Council archive · source document
22441 DA - Response to Information Request [As Published] · 132001.210331.2
Kidd + Co- 10 Park Road Noosa Heads QLD 4567 6 4.2 Recent excavations and investigation confirms the distribution of major woody roots and rope roots out of the main taproot as seen in Photo No 1. The majority of roots found were in the top 500mm of soil level, most likely due to the availability of nutrients in the hummus layers on the surface. This is consistent with Perry’s descriptions of root growth (Perry 1994, page 4), where he describes the rope roots as transport roots that support the feeder roots that grow upwards into the A horizon soil (hummus layer on the site). Tree protection methods Tree protection involves the minimising of damage to the trees root and vascular system during construction, thus reducing the chance of tree health decline or death, and the possible damage to the structural stability of the tree from root damage. This can be achieved by protecting the both the trunk and lateral root system from direct damage, thus stopping loss of future structural support (trunk damage) or loss of ability to support active tree growth (root damage). Protection of the root system can be achieved by minimising disturbance to the surrounding soils, such as compaction or excavation, and protecting destruction of structural-roots greater than 25 mm in diameter. Soil compaction should be minimised through the use of scaffolding, otherwise suffocation of the feeding roots may lead to a decline in tree health. Protection of the roots then allows the tree to continue supporting the above ground sections. Under BS5837: 2005 protection distances are specified for the protection of a trees root system-from soi! level changes such as excavation (example Garage construction on 10 Park Road). Using the required tree protection zones ~ specified in BS5837: 2005, trees No 48 and 49 are unretainable due to the damage (root system) caused by the excavation of the garage/lift construction. In situations where foundations are to be installed over the tree protection zone, protection of the root zone by using scaffolding (to stop compaction or disturbance of the soil) over the root system that will be nearest the construction zone, and the spreading of composed mulch (to a depth of 75 to100mm) and filter fabric to absorb spills is recommended. In the case of steep sandy sites, the use of jute matting that is pegged down at regular intervals will also stop erosion due to foot traffic from trades people working ’ on the site. Protection of the trunk can be achieved by strapping hession around the trunk, followed by timber slats (50 by 50mm) held upright by further hession wrapping. ‘Appropriate signage indicating the importance of the tree - protection measures and the people to contact if access is required should be attached to the tree protection fencing. (TPF). Leaf and Limb Horticultural Consultancy © . Prepared by Samuel Cowie sors : 7” of May 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
22441 DA - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.