous sewer line construction (see Photo No 2). Two severed roots, consistent with Eucalyptus tereticornis wood, found at the site measured approximately 100mm diameter. Tree No 50 Canopy death, some epicormic growth on trunk, reason unknown. Leaf and Limb Horticultural Consultancy © Prepared by Samuel Cowie 7 of May 2007
Page 41
ae,
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 . 3
Tree No 47 ‘Dead.
Tree No 56 Dead
Tree No.17 Distorted and suppressed canopy due to Tree No 16, may
require pruning for building clearance.
Tree No3 Wound on tension side of trunk, will require future monitoring
: (see Photo No 3). Loss of soil on low side of trunk.
Tree No.5 ° Large Ficus with one low lateral that may require removal for
building clearance.
Tree No 43 ° Dead
ciate ae are fx ee
Photo No 1- showing a dead stump located on a site in close proximity to 10 Park Road (<S0
metres distance) that has been exposed by a soil slippage or erosion. The red line indicates the
original soil tevel. Soil characteristics of the site may be seen around the stump. Note that
‘major woody root development is in the top 500mm of original soil-depth, whilst taproot
development is increased due to sandy soils. :
Leaf and Limb ‘Horticultural Consultancy © : :
Prepared by Samuel Cowie ae 7" of May 2007
Page 42
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 4
ech oor a PCE, a Cates ae a gi eS 7
Photo No 2- showing the high side of Tree No 57 and the proximity of the
Tecent sewer line construction (green bag, red arrow points to manhole).
Severed root is indicated by yellow arrow.
a aoe
OF
Photo No 3- showing the tension side wound on Tree 3.
Leaf and Limb Horticultural Consultancy ©
Prepared by Samuel Cowie - . 7” of May 2007
Page 43
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 5 3.4 4... Proposed foundation types Construction of the upper sections of driveway, the sub terrain garage, and the lift shaft will require deep excavations (shallower for driveway). This will have significant impact on Trees No 47 (dead), 48, 49, and 50 (canopy death) as shown on modified drawing SD, 201, Issue P2 (Kidd + Co Designers). No engineering specifications are given as to retention of the site soils during construction, although it is assumed the continuous sheet piling method will be , used. Garage floor level is given as 6.600. Calculation of the levels in close proximity to Tree No 57 indicates possible lateral root loss due to lowering.of the soil level, although damage due to the sewer line construction may require removal of the tree already. The building foundations are marked as screw piles as per the engineers’ specifications. The use of screw piles allows placement in between tree roots (major woody roots and rope roots) during construction, after hand excavation of a 500mm deep pilot hole to avoid roots, thus minimising damage to the trees. - Discussion Root Growth Patterns. Roots’are opportunistic in nature, only growing where adequate supplies of water, nutrients and oxygen are available. In sandy soils oxygen is available at a depth greater that normal due to the large air spaces located between individual sand particles. Perry (1982, page 204) notes that roots can grow to great depths of 10 metres or more when oxygen, water and nutrients are available at these depths. In these instances a tree will form a taproot from the first radicle, descending into the sandy soil until it encounters limiting factors. From this first radicle secondary roots form around or below the root collar in the top layers of soil to ‘take advantage of nutrients and mycorrhizae fungi in the organic rich soil surface. Between four and eleven major woody roots will be formed around the root collar (point of contact between root system and trunk) to spread out laterally through the soil to a distance of 1 to 4 metres depending on the size of the tree (Perry 1982, page 201). These woody roots will decrease in diameter between 1 to 4 metres from the trunk before forming an extensive network of roots 10 to 25mm in diameter. Sometimes a.taproot will branch to form a secondary layer of roots if a soil layer is encountered where oxygen supplies are insufficient to support root growth (Perry 1982, page 202), which in heavier soils such as clay may only be 300mm deep. Photo No 1 is a-good indication of taproot development and surface major woody root formation in the sandy soils on sites along Park Road Noosa Heads. Leaf and Limb Horticultural Consultancy © - Prepared by Samuel Cowie : 7” of May 2007 eT ea
Page 44
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 6 4.2 Recent excavations and investigation confirms the distribution of major woody roots and rope roots out of the main taproot as seen in Photo No 1. The majority of roots found were in the top 500mm of soil level, most likely due to the availability of nutrients in the hummus layers on the surface. This is consistent with Perry’s descriptions of root growth (Perry 1994, page 4), where he describes the rope roots as transport roots that support the feeder roots that grow upwards into the A horizon soil (hummus layer on the site). Tree protection methods Tree protection involves the minimising of damage to the trees root and vascular system during construction, thus reducing the chance of tree health decline or death, and the possible damage to the structural stability of the tree from root damage. This can be achieved by protecting the both the trunk and lateral root system from direct damage, thus stopping loss of future structural support (trunk damage) or loss of ability to support active tree growth (root damage). Protection of the root system can be achieved by minimising disturbance to the surrounding soils, such as compaction or excavation, and protecting destruction of structural-roots greater than 25 mm in diameter. Soil compaction should be minimised through the use of scaffolding, otherwise suffocation of the feeding roots may lead to a decline in tree health. Protection of the roots then allows the tree to continue supporting the above ground sections. Under BS5837: 2005 protection distances are specified for the protection of a trees root system-from soi! level changes such as excavation (example Garage construction on 10 Park Road). Using the required tree protection zones ~ specified in BS5837: 2005, trees No 48 and 49 are unretainable due to the damage (root system) caused by the excavation of the garage/lift construction. In situations where foundations are to be installed over the tree protection zone, protection of the root zone by using scaffolding (to stop compaction or disturbance of the soil) over the root system that will be nearest the construction zone, and the spreading of composed mulch (to a depth of 75 to100mm) and filter fabric to absorb spills is recommended. In the case of steep sandy sites, the use of jute matting that is pegged down at regular intervals will also stop erosion due to foot traffic from trades people working ’ on the site. Protection of the trunk can be achieved by strapping hession around the trunk, followed by timber slats (50 by 50mm) held upright by further hession wrapping. ‘Appropriate signage indicating the importance of the tree - protection measures and the people to contact if access is required should be attached to the tree protection fencing. (TPF). Leaf and Limb Horticultural Consultancy © . Prepared by Samuel Cowie sors : 7” of May 2007
Page 45
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 7 43 Pier & Beam. . The use of pier and beam construction methods minimises the impact of the construction to the trees root system by limiting disturbance (see Diagram 1 & - 2). Whére possible it is advantageous to use pile construction onto bedrock rather than a pad for supporting the pier. It is assumed that the screw piles to be used on the site at No 10 Park Road are friction based (see diagram No 1), instead of requiring a pad for support, thus minimising disturbance. The distance between the bottom of the slab and the ground level should be a minimum of 200mm to allow installation of irrigation under the slab or floor level, thus insuring continued root growth in the area. Given the minimal impact on the site soils and the trees root system, pier and beam construction may be conducted to within 400mm of the trunk of a tree if suitable space is found between major woody roots (see Diagram No 2). Hand excavation of a pilot hole (500mm depth) prior to the start of screw pile installation is recommended so as to minimise damage to major woody roots greater than 25mm. If roots greater than 25mm are in the area for a pier/screw pile, then movement of the pier/screw pile to either side is recommended, and should be accounted for by the structural engineer designing the foundation. Generally a structural engineer should allow for a maximum horizontal variation of 500mm for alternatively locating the screw piles to miss roots. Supervision of the foundation installation is recommended by aqualified — arborist, otherwise damage caused during installation may go unnoticed or be buried by the builders, thus leading to decline and structural instability of the affected trees in the future. Leaf and Limb Horticultural Consultancy © : Prepared by Samuel Cowie - : 7 of May 2007.
Page 46
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 8
fee peo neem arco FIGURE 4.12
| Foundation systems
: differ in how they
! provide support to
' the structure, and
the excavation
wieeier needed to construct
Rena Hy F * the footing also varies
Fenner greatly. Abasement
wall foundation (a)
* requires the greatest
_ amount of excavation,
« Perimeter wall (b) and
| ground slab founda-
1
fs). Basement tions (c) require a
. t | specified depth of
: wall foundation | compacted soll
™e | beneath them.
Excavation to com-
| pact the soll should
| be added to the depth
| of the footing to
determine Impacts,
| Pler and grade beams
| (d) require drilling
‘ SS i holes for plers as well
5) Perimeter AEE E as excavating a trench
¢ owl (or frost Se i S . | 42 to 18 inches deep
‘wall) foundation Se ‘Lipase - for the grade beam.
‘y + Minimum excavation
Is required with pier
— _ foundations with
NN grade beam placed
above grade (e).
, (Drawings a-<c after
Ching 1985.)
i
i
i
jeidab foundation ade
re =m ei
a mE
Diagram 1- Showing foundation types. Note Pier foundations (e). (Matheny &
Clark 1998, page 53). Screw piles using friction are the same as pier
foundations without the pad support (left hand side of pier diagram).
{e) Pier foundation xb
Leaf and Limb Horticultural Consultancy ©
Prepared by Samuel Cowie . , 7" of May 2007
Page 47
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 44 5 5.1 Figure 11-12 In Maryland, an 18-unit, three-story condominium (right) was buili on a foundation of 168 pilings (left). The pilings allowed trees to be preserved within 1.5 m (3 ft) of the building. The pilings also permitted a gravel-retention system under the building to handle rain water; therefore, trees did not have to be removed for a rain collec- lion pond, Note the low lattice that screens the piling foundation (right). The wall con- struction was prefabricated so that no scaffolding’ was needed on the outside of the build- ing during construciion. The citing of and views from each unit were so enhanced by use of piers that, even (hough the developer increased the price of each unit $30.000, more units were sold the. first, year than was originully projected. (Photos courtesy of Steve Clark, Brentwood, TN.) Diagram 2- showing the use of pier foundations for construction close to trees. (Harris 1999, page 323) Site Slope Stability. The report by Morrison Geotechnic (dated 10" of February 2004) states a site slope of 31 degrees from the rear boundary to the front boundary. In the previous development Morrison states that the rear garage. wall was intended to support the dune slope, and that this removes the risk of a major slope failure. Morrison also notes that the slope where the residence is to be built (almost the same foot print as the present design by Kidd + Co Designers) could slump from 32 degrees to 30 degrees under dry conditions and loss of vegetation. Vegetation retention above the garage retaining constnuction is therefore required as part of the slope stability. Conclusions Tree No 57 This tree is the property of Noosa Shire Council, therefore any risk assessment of the damage caused by the sewer line construction is their responsibility. There is the major possibility that the trees’ structural integrity has been severely compromised by the loss of the tension roots during construction of the sewer line, therefore requiring removal and replacement due to the high target value present. Any further assessment of the impacts of the driveway construction therefore cannot be undertaken until council’s final-decision on the tree. , Leaf and Limb Horticultural Consultancy © Prepared by Samuel Cowie = - . . : 7" of May 2007
Page 48
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 ; 10 5.2 5.3 5.4 6.1 Garage Construction & Trees No 47, 48, 49 & 50. Currently tree No 47 is dead, therefore its interaction with the proposed — development is nil. Removal of the tree will be required prior to construction being undertaken, but due to slope stability issues retention of the stump and major woody roots will assist in erosion control. Planting of a replacement tree after construction is the best course of action. : Tree No 50 is in very poor condition, as the canopy has died, resulting in epicormic growth off the main trunk. Long-term retention of this tree is not viable. Removal (stump retention) and replacement with a suitable tree after construction is therefore the best course of action. Trees No 48 and 49 are is such close proximity to the excavation of the garage and lift construction that massive lateral root loss will result in either tree decline or death. As the garage/lift construction will support the slope after construction, the removal and replacement of these two trees is the best course of action. . Building Foundations Given the use of pile/screw pile foundation using the friction method instead of pads due to slope characteristics, installation of the foundations will have very little impact on tree root systems and the trees’ long-term retention on site. The retention of the trees above the garage construction (aside from Trees No 47, 48, 49 & 50) is required to assist in the stabilisation of the slope. It should be noted that several small trees or large shrubs currently occupy the foot print of the proposed development, if removed, their stumps and roots should be left on site for erosion control. The construction of the house along the top of the piles will help minimise disturbance to the soil surface, thus enabling minimum disturbance and retention of all trees after foundation construction. , The use of the tree management plan documented in the recommendations of this report will assist in maintaining the trees on the site during construction. Future Landscaping Additional planting of future replacement trees and vegetation is recommended for the long-term soil stability either above or below the proposed development. This should include the area underneath the building. Recommendations Tree Management Plan. Recommendation is made that the following Tree Management Plan (TMP) i is using prior, during and after construction to insure minimum impact on all trees and vegetation being retained. Leaf and Limb Horticultural Consultancy © : . ‘Prepared by Samuel Cowie. / .7" of May 2007
Page 49
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 , 11 Tree Management Plan Site address: 10 Park Road Noosa Heads Builder: / . - . - Business: - Mobile: Site Arborist: , - - Business: - Mobile: Tree contractor: - - Business: - Mobile: The following tree protection procedures are to be undertaken during the development of the site to insure the safe, healthy, and long-term retention of retained trees identified i in the site, building and landscape plans approved by Noosa Shire Council. _Al laminated copy of these tree protection procedures i is to be attached to any tree _ protection. fencing on the site, and a copy is to be retained on site by the building © contractor supervising the project. Pre Construction e Prior to construction works, a site arborist shall be contracted to supervise all tree protection procedures detailed in this document. The site arborist is _ required to have a minimum level 5 AQS qualification in Arboriculture, and a minimum 5 years experience in tree protection on building sites. Their details are to be filled in at the top of the document. “e Prior.to construction works, a tree contractor shall be contracted to conduct all pruning operations detailed in this document or instructed to by the site arborist. The tree contractor cannot be the site arborist due to perceived conflict of interest. The-tree contractor must have a minimum level 3 AQS: qualification in Arboriculture, and be able to follow AS4373-1996. Their details are to be filled in at the top of the document. e - Prior to construction works, the site arborist should consult with the construction company or builder to outline appropriate tree protection methods during construction, to convey the importance of tree protection, and open communication channels. e The builder or construction company is responsible for all tree protection procedures on the site as per this document, whenever the site arborist is not on site. It is the responsibility of the builder to advise the site arborist of when their presence is required on site or of any breaches of the tree protection — procedures. , Leaf and Limb Horticultural Consultancy ©. Prepared by Samuel Cowie Lo : . 7°” of May 2007
Page 50
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 12 ¢ All trees being retained on site should be appropriately marked by the site arborist. e Tree Protection Fencing (where used or designated) is to consist of 1800mm high chain mesh fencing or similar appropriate fencing approved by the site arborist. TPF is to be anchored by star pickets to prevent movement during construction. e The construction workers or subcontractors working on the site are to be * informed of tree protection importance by the builder. © The site arborist and the builder should agree upon and designate storage, dumping and wash areas that will not impact on the trees during construction. e Any pruning works required (such as deadwood removal or clearance ‘ pruning), including root pruning, shall be carried out by the tree contractor to ' Australian Standards AS 4373 -1996 ‘Pruning of Amenity Trees’. e The site arborist shall conduct any initial hazard assessment of the retained trees to identify any trees that present a Workplace Health and Safety risk to any workers on the site. Where possible, arboricultural hazard mitigation procedures should be undertaken by the tree contractor when and where appropriate eg. Deadwood removal., At no point should a tree be removed unless approved by Noosa Shire Council (site arborist to document reasons for removal and contact council to organise a site meeting). During Construction e The builder is to install jute matting (or appropriate measures as agreed upon with the site arborist) where foot or machinery access is required onto the site to construct the garage and driveway. These measures must minimise soil erosion and root damage to all trées in close proximity to the construction works. e The site arborist shall be present to supervise any excavation, trenching or tunnelling located on the site that may affect any tree roots, and shall keep a record of works to present to Council after completion of construction. : e Where possible the first 500mm of any: excavation should be dug by hand to identify any significant tree roots (25mm or greater in diameter). Grabbing and tearing of tree roots by machinery is prohibited, and the contractor responsible will become liable for any arboricultural work to rectify the damage. , ¢ No roots greater than 25mm shall be cut during construction without consent of the site arborist. All tree roots cut are to be identified and documented by the site arborist. Leaf and Limb Horticultural Consultancy ©“ Prepared by Samuel Cowie 7" of May 2007
Page 51
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 13
e At the completion of the garage, driveway and foundation installations, the
builder is to construct scaffolding (see diagram No 1) around the outside of
the building to keep workers and contractors off the natural site soils.
After the installation of scaffolding around the building, all traffic on the
original site soils should be kept to a minimum and restricted to pathways
protected with erosion control measures (eg. Jute matting).
e Where scaffolding is installed around tree trunks, or construction works
are in close proximity to tree trunks, the trunks are to be protected with
hession wrappings. These wrappings should be sufficient enough to stop .
impacts that may damage trunk tissues. All wrappings are to be secured
by ties, and at no point is nailing or any other invasive method to be used.
These are to be removed at the end of construction works.
Protective fencing lin ~
accordance with 8.2.2
or 8.2.3) (may be attached
to scaffolding)
ly Platform level at
{i _ first lift of brickwork
Protective fencing t Toeboard
(in accordance with te
8.2.2 or 8.2.3) a cq Ly
jj eo
woe ae Ld:
Ground undisturbed and ? 4
protected by geotextile ° 1 y
fabric, and side-but ting \ Protected 14
scaffold boards ‘ area H]
I! ik Timber sole A
plate r
————n = Lee tha,
} SH
Ss : | f
Not less than distance - Not less than distance
recommended in table! recommended in table 1
Ground undisturbed and
protected by geotextite
fabric,and side-butting
scaffold boards
(a) Initial stage : (b) Secondary stage with scaffolding
- Diagram No I- showing scaffolding methods to minimise soil and root disturbance.
e After installation of any floor or ground level, the site arborist is to identify
any low branches that will intrude directly on the approved building
structure. Any pruning required to remove low brariches that impede on
the building shall be documented-and then removed by the tree contractor,
as required and to AS4373-1996, _
« The area around the building shall not be used for the storage or dumping
of any building materials (particularly cement based products), unless
otherwise specifically designated by the site arborist and builder as above.
-Leaf and Limb Horticultural Consultancy © .
~ Prepared by Samucl Cowie . . 7" of May 2007
Page 52
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 14 Post Construction e A post construction assessment shall be undertaken by the site arborist to determine the health and vigour of all retained trees on the site. Any documentation that council may require will be submitted for review at this time. * The assessment shall include recommendations for any future pruning works or any corrective arboricultural action to be taken if required. ¢ The site arborist will liaise with the landscape architect and landscaper ° so as to minimise any disturbance to the retained trees on the site during landscaping. If at any point landscape works are identified that may cause damage to the trees, the site arborist is to work with the landscaper to eliminate detrimental impacts. Work or construction that is contrary to these. guidelines shall make the person . Tesponsible, liable for any damage to. any tree. If the work or construction contrary to these guidelines results in the loss of any tree, implementation of remedial arboricultural procedures, and/or required removal of any tree, the person responsible is liable for any cost incurred. for:these actions, in addition to any fines imposed by Noosa Shire Council. If this work or construction results in the loss of any tree, a tree valuation (Thyer’s Method based on the tree condition prior to construction) undertaken by the site arborist will determine the amount of compensation available to the owner of the property, on and above any other costs incurred by the person responsible. At no point are these guidelines finite, and at anytime the site arborist may designate ‘additional procedures or requirements to protect the trees on the site when required. These guidelines are certified and approved by: Name: . : Authority: Builder Signed: Date: Name: , Authority: Site Arborist , Signed: Date: - Leaf and Limb Horticultural Consultancy © . : Prepared by Samuel Cowie . : oo . 7” of May 2007
Page 53
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 . 15 If anyone has questions relating to this report, please contact me arid I will be happy to answer them. Yours Sincerel Samuel A R Cowie Diploma of Horticulture (Ryde), Diploma of Arboriculture (Ryde) Member A.LH., H.LA., LS.A., LA.C.A., & Q.A.A. Licensed Quantified Tree Risk Assessment user (No 787) Qualified and Practicing Arborist/Horticulturist. Since 1987 : © COPYRIGHT RESERVED: Leaf & Limb Horticultural Consultancy, 2007. / Disclaimer and Assumptions: ‘Care has been taken to obtain all information from reliable sources. All data has been verified as far as possible. However Leaf & Limb Horticultural Consultancy can neither guarantee nor be responsible for the accuracy of information provided by others. Unless stated otherwise: - eT eae ¢ = Information contained i in this report covers only the trees that were examined and reflects the condition of the trees at the time of inspection, and * — The inspection was limited to the visual examination of the subject trees without dissection, excavation, probing or coring, unless otherwise stated within this report. There.is no warranty or guarantee, expressed-or implied, that problems or deficiencies of the subject trees may not arise in the future. This report is to be provided in full to any person, local government or regulatory authority that has so requested a copy, and is associated with any trees or vegetation mentioned within this report, and has a legal right to request a copy. “Leaf & Limb Horticultural Consultancy reserves the right to forward a full copy of this report onto any local government or regulatory authority that requests it for making an assessment of the trees on the site. Leaf and Limb Horticultural Consultancy © : Prepared by Samuel Cowie : T* of May 2007
Page 54
1 Kidd + Co- 10 Park Road Noosa Heads QLD 4567 16 References; Allaby, Michael (1998). Oxford Dictionary of Plant Sciences (New Edition). Oxford University Press, Oxford. AS4373-1996 Pruning of Amenity Trees. Standards Australia. Bailey, Jill (1999). Penguin Dictionary of Plant Sciences (New Edition). Penguin Books, London. BS 5837:2005 Guide for Trees in relation to construction- Recommendations. British Standards. , Hanson, Peter (2000). Dictionary of Botany. Golden Books Centre SDN. BHD, Kuala Lumpur. Harris, R.W; Clark, J.R; & Matheny, N.P (1999 & 2004) Arboriculture; Integrated Management of Landscape Trees, Shrubs & Vines 3" Edition, Prentice Hall, New Jersey. Haslam, S. (2004) Noosa’s Native Plants. Noosa Integrated Catchment Assoc Inc. _ Tewantin QLD, Australia. Matheny, N.P. & Clark, J.R. (1998) Trees & Development: A Technical Guide to Preservation of Trees During Land Development. International Society of : Arboriculture, Savoy, Illinois. Perry, Thomas O (1982). The Ecology of Tree Roots and the practical significance thereof. Journal of Arboriculture, Volume 8, No 8, Page 197-211. The International Society of Arboriculture (1994) The Landscape Below Ground, proceedings of an International Workshop on Tree Root Development in Urban Soils. International Society. of Arboriculture, Illinois, USA. Leaf and Limb Horticultural Consultancy © Prepared by Samuel Cowie , oo 7" of May 2007
Page 55
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 17 Appendix A Tree Inventory Schedule Tree | Tree Genus DBH Age | Vitality Comments No & Species (mm) Range 2 Lophostemon | 330 EM MtoP Leaning trunk with bend confertus : 3 Endiandra 600 M MtoG Buttressing, Trunk tension side wound?, basal cavity? sieberi Further testing required 4 Lophostemon | * M M Dua! trunks, lateral rooting on low side. Confertus ‘$5 Ficus * M M Adventitious/stilt roots, tensile trunk growth, low watkinsiana lateral branch may impact roofline, Eucalyptus wrapped by trunk and roots on high side, large tree (* * unable to measure trunk by diameter tape). 16 ‘Lophostemon. | 390 M M confertus 17 Corymbia 160 Y MtoP Distorted and suppressed canopy caused by intermedia surrounding trees. 19°: | Eucalyptus | 300 ~-- | EM “-M- -- Leaning-trunk with compensating-growth..- . - 26 | Endiandra | 180 YtosM |M sieberi 35 Eucalyptus * P 38 Lophostemon } 430 EM MtoG confertus 39 Endiandra 470 M MtoG 1 main trunk and 2 small secondary trunks. sieberi : 40 Endiandra 300 EM MtoG . Main trunk topped/failed at approximately 8 metres, sieberi epicormic growth on trunk. 48 ? 320 SM MtoG Small axe wound on trunk; buttress rooting. 49 ? 310 M M Lean 50 Lophostemon | 365 EM MD Canopy dead, live epicormics on main trunk. confertus | 52 Corymbia 340 EM M Council Trée. intermedia Lean over road with compensating trunk development. 53 ? 215 SM M Compression rooting, adventitious root development, strong lateral root development. 54 ? 155 SM G Introduced native species, not endemic. Leaf and Limb Horticultural Consultancy © Prepared by Samuel Cowie 7" of May 2007
Page 56
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 18 58 ? 140 SM G 56 Dead Dead Dead. Dead Dead 57 Eucalyptus 520 EM M to P Council Tree, slight lean towards road, suspect root tereticornis damage on tension side (uphill) due to recent sewerage __| pipe installation. 58 Glochidion 390 M MtoG Council Tree. species ‘ 68 Acmena 215 & M MtoG Council Tree, dual trunk from ground level, tension on smithii . 230 east side due to tean (watch driveway construction). _ Notes on tree inventory schedule. Tree No: Tree Genus & Species: DBH: Vitality Age Range. Relates to number on the attached site diagram/plan. Botanical identification Diameter at Breast Height (1400mm from ground level- highest side) Y = Young, . In millimetres SM = Semi Mature, EM = Early Mature, M = Mature, ‘PM = Post Mature. A measure of physiological condition: D MD P M G ooo0o0$0 = Dead = Moribund = Poor = Moderate = Good Leaf and Limb Horticultural Consultancy © Prepared by Samuel Cowie Te of May 2007
Page 57
(é) L0L'aS
‘ON Byway
3S
gure,
ussoys $2
aS
Nv'ld aus
aL BuyteQ,
Ao “IBIDlel SMES
wap
Sd¥ 4H ¥SOON
avOu Nevd Ob
woes]
39 70H 33uL
etoky
fe w03 COppTT MwA
was coppABopy
oyusoe,
s*
Tepes
12 A ~
{u8A >
NOMAvd)
ee eqae
Se |
was-3q
NOMTTANG
7q3a
we
SE
7
£ y
2
~ SF
~~ ha
AB)
Hen
{2ug papop Aq pares pul)
dexypm pee
says sequin edeospus]
a
DOSE cosa
aURO'SZ 72038
UR0S2 1038
Web. ATLL NIC LM
Syaav wood
Page 58
<u rela well
‘SCALE1:100
ulfdlng foofpris! aver Qncturding decks)
'
,
,
.
:
‘
‘
designers
20 Duka Sheet
Sunshine Beach QUD 4567
PO Box 262
Noosa Hepds CLO 4567
‘Telephone OT $447 6833 ~
Farsimie UT S447 $833
hiic@:Wdcocom.ay
idden.com.au
Tisdraaigiatobe
reedineonuctionith
Engrens Dravi &
Reports,
Cossucton teconcly
whale SMB
‘BCA Codes Retencdard
dy Bye 1975.8
ceed
\eaj at Gerais on
sts pbb ccomencerent
of ery works. These:
easing eranottobe
waedlronky,
Project
BEACH HOUSE
‘Location
40 PARK ROAD
NOOSA HEADS
Chent
FIRST PICKED PTY
Drawing Tes
SUB FLOOR PLAN
Sea Dats
asshovn JAN 07
Pram By oo
SF 0703
Drevin 3,
SD.201
Used in these records
22441 DA - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.