Sunshine Coast Checklist - Applications Involving Land
egional COUNCI .
9 Development & Land Use Sections
IDAS APPLICATION,
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
4. APPLICATION FORMS
1.1 Form1PartA
1.1.1. Ensure that the form is fully completed and is a current version.
1.1.2 Inthe case of an MCU or Op Works below the high-water mark, owner's consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No, Company name clearly indicated by
signatory) or Company Seal required.
4.2. Form4 Part B-R Supporting Information
4.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-R are attached.
1.1.2.1. Ensure that each of Forms B-R which are attached are fully completed.
eo IDAS ASSESSMENT CHECKLIST » :
2.1. Ensure that relevant sections have been checked and/or completed with regard to referrals
2.2 Ensure correct parts of Form 1 are provided where required (ie most common are Part J for
Clearing Vegetation, Part N for Contaminated land and Part P for Prescribed Tidal Works)
3.. ENVIRONMENTALLY RELEVANT ACTIVITIES .
3.1. nsure that Part G is completed if EPA referral is required. [|
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application. (Refer Environmental Health for fees) [|
- <
«4, FORM 2 - REQUEST TO CHANGE APPROVAL 4
4.1. Ensure that relevant items have been checked and/or completed including information regarding
applicant details along with owners consent if not current owner of land as shown on Council records. [|
If over multiple properties on one or more sites, consent of Body Corporate is required.
5, PLANS : , .
@ 5.1. Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational [|
Works) accompany the application. In addition ensure that each set is complete.
5.2 Ensure that 4 of the copies of the Pian of Development is in an A3 or A4 format and is [|
unbound.
6. . SUPPORTING INFORMATION 4
6.1 Ensure that generally at least 6 copies of any report accompanies the application (5 for Reconfiguration [|
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction. [
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping [|
7. FEE , ce
7.1. Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid. [
e Land Use MCU applications; MCU applications including a Lot reconfiguration, Prescribed Tidal Works; Operational
- Work if Jetty or if including Landscaping.
* Land Development Lot Reconfiguration applications and Operational Work not including Landscaping
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
NSC g:Manduse\administrative processes\application checklist.doc .See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of sections 2 to 58 (of 69)
Section 2
MIDDAP DITCHFIELD
11% December 2008
The Sunshine Coast Regional Council
Tewantin Office
PO Box 141
TEWANTIN. Q_ 4565 SELES
A ,
Attn: Glen Conserti fy,
7 PSCEVED
PROJECT: |§ PROPOSED DUPLEX “1 44 pee 2008 |
34 ELANDA STREET en oo i
SUNSHINE BEACH STA S109 - Tewantin éo/
@ ‘ct. front Counter
SUBJECT: | MATERIAL CHANGE OF USE TO DUPLEX 6 reyv
Dear Glen
Please find enclosed :-
a. DAS Assessment Checklist
b. PartA Common Details
c. PartD Material change of use assessable against a planning scheme.
d. Development Assessment Report
e. Architectural Drawings 0812 - CD0.00 Pi - 0812 - CD 4.01 P2
f. Survey drawing
g. Cheque for $2950.00 being the appropriate fee.
If you require any further information please do not hesitate to give me a call.
e Yours faithfully
MIDDAP DITCHFIELD
ARCHITECTS
A |
gir Wb OEY ens (OF Geb ston GUT. PHVECE. GOD. OH
Mec e SIG NG mad at cuca mea U Middan & Ditchiield Diy LidEABN#49 064 466-706)Section 3
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Orme ®evelopmenttApplication idas}
OTE: Answer all questions unless directed to go to a particular question. Refer to the end of the form for advice on how to complete this form.
TR ta me Re ce ae | re
Applicant details (The Applicant is the person responsible for making the application and need not be the owner of the land. The Applicant is responsible for ensuring the ©
\informetion provided on the IDAS Application Form is correct. This information is refied upon by the Assessment Manager and any referral agencies when assessing and i
‘deciding this appiication. By lodging this application, the Applicant incurs the obligations and responsibilities prescribed by the IPA. Any development permit or prefiminary
‘approval thet may be issued as @ consequence of this application wid be issued to the Applicant.) 7
Company/organisation name (if applicable) [Middap Ditchfield Pty Ltd
Individual applicant/Contact person (if there is more than one applicant, provide additional applicant details on an attachment to this form)
@ Title {at First name [Peter Last name {hiddap
Postal address (car Mary & Thomas Streets, Noosaville Q 4566
Contact telephone number {0754740877 Mobile phone number |
Facsimile number [0754740906 e4mail address [[email protected]
Details of the premises (ie, the land on which the development is proposed -refer fo the advice at the endofthe fom) ===
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
Table A If the apptication is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.
PF Name of each local goverment area in which the mobile and temporary ERA is proposed to operate
a)
OR
Table B Street address for the premises (tick applicable box/es below and insert property description in the table. Identify each lot in a separate row.)
e (i) Street address / lot on plan for the premises (Appropriate for most applications including building applications); OF
(ii) [] Street address Aot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g. jetty,
pontoon etc) (Note: Loton plan details may be obtained from tite documents, a ‘Rate’ notice, or from the local government.)
tad |Soeat Stree! Address Lotion Sareea Local government area (e.g. Logan,
0
AND/ OR
Table C Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a fot, in water (e.g. channel dredging in Moreton
Bay) etc.)
Coordinates
(Note: place each set of coordinates in @ separate row) Zone Local government area
Reference Datum (if applicable)
| 1 | f— DGDAgA
J wess4
|" Other -
2. Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable)Section 4
. t
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal)
Name of water body, watercourse or aquifer (if known)
EO
Table E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994
Lot on plan description for strategic port land Port Authority for the tot
Table F Complete if the premises are in tidal water
Name of local government for the tidal area {if applicable) Name of port authority for the tidal area (if applicable)
Be
3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water)
Total area of premises
[x] m? [_] hectares (Tick applicable unit}
Existing useofthe premises
4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)
5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc)?
No C] Yes - Ensure the type, tocation and dimensions of each easement are included in plans, submitted with the application
‘Proposal detain
6. Brief description of the proposal (e.g. 6 unit apartment buitding, 30 fot residential subdivision, a bore, aquaculture)
Duplex and Pools
7. Does the poposal include new buildings or operational work (including any services) on the premises?
CJ No Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application
Resource entitlement (ifeppicable) - further information is provided in the advice section at the end of the form |
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold}, declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
No - Goto Q9 [_] Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
O allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section.
(Owner's consent (tf appicable) - futher infomation is provided in the advice section atthe endofthe fem
9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment to this form if applicable.
Premises Owner's name/s Details of the premises owned . * Date consent
Table H and postal address (street address or fot on plan description) Owners signature was obtained
Terry Lyn Ross 34 Elanda Street, Sunshine Beach Pf
a Peter Mark Conyers 34 Elanda Street, Sunshine Beach pf
A Kym Andrew O'Brien 34 Elanda Street, Sunshine Beach pf
“ Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, 127 of the Corporations Act 2001 (Cwealth) detaits how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website .Section 5
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
rr SL —— a ee
‘Attachments and supporting information (Complete Table - Use @ separate row for each type of attachment or information, including information required i
‘under this Pari} Please ensure all documentation submitted with this form, induding other Parts of Form 1, or owner's consent, etc, are securely attached fo this Part of the Form.
ye ee. ee wa ee = cmon _— = —_— _ 2
Description of attachment or information Title (if appficable) Method of delivery to
Table! fag. Pi a c a rom owner’ arm craigs, a _ (o.g. General Authority, Jemes StretTraffic Report) assessment manager
Portable Long Service Leave (PLSL) levy (Applicable or corain buling and constuction work valued over $80,0000n) =
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: ( Tick box if appficable)
[_] the application seeks a preliminary approvat only;
{_} the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests);
{_} all costs, that relate to the work both directly and indirectly, are tess than $80,000, inclusive of GST; or
[_] the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given.
11. Is payment of a PLSL levy appticable to this application? (Refer to Q10 and the Advice below for more information}?
[_] No - End of Part A
Yes - Answer Q12 below
12. Has the PLSL levy been paid?
No - (NOTE: An apptication can be lodged prior to payment of the applicable PLSL levy. However, the levy must be paid and the receipted form sighted by
the Assessment Manager before a development permit may be given for this application. To pay the levy you will need to complete and submit a
Notification and Payment Form to QLeave.)
EJ Yes - Complete Table J and submit, with the application, the ‘yellow’ (Local Govemment's (Council) / Private Certifier's) copy of the receipted QL eave Form
OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)
. Receiving officer's Reference
Fee ($)| 29 So | Date received Nie of < ZI ro
l name P Aweo—e | numbers | C [2063
[ / NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER 4
To: [fet | have been engaged as the private certifier for the building work referred to in this application.
Date of ees os eo
econ
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
a . . . form sighted by | Name of officer who sighted the
Description of the work QLeave Project Number |Amount paid ($); Date paid assessment form
manager
fp
Privacy Statement
The information collected on Form 1 will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of Information Act 1992) or as
required by Parliament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.
Advice for completing Part ASection 6
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
General advice
° Part A of IDAS Development Application Form 1 must be completed and accompany ail development applications. The applicant is responsible
for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The
Assessment Manger may refuse to receive an application that is not properly made.
* The iDAS Assessment Checklist must also be completed for al! development applications, other than those requiring assessment against the
Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only.
Applicant details
° If the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided
under the IPA.
Details of the premises
° The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other
structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.
. Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete
Table A,
° The premises may be identified in a number of ways --
e Street address and lot on plan are most common and will apply to most applications.
« Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application, Eastings and northings using GDA94 datum is preferred, but longitude and !atitude and other
(specified) datum such as Zone Reference or GS84 may be provided,
. The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act.
° StrategicPortLandis within a local government area but a local government's planning scheme does not apply onStrategicPortLand.
StrategicPortLandis declared under the Transport Infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on
oO strategic port !and) and the Queensland Transport (Ports) website.
° ‘Tidal water’ is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic
port land is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water
mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless
provided for under the Loca! Government Act 1993. Unless otherwise provided for by legislation, a local government has no jurisdiction below
high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection
Agency generally has jurisdiction for a local goverment tidal area. However, the IPA gives local governments jurisdiction for assessing and
deciding applications for prescribed tidal works within the local government tidal area, and the planning scheme may be applied to that
assessment (to the extent provided for in the code for prescribed tidal work).
Resource entitlement
. Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a
prescribed State resource. Schedule 10 of the integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-
owned land, where evidence is required to be given, and the evidence required to support the application, Link to Integrated Planning
Regulation. Section 3.2.1(10)}(a)(ii) states an application cannot be taken to be property made without the required evidence.
° For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same
time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made.
e For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by
gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
° Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection
Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
O above high water mark,
Owner's consent
° Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the
application involves: a material change of use; reconfiguration of a lot, work on land below high-water mark and not within a canal as defined
under the Coasta/ Protection and Management Act 1995, or work on rail corridor land defined under the Transport Infrastructure Act 1994.
° Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during
the processes of the application or in the event of an appeal about the outcome of the application,
° “Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to
receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).
e Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation
may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises.
° Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary
ERA.Section 7
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Portable Long Service Leave (PLSL) Levy
. The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building
and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the
scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueensland.
° The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry
{Portable Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the
Building and Construction IndustryTrainingLevy.
. The Building and Construction Industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction work subject to
the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties,
pipelines, fences or earthworks, and works for subdividing, imigating or draining land.
° The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid befare a development permit may
be issued,
e The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and
Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can
be completed on the QLeave website at www.gleave.qid.gov.au. For further information contact QLeave (Tel: 1800 803 481 Web:
www .gleave.qid.gov.au }Section 8
lov 08 04:08 PETER 408220009 ween
‘41 2008 10:47 FAL
18h November 2008 0812/L0001
Chief Executive Officer
Noosa Council
PO Box 147
TEWANTIN Q 4565
Dear Sir/Madam,
PROJECT: PROPOSED DUPLEX
@ 34 ELANDA STREET
SUNSHINE BEACH
SUBJECT: CLIENT AUTHORISATION
|, Peter Mark Conyers & Nancy Jane Conyers and Kym Andrew O'Brien & Temy Lyn Ross, authorize Middap -
Ditchfield Architects lo make any necesyary jodgments and applications on our behalf in reference to the
above property.
_ Yours faithfully
Y ‘
Nancy Jene Conyers. if BYE Dated teat 21/8 e :
Ox: Andrew O'Brien ... hi Mild. $d)
Terty Lyn Ross... Sorc SSAT ro Sr cen ees cct eerste cen aeeee pated. 270 [ORSection 9
é ry
INTEGRATED PLANNING ACT 1997 Part D, Version 3.1, 3 March 2008
Rom 1 Develoment Ayasiection hes.
Yr n
PartD — fh wszve0.
et 44 nec 2008
Material change of use assessable against a\ = Sian = vewantio
. aaa, Sie 3 * “
planning scheme Q).”” pron Counter
Planning scheme identification LoretY ]
1. How is the premises identified / zoned in the applicable planning scheme? (NOTE: if the premises involves muttiple zones Clearly identity the
refevant zone for each fot) - provide details for each fot on a separate row
Lot description Applicable zone /precinct /area Applicable overlays
(ie. street address or fot on plan details) PP P PP enay
Hh Lot 160 on RP 48112 Semi-attached housing pl
‘Nature of the proposed material change of use (MCU) |
6 2. How is the proposed use/s defined in the applicable planning scheme?
. Planning scheme definition (include each | No. of dwelling/ | Days & hours of} — No. of
General pale otihe pe ' osed use definition in a new row or on attached tenancy units operation employees
u documentation if applicable) (if applicable) (if applicable) _| (if applicable)
fT petenancowe fT
3. What type of approval is being sought?
Development Permit [| Preliminary Approval [__] Both (Provide details below)
4. Are there any current approvals associated with this application for the change of use of the premises? (e.g. a Preliminary Approval for
the use)
No [_] Yes - Provide details for each associated approval on a separate row
5.” Does the proposed use involve:
{i) the reuse of existing buildings on the premises No [_] Yes - Complete Table A
(ii) new building work on the premises [_] No Yes - Complete Table 8
(iii} the reuse of other existing operational works on the premises No [| Yes - Complete Table C
(iv) new operational work on the premises [] No Yes - Complete Table D
Table B | Proposed floor area |cra: 244.5 (allowed 244.8)
Proposed site cover (204.6 (allowed 217.6) |
Proposed maximum height above natural ground level [<8 metres ;
Table 0 =| Proposed number of on-site car parking bays F
Proposed area of landscaping [58.2 (159 soft landscaping)
Perostnanin sa ans raperet wareneananiny |
Proposed building of a retaining wall (tick applicable box and refer to Advice) (_] No YesSection 10
i oe
INTEGRATED PLANNING ACT 1997 Part O, Version 3.1, 3 March 2008
Mandatory Information
6. Confirm that the following mandatory information accompanies this application:
Confirmation of
sc
For ail applications
(i) Plans showing the nature and location of the proposed use on the premises and a statement about the
intensity and scale of the proposed use (e.g. number of employees, days and hours of operation, number of visitors, Confirmed over the counter
number of seats, capacity of storege area)
When the application involves reuse of existing buildings
(ii) Plans showing the size and location of the buildings to be reused Confirmed
- over the counter
[_} Not applicable
When the application involves new bullding work
{iii) Plans showing the size and location of the proposed new building work Confirmed
- over the counter
[{_] Not applicable
When the application involves reuse of other existing works
{iv) Plans showing the nature and location of the works to be reused Confirmed
over the counter
[-] Not applicable
O When the application involves new operational work _ _ ~~ - - “-
(v) Plans showing the nature and location of the proposed new operational works Confirmed
over the counter
[_] _ Not applicable
OFFICE USE ONLY
Advice for completing Part D
General advice
. Part A must also be completed for all [DAS development applications.
° The applicant is responsible for answering ali questions fully and correctly, unless following a response there is a statement to go directly to
another question.
* When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) for coastal development applications, use the
process from the information sheet Efectronically paying fees to the Environmental Protection Agency (EPA) and securely attach the form
Electronic Funds Transfer (EFT) payment notification to this application.
Q3 A development permit authorises development to occur. A pretiminary approval is a step in the approval process and does not authorise
O development to occur - a subsequent application for a development permit must be sought.
Table D If the MCU application involves operational work that is the building of a retaining wall on the premises, the application is taken also to be for the
operational work if approval for the operational work has not been applied for in this application or in a separate application.Section 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
Form BevelopmenteApplication ES
IDAS IN \
&7 non eveD
Assessment Checklist»...
Z “4 cae ig wantin
G.\_egarceunier
IDAS Development Application Form 1 is the approved form for all development applications under iri sere
1997 1PA). Form 1 is made up of various Parts. ["e\
Part A (Common details) of Form 1 must be compieted for all applications. The relevance of other Parts of Form 1 depends on
the nature of the application.
Form 1 also includes this IDAS Assessment Checklist, which is used to assist in determining State assessment and referral
requirements, and the Parts of Form 4 relevant to the application.
@ Section 1 and all other relevant sections of the IDAS Assessment Checklist, as identified in the Table below, must be .
completed for all development applications except those proposed on land in an urban development area, or for building work
requiring assessment against the Building Act 1975 only.
For more information about development applications on land in an urban development area, refer to www.ulda.qid,gov.au.
For more advice about building applications refer to Part B of the IDAS Application Form.
Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. If
unsure, phone or visit your local government or log onto the DIP website www.dip.ald.gov.au for help
For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this
checklist
Does the application seek approval to materially change use of the premises? Ga Yes
ifyes - complete Section 2 of this checiiist
Does the application seek approval to reconfigure a lot? Ces |[&)No
ifyes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. Assessment is by the local government.
Does the application seek approval to carry out operational work?
If yes - complete Section 4 of this checklist LlYes }[x]No
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? Ces |pNo
@ If yes - complete Section § of this checklist
Have you received a referral agency response under section 3.3.2.0f the IPA, in relation to this development application?
ifyes - complete Section 6 of this checklist. L} Yes |[x]No
Does the application seek approval to carry out building work requiring assessment against a local government planning
scheme? L1Yes |[x]No
if yes - complete Part E of IDAS Application Form 1. Assessment is by the local government.
Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yes - go to Appendix 1 of this checklist for advice on building referrals, Complete Part B of IDAS Application Form 1. LJ Yes |[xtNo
Assessment is by a building certifier
i ECTION 1 Section t must be completed for ail applications that require completion of the IDAS Assessment Checklist.
HERITAGE . See me cet __]
ee
1.1A Is any part of the proposal intended to be carried out on a Queensland Heritage place under the Queensland Heritage Act 1992?
No-Goto1.18 [_} Yes
IPA, schedule 8, part 1, table 5, iter 2: IP Regulation, schedule 2, table 1, item 11, fable 2, iter 18; IPA, section 1.3.5 (Definitions for terms used in development).Section 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
1.1B Does the proposal involve development, other than development mentioned in the Integrated Planning Act 1997 Schedule 9
(development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered in
a Local Heritage Register under Part 11 of the Queensiand Heritage Act 1992?
No - Goto Q1.2 L] Yes - (Complete Form 1, Part C,) This appkcation requires assessment by the relevant focal goverment against the [DAS
Code in the Queensiand Heritage Regulation 2003. if the development involves building work and the focal
govemment is not the Assessment Manager for the application, the local govemment has jurisdiction as Concurrence
Agency.
IPA, schedule 8, part 7, table 5, item 2A, schedule 9, lables 1,2 3. 4& 5: IP Regutation. schedule 2, table 1. item 11A: IPA, section 1.3.5 (Definitions for terms used in development).
Queensland Heritage Reqguiation 2003, schedule 2 (DAS Code)
REMOVING QUARRY MATERIAL; WILD RIVER AREA
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
No-Gotoai3 [_] Yes
IPA, schedule 8, part 1, table 5, item 1; IP Regulation, schedule 2, table 2, item 11; IP Regulation, schedule 1, table 5, item 2 (wild river area); Water Act 2000,
section 966C; Wild Rivers Act 2005, section 43A
en ll
ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petrofeum activity?
No-Gotoar4 [7] Yes
© IPA, schedule 8, part 1, table 2, item 1: IPA, schedule 8, part 1, table 5, items 3 and 4: IP Regulation, schedule 2, table 2, tems 1 and 23: Environmental Protection Act i994, section
73AA (wild river area); Wild Rivers Act 2005, section 43A: relevant wild river declaration: Wild Rivers Code.
WITHIN THE LIMITS OF A PORT a oY
1.4 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
No - Goto 01.5
[_] Yes
IP Regulation, schedule 2, table 2, items 15 and 16
‘DECLARED FISH HABITAT AREA _ . .
1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
No - Goto Q1.6
{_] Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation, schedule 2, table 2, item 26
@ (COMMUNITY INFRASTRUCTURE | BO |
1.6 ls any part of the premises designated for community infrastructure?
No - Goto Q1.7
_] Yes
IP Regulation, schedule 2, table 3, tem 7
pee ee as wae wee ee marine 8
.\WASTE WATER MANAGEMENT |
1.7 Does the proposal involve the establishment or expansion of a waste water disposal system?
No -End of Section [_] Yes
IP Regulation, schedule 2, table 3, item 5
ECTIO N 2 - Section 2 must be completed when the application seeks approval to materially change th f premises.
PLANNING SCHEME OO oe Oo
2.1 Is the proposed use assessable under the planning scheme?
{-] No - Goto Q2.2 Yes - Complete Form 1, Part D and answer Q2.1.1 - 2.1.13 below
if yes, does the application request that the proposal be assessed against a superseded planning scheme?
No —_[_] Yes- (Complete Form 1 Attachment 1)Section 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
‘STATE-CONTROLLEDROAD - Be
2.1.1. Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
[_] Yes No
If no, is the proposed use listed in schedule 5 of the Integrated Planning Regulation 1998 and does it exceed the specified
threshold?
No [_] Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
IP Regulation, schedule 2, table 3, tems t(a) and 3
ACID SULFATE SOILS nn ]
2.1.2 Is the use proposed in a local government area listed? ' in State Planning Policy 2/02: Planning and Managing Development
Involving Acid Sulfate Soils?
[_] No - Goto 2.1.3 Yes
2 aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Coolocta, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
If yes, is the natural ground level of any part of the premises less than 20m AHD?
No [_] Yes
@ IP Regulation, schedule 2, table 3, item 4; State Planning Policy 2/02: Planning and Managing Development Involving Acid Suffate Soils, section 3.6
COASTAL MANAGEMENT DISTRICT —
2.1.3 Does the proposed use involve the following?
(i) Carrying out operational work, completely or partly in a coastal management district [x} No (J Yes
(ii) Carrying out building work, completely or partly in a coastal management district, thatis the [x) No (Yes
construction of new premises with a gross floor area (GFA) of at least 1,000m?
(iii) Carrying out building work, completely or partly in a coastal management district, thatis the <q No (Yes
enlargement of the GFA of existing premises by more than 1,000m?
If yes to any one of (i) - (iii) above - This application must be referred to the Environmental Protection Agency (EPA) as Concurrence Agency.
IP Regulation, schedule 2, table 3, tem 6
i
VEGETATION CLEARING
2.1.4 Do the premises include a lot containing the following?
{i} Acategory 1, 2 or 3 area shown on a Property Map of Assessable Vegetation (PMAV) {x] No _] Yes
(ii) If there is no PMAV for a fot, remnant vegetation [x] No (] Yes
© IP Regulation, schedule 2, table 3, item 11
‘CONTAMINATED LAND -UNEXPLODEDORDNANCE a |
2.1.5 Is any part of the premises in an area for which an area management advice has been given for unexploded ordnance?
No - Go to Q2.1.6 [] Yes - (Complete Form 1, Part N) This application must be referred to the Administering Authority as Concurrence
Agency.
IP Regulation, schedule 2, table 3, item 12 7 _
PUBLIC PASSENGER TRANSPORT |
2.1.6 1s the proposed use of premises listed in schedule 13C of the infegrated Planning Regulation 1998 and does it exceed the
specified threshold?
No - Go to Q2.1.7 C) Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, tem 14
—_————— et. cue mea eee venete nee ae
RAILWAY SAFETY AND EFFICIENCY 7 ee 7 . |
2.1.7 Is the proposed use of premises listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
No - Goto Q2.1.8 [__] Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 15Section 14
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
KOALA CONSERVATION
2.1.8 Is any part of the premises in a koala conservation area or koala sustainability area?
No - Gotoa21.9 [_] Yes
IP Reguiaton, schedule 2. table 3, tem 18
EASEMENTS AND SUBSTATIONS
2.1.9 4s the use associated with reconfiguring a !ot?
[_] Yes - Goto Q2.1.10 No - Answer both (a) and (b) below
(a) Will any part of any structure or work that is the natural and ordinary consequence of the use, be located in an
easement?
No-Goto(b) [_] Yes - Answer both (i) and {ii) below
{b) ts any part of the premises situated within 100m of a substation site under the Electricity Act 1994?
No { | Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
{P Regulation. schedule 2, table 3. item 8 (electricity easement); IP Regulation. schedule 2, table 3, item 16 (pipeline easement). IP Regulation, schedule 2, table 3,
item 9 (substation)
RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER AREA .
© 2.1.10 Is any part of the premises in a wild river area dectared under the Wild Rivers Act 2005?
No -Gotoa2.1.11 (_] Yes
IP Regulation, schedule 1, part 2, table 5, item 1(a); Wild Rivers code (Note: the code does not currently contain applicable provisions for residential, industrial or
commercial development inside a designated urban area)
WETLAND . | |
2.1.11 Is the proposal only for the construction or use of a single residence on a lot and any reasonably associated building or structure?
[_] Yes - Goto Q2.1.12 No
If no, do the premises include a lot situated in, or within 100m of, a wetland shown on the ‘Map of referable wetlands’?
[X] No Cl Yes - This application must be referred to the Environmental Protection Agency (EPA) as Advice Agency.
IP Reguiation, schedule 2, table 3, item 20
‘HERITAGE
2.1.12 Do the premises include a lot sharing a common boundary with a Queensland Heritage place under the Queensi/and Heritage Act
1992?
No - Goto Q2.1.13 [7] Yes - This application must be referred to the Environmental Protection Agency (EPA) as Advice Agency.
” IP Regulation, schedule 2, table 3, item 22
CERTAIN PRELIMINARY APPROVALS
2.1.13 Is preliminary approval sought for the application under the IPA, section 3.1.6?
No - Go to Q2.2 [_] Yes - (Complete Form 4, Attachment 2) This application must be referred to the Department of Infrastructure
and Planning (DIP) as Advice Agency.
IP Regulation, schedule 2, table 3, item 23
BROTHEL sits . |
2.2 Is the proposed use a brothel as defined under the Prostitution Act 1999?
No -Gotcaq23 [-] Yes
IPA, schedule 8 part 1, table 2. item 2; Prostitution Act 1999, section 64
STRATEGIC PORT LAND .
23 Is any part of the use proposed on Strategic Port Land under the Transport Infrastructure Act 1994?
No-Gotoq24 [_] Yes
IPA, schedule 8, part 7, table 2, item 3; {P Regulation, schedule 2, table 2, tem 6Section 15
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkiist, Version 21.3, 9 May 2008
MAJORHAZARDFACIUTY | . a
2.4 Is the proposed use a major hazard facility or possible major hazard facility under the Dangerous Goods Safety Management Act
2001?
No -Gotoa25 [_] Yes - (Complete Form 1, Part L) This application requires assessment by the Department of Emergency Services
(DES). If DES is not the Assessment Manager for the application, the egency has jurisdiction as Concurrence
Agency.
IPA, schedule 8 part 1, table 2, item 4; IP Regulation. schedule 2. table 2. item 7
poe ee - eo .
CONTAMINATED LAND - REGISTERED LAND _
25 Is any part of the tand forming the premises on the Environmental Management Register or Contaminated Land Register under the
Environmental Protection Act 1994?
No -Gotoaz6 [_] Yes
IPA, schedule 8, part 1, fable 2, item 5; iP Regulation, schedule 2, table 2, item 22
i _. .
CONTAMINATED LAND-NOTIFIABLE ACTIVITY d
2.6 Is any part of the fand forming the premises currently used for a notifiable activity, or if there is no existing use was it last used for
a notifiable activity?
No -Gotoa27 [_] Yes
IPA, schedule 8, part 1, table 2, item 6; IP Regulation, schedule 2, table 2, item 22
® (CONTAMINATED LAND INDUSTRIAL ACTIVITY,
27 Is any part of the premises currently used for an industrial activity (other than for a mining activity or petroleum activity), or if there
is no existing use was it last used for an industrial activity (other than for a mining activity or petroleum activity)?
No -Gotoaz8 [] Yes
IPA, schedule 8, part 1, table 2, item 6; iP Regulation, schedule 2, table 2, item 22
‘CONTAMINATED LAND - AREA MANAGEMENT ADVICE (NATURAL MINERALISATION OR INDUSTRIAL ACTIVITY) |
28 Is any part of the premises in an area for which an area management advice has been given for natural mineralisation or industrial
activity (ofher than for a mining activity or petroleum activity)?
No - Goto Q2.9
[_] Yes
IPA, schedule 8, part 1, table 2, item 7; iP Regulation, schedule 2, table 2, item 22
AQUACULTURE; WILD RIVER AREA
a
2.9 Is the proposed use for aquaculture as defined under the Fisheries Act 19947
No -Gotoaz10 [_] Yes
© IPA, schedule 8, part 1, table 2, item 8; IPA, schedule 8, part 2. table 2, item 1 (self-assessable aquaculture}; IP Regulation, schedule 2, table 2, item 27
Fisheries Act 1994, section 76DA (wild river area); Wild Rivers Act 2005, section 43A .
‘AGRICULTURAL AND ANIMAL HUSBANDRY ACTIVITIES IN A WILD RIVER AREA ~ 4
2.10 Is any part of the premises in a wild river area declared under the Wild Rivers Act 2005?
No -Gotoa211 [_] Yes
IPA, schedule 8, part 1, table 2, item 11; IP Regulation, schedule 2, table 2, item 36 ; Wild Rivers Act 2005, sections 42, 43A
SEQREGIONALPLAN ee
2.11A Is any part of the premises within the South East Queensland (SEQ) Regional Plan area?
No -Gotoaz118 (_] Yes
SEQ Regional Plan 2005-2026, Amendment 1, Regulatory Provisions, division 2; IP Regulation, schedule 2, table 3, item 13, IPA, section 2.54.12 (3)
‘STATE PLANNING REGULATORY PROVISIONS (REGIONAL PLANS)” _ . :
2.11B Is any part of the premises within a designated region under Schedule 1 of the draft regulatory provisions?
No -GoteQ2.12 [_] Yes
22 State Planning Regulatory Provisions (Regional Plans) are the draft regulatory provisions
State Planning Reguistory Provisions (Regional Plans), division 2: IP Regulation, schedule 2, table 3, item 13:1P Regulation, schedule 3A,Section 16
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
‘CONSERVATION ESTATE |
2.12 \s the proposal for urban purposes, as defined under the IPA?
No -Gotoa2.13 [_] Yes
IP Regulation, schedule 2, table 2, item 40
EE LL,
REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT |
2.13 Does the proposed use involve the removal, destruction or damage of marine plants under the Fisheries Act 1994?
No -End ofSection2 [_] Yes
IPA, section 3.2.2A: IPA, schedule 8, pert 1, table 4, item 8 (assessable development}; IPA, schedule 8, part 2. table 4, item 4 (self-assessable development): Fisheries Regulation 1995
8113A (self-essessable codes}:IP Regtéation, schedule 2, table 2, item 29 !P Regulation, schedule 1, part 3, lable 4, item 8; Fisheries Act 1994, section 76DB (wikd river area): Wild
Rivers Act 2005, section 43A.
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.
To the fult extent permitted by law DIP expressly disclaims ail liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss {including direct and indirect losses), damage or other consequence which may arise from your
@ reliance on this process and the information contained on this form.Section 17
. ro
a
‘
MCU Application 11/12/2008
oy ROOT ED >\
No
~-
. ee he h
2 908
and 4 4 NEG 2 ,
=
4
“\ envy. yawanln
- wo -
62\. reort Guenter
> : aon
@ fo wv
Co aS a a A
por en eee er . ¢ ¥ " . - fe ew eee
cece". DEVELOPMENT ASSESSMENT:REPORT... >.
be ee eee jo ae Pov ee te eel
et ee ee a ee eR EA REO EEA ee eee tt ee BOE ERs Oe
pee ee UB ee eT at ee Re oe ee RO RE EL OEE Gee
ote < hoe te NM tete OM OE EL ER <
pisces ot ae MATERIAL CHANGE OF USE TO DUPLEX ccs ean,
ee ee ae BO BORE ARN ED EEE ER LEE EE LE LP EEA EEE OO OE EEE
ENO Cr ee SIAR ae Behe BO EEE EP EEE EE ES SA LETS fae:
Le Oe pe PEL BSE EP EEE PERIGEE INES ADEE EE PA EE AEE LELEG DEERE,
I OE OEE ALLOY A CORP ABZ EE OE
ODODE OE OPE IO OIE EE LAE LAL ODM LOPE EE PLEA EEE EE Sef LE OEE EOE EL,
ee ee Fe COMMA RELL. eee B ae hw : b: CO! pias “MI » Het oA ee ae
pS a ee oes PALS WeybaCOUMty: Maren eee Aes 2 IN
RAO OEE LOE EE EEE ELA ILE OEE EEE EAA EM EE EE Bo OEE EEE EE EET,
EO EO IIE ELE LE ELLE EL EEE EEL LILLE EEL EEE OE ILE ERE EE EE AES
Pee EEE EE CRE CEG CPR EEE Ll OO EOP EI LEI IE ELL ELBE IEEE G IE
pease ee eee ee ee ee ee ORT BARB OF oO OF Ee
OOK A OO EE EOE oe ORIOL OOO nt PS OL wl te ¢ EEE oe
pen Ae ae ie Me SCAangareckd Kunr a OE OO OE OE,
SEL LEE eel ed <s Deter Conyers: & Kym O'Brien ane oo oe
eRe IIIT SPIEL SILL SIG PAI LSPS ALATEST IS SISA ICLP OP EPRI De
LAO C6 CE EOE AAG CEE ERE ECL EC EEL LEE CLE EEO E EE EEE EEE CET IEE
OO OO APO OR SPL hh OP OE OO, st if ne vows x sot fx ke OE
@ OE EEE ORD 2008 6 OE EOE
P Be OEE EL Ce eee PELL EE PELE § BOP EES PEE EOE Oe PEP aE Ga
eee ot ‘ a f oe pees Be Le ee See AS Oe ee oe Oe . ee Ae eee BAe ey ae |
Re Pea ee ate Be OB Na do Oe AE A OE a a le te me Ot be Oe ee
RR ee a we Be eee ate oe Applicant:<\- Be OEE MO ee gt elem
rege sree a a a a 1 hr at tal
ogee eo oe , ee . IN; (or ry oe ete Cn ee Re we en ele
remote (oo reri ine oo) MIDDAP DITCHFIELD PIL’: occ co ori:
Se ae A ee ee ee STREET Aen ee en ee et enn tte
peer corse oes GNR MARY THOMAS STREETS "coc ooo ooo
erat a wee tae esc ere -& * I - . - Pate ee ee wen POR ee ee)
SN IEE NOO SAVILLE 620 eee a
te Be ee Te ee ge , Bee cgi eee Re eee ee
Pn ee a eee ee a te ee ee a Re eee On et BEE a te OO oe ee ae
whee ee ee eee POEL Oe ele ne OE LEE ELLE POE PP EEE EEG GN!
ee ce ee ee Bat tn ee ee nae On A Fe Oe Oe Oe Bet ae oe
ee re ek Oe OL EEE GEE REEL OP OLE LEAT Ue ote Fat
ae Pe ge eg eg Ce EA ee et Pe ER et 0 ee REE EEE EE ee Paar Ca a eeSection 18
w ad . Cc
= 3
o on = ° >
“ Ww Ww s Ry oo =
2s g gageeloarens g sg g Nes e 208
. Q FS 2 9 3
. , = nN °
om ° Dao =, =: oO <
@ &. 3 NO Famo kB ae »S Ss ov o Bo o =
aon DvD D NaF 4 B
AODAAAADD VY “4 ® oO re} e ¢
a6 2 see Sbape 5 ® @ ~ oOo §& ° 86 v
=o c Spacek 22028 2 $”™ 9 Se 3 8 <5 ¢ S
2d " TOALAaZLSGEAG o o U8 ® ae : = 3 S
=f = O2ODralts @3 yy 20 : 37H ro)
s ‘M3 Ua
oS a SSA DRAGER EDS © © D =, ese 2 ’ MO: y
Ge B28 ease sees B re 3 eS a : &: 8
gs z < 28 83 00286595 2 7-8 § gre | me
= 8 : PS IRR ER OSS BS S$ oo: F § Co: > : Pio
a = : Pars 2®oOrs -* : : : TC: © : 2 :
a 3 : NOUS O38: a oomad § : : : 3: cal : : ot :
oO © . Coo =m : UO: : : : : : © : Dot :
8 3 $a9822 B B8o | DE : 68 8 ar
= = : fad Oo: 2: && : Dg : mo: : Dot}
: yw? a0. ©: J: i: < H : : : : 2 =x, : +t : Oo
4 @ a. : > +: : : @ : : oO
: @O:B: 9:4: : O3 : fg : en Dog >
70 : ma: D: G9: 6:: 8 : : ot : Doro g : Doty —
: PO: 5: J: 0: : 00 : 53 : Dolo ge : Dob
3 : eri @: 2: 8: © 89 : 2 ot : Df OW : Doig m
8 : a: : ®: Oo: @: : i Bot : of : Dob g : >i =z
8 > ' Qi: - Of: : > t+ Qs ¢ : . : soos . : Dot : =
& = : fC: : O: Or: rit Oo : : : : ot > : : : a
a 4 : @: : Qo: Or rr: [> wt : : : ot : : ot :
v > a =: : oO: : : os to: : . : : : >t : : DG :
: of Gt rr : : : : ot . : : ot :
s QO : Si: § boro: bot oioio: : : : i 2 ot : : 2: :
= : Si: ioi: 2 fob for: : : : : 2 . ° fot :
a x : Pobob bobbi iid i: : : ° : » ot : : 2 :
= : Of: ii: Dobro: io: ¢ Dg : Dork : Dik
mi : Or ri ii: Porof or : : : : 2 ot : : ot :
: QB: i: ii: Poroitoroioos : : bobo : 2 ops
= : Ori: Po obo boi : 2g : Doro : Dott
4 : PEPE EEE PEE GG I : : : Dt : : Dt :
” : Pb EE GG : 2g : Dott : Dob}
° PEPEPE PE baa Gg ob | PGB g Dik P
gS : ee Pb ib Dg : Pb PGi @
2 : PP PEPE E EEE ES : : : : Dt : : Dt :
D : PoP bbb: Ppp: : : : > it : : Dt =
A : Pop oi dof iboioiot: 2 io: > of : DoE Nh
% : PPP bi bib pop : : : : Dot w ho DO
ge weemeepres i § 2b bik
a“ ° WWOUMNNNN Sie
ho
oOo =. wWwwh ROD
aSSection 19
" MCU Application 11/12/2008 Page 2
1. EXECUTIVE SUMMARY
1.1 Site Details
SITE DETAILS re
Address 34 Elanda Street, Sunshine Beach
Contact Jimmy Wilmot, Peter Middap
Middap Ditchfield Architects
Cnr Mary & Thomas Streets
NOOSAVILLE QLD 4566
Phone: 5474 0877
. Fax: 5474 0906
Email: — [email protected] , [email protected]
@ Property Owner a Terry Ross, Peter Conyers, Nancy Conyers, Kym O’Brien
Location Sunshine Beach
RPD (Subject Land) Lot 160 RP 48112
Subject Land Area - «. 544m?
Local Authority Sunshine Coast Regional Council
Current Use Residential Uses
1.2 Application Details
Application Details
Application Type Material Change of Use to Residential Housing - Multiple Housing Type 2
. Duplex
@ Planning Classification (planning Planning Area - Eastern Beaches Locality
area, precinct class etc) Zone — Semi Attached Housing
Overlays: Part 7 Eastern Beaches Locality
Level of Assessment Code Assessable
Referral Agencies Nil
Material Change of Use P. Conyers & K. O'Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 20
MCU Application 11/12/2008 Page 3
2. INTRODUCTION
This report has been prepared on behalf of P. Conyers and K. Obrien in support of a Development
Application for a Development Permit for a Material Change of use of premises to allow for Multiple
Housing Type 2 Duplex
The subject land is situated at Lot 160 RP 48112, 34 Elanda Street, Sunshine Beach. The proposal plans
are shown at Attachment 1.
The report concludes with the recommendation that Council approval is warranted subject to reasonable
and relevant conditions.
Material Change of Use P. Conyers & K. O'Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 21
"MCU Application 11/42/2008 Page 4
3. SITE & SURROUNDING CHARACTERISTICS
3.1 Site Description
The subject land is described as Lot 160 RP 48112, 34 Elanda Street, Sunshine Beach. and contains an
area of 544m?. The site currently contains a building occupied by a single residence.
The site is a comer block, at the intersection of Elanda and Ferguson Streets.
Vehicular access to the site is currently via an entrance off Elanda Street.
Existing vegetation to the front of the site is not significant and will be removed within the proposed
building footprint. Existing Trees will be retained where possible.
The majority of the site is relatively flat, with a fall of approximately 1 in 20 to the Ferguson and Elanda
Street intersection. The gradient of the fall increases to approximately 1in 6 closer to the corner, but this is
largely outside the proposed building footprint.
3.2 Surrounding Development
The surrounding development is a combination of Units, duplexes and single detached houses.
4, | PROPOSAL DESCRIPTION
The proposal is for the demolition of the existing building and the erection of a new 2 storey duplex
development with basement carpark area.
Proposed Uses
Each unit in the duplex will be separately titled and designed for permanent living.
Design
The proposal is to construct a two storey duplex with basement carparking and swimming pools. The
Proposed Duplex is set back 4.5m (to fascia line. 5.6m to outermost vertical surface) from Ferguson Street
© and 6m from both Elanda Street and the South West Boundary. The Duplex is below the permitted height
of 8.0m.
It will be finished in a combination of rendered block with timber and light weight panelling. The roof form
is a low pitch with overhangs but is broken in its form to reduce the impact of the building to its neighbours.
Sunshine Beach is not dominated by any one architectural style and the proposed development is
designed to compliment the already rich diversity of styles in the area but maintain the scale and
landscaped character of the area. The style is typical of South East Queensland sub-tropica! design.
The extensive glazing combined with the modern materials will blend in well with the range of designs,
styles and materials within Eastern Beaches Locality.
Access and Car Parking
Vehicular access to the site will be from Ferguson Street, and will be approximately 3.6 metres wide. This
access will provide both the entry and exit to/from the site. Parking for four (4) vehicles is proposed. This
consists of two (2) residence and two (2) Visitor carparking.
Material Change of Use P. Conyers & K. O'Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 22
MCU Application 11/12/2008 Page 5
There is sufficient manoeuvring area on site for the vehicles to both enter and leave the site in a forward
direction.
5. PLANNING FRAMEWORK
5.1. The Noosa Plan
The Noosa Plan commenced on 3% February 2006, was amended March 2008 and is the relevant
planning scheme for the area. Within this plan, the site is located in the Eastem Beaches Locality, and in
the Semi-Attached Housing Zone. The proposed uses are consistent with the Semi-Attached Housing
Zone.
6. PLANNING ASSESSMENT
6.1 Codes and Planning Scheme Policies
The Codes applicable to this proposal, as contained in the Noosa Plan are as follows:
@ e Eastern Beaches Locality Code
e Semi-Attached HousingCode
e Residential Uses Code
e Landscape Code
e Engineering Works Code
Our assessment of the application against each of these relevant codes is set out below.
6.2 Eastern Beaches Locality Code
Development complies with the Easter Beaches Locality Code if it:
(a) fulfils the Specific Outcomes for the locality; and
(b) is a consistent use and fulfils the specific outcomes for the Semi-Attached Housing Zone.
(a) Specific Outcomes and Probable Solutions for the Eastern Beaches Locality
e Specific Outcomes Probable Solutions ere ad bed
7.9 Effects of Use = ,
Amenity
Of Uses are located, designed and operated to | No solution provided Y The proposal is for a
avoid significant adverse changes to the light, air residential use and is
quality, noise, accessibility or other conditions surrounded by similar uses. it
enjoyed by users of associated, adjoining or will therefore have no adverse
nearby uses. effects on these properties.
Character and function of the David Low Way
O2 The vegetated character of the David Low No solution provided ¥ NIA
Way is protected and new development
recognises and protects the function, capacity
and efficiency of the David Low Way as the
major north — south link throughout the coastal
part of the shire.
7.10 Built form
Density Y The density of development
03 The density of development within the site No solution provided is consistent in scale with
area— surrounding development.
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 23
MCU Application 11/12/2008 Page 6
a) is compatible with surrounding development;
b) does not exceed—
...di for Semi-Attached Housing Zone “has 2 x 2 bedroom units (4.8
A. for sites between 500m?- 599m? persons)
inclusively — 4.8 Persons.
“has low impact, maintaining
c} has a low site impact to enhance the the landforms and will be
opportunity to maintain natural site landscaped to enhance the
characteristics, including native vegetation and existing native vegetation.
natural landforms.
Height
04 Buildings and other structures— $4.1 Buildings and other ¥ The proposal has a
a) are low rise and present a building height structures have amaximum | maximum height of 8.0
consistent with structures on adjoining and height of- metres and two storeys.
surrounding land; e) in all other zones - 8m
b} do not exceed a maximum height of -
iii. For any other zone - 2 storeys
c) do not visually dominate the street, adjacent
properties surrounding spaces or the existing
skyline;
d) preserve the amenity of surrounding land
@ including privacy, views and access to sunlight;
e) respect the scale of surrounding vegetation;
and
f} respond to the topography of the sit and
minimise cut and fill where on a sloping site.
Setbacks
O5 Buildings and other structures are $5.1 Buildings and ¥The proposal complies with
appropriately designed and sited to— structures comply with the the standard minimum setback
a) provide amenity for users of the premises as minimum building setbacks requirement.
well as preserve the visual and acoustic specified in Schedule 1 - Parts of the roof overhang
privacy of adjoining and nearby properties; Minimum Boundary encroach a maximum of 600
b) provide adequate distance from adjoining Setbacks. into the side setbacks
uses;
Cc} preserve any existing vegetation that will
buffer the proposed buildings, - The Building's Fascia Line is
d) allow for landscaping to be provided between setback 4.5 metres from
buildings; Ferguson Street ( 5.6m setback
e) maintain the visual continuity and pattern of to nearest vertical surface).
© buildings and landscape elements within the This exceeds the Queensland
street, Development Codes 3.5m
f} protect the natural character and visual setback for a detached house
amenity of the beachfront on a block of land exceeding
450m? with a 15m_ street
frontage.
The side and road setbacks will
be planted in accordance with
the landscape code.
Site cover, gross floor area and plot ratio
06 The site cover, gross floor area and plot ratio | No solution provided ¥ The proposal complies with
of buildings and other roofed structures— a,b,c,d & e — refer to drawings
a) results in a building scale that is compatible for detait .
with surrounding development;
b) does not present an appearance of bulk to
adjacent properties, roads or other areas in
the vicinity of the site;
c} maximises the retention of existing vegetation
and allows for additional soft landscaping
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 24
' ‘MCU Application 14/12/2008 Page 7
between buildings;
G) allows for adequate area at ground level for
outdoor recreation, entertainment, clothes
drying and other site facilities; and
é) facilitates onsite stormwater management and
vehicular access.
07 Site cover does not exceed- Site cover is 37.5% (241.9m)
b) for Semi-Attached Housing Zone — 40%
(217.6m)
08 For Mulitple Housing Type 2 buildings have The plot ratio is 0.45 : 1
a maximum plot ratio of -
c) 0.45:1
09
070
Flooding and Drainage
O 011 Buildings and other works are designed and | $11.1 Floor levels for “Complies with probable
sited to— habitable rooms solutions
a) provide flood free access to premises and are—
flood free habitable areas; a) for areas where minimum
b) allow only minor, short term and infrequent floor levels are available—
flooding of non-habitable areas; not less than the specified
c) ensure drainage does not adversely impact level;
upon other premises; and b) for areas where flood
g) ensure filling or excavation does not modelting is available—a
adversely impact upon other premises by— minimum of 500mm above
j, causing ponding of water on the site or the modelled flood level; and
nearby jand; c) for areas where flood
ii. increasing flooding, which adversely modelling is not available, a
affects the safety or use of any land minimum of 500mm above
upstream and downstream; and the highest known flood
iii. adversely affecting the flow of water in level:
any overland flow path. AND
$11.2 Where Council
infrastructure is available—
a) any drainage (from
O buildings and land) flows to
that infrastructure; and
b) the infrastructure has the
capacity to accept any
additional loading;
$11.3 Car parking and
manuvering areas are
constructed at a level that
permits the parking area to
drain from the site by gravity,
without the need for
mechanical pumping.
Roof form
012 Roof forms— $12.1 The main roof of the ¥ The proposal complies with
a) contribute positively to the local skyline; building has a roof pitch no a,b, c, d& e.
b) complement the beachside character of the less than 5 degrees and has
locality, roof overhangs a minimum The proposed development
c) Use soft and articulated pitched or curved roof | of 600mm wide eaves to at has a roof pitch of 5° to the
forms; least 75% of the perimeter of | main roof, with the lower roofs
d) avoid low pitched (eg. Less then § degrees) or | the building; having a 2° pitch. All the roofs
box profiles/parapets; and AND
Material Change of Use P. Conyers & K. O'Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 25
" MCU Application 11/12/2008 Page 8
e) do not create opportunities for residents to $12.2 Buildings and maintain a minimum 600mm
overlook the private open space areas of Structures do not include roof | Roof Overhang
neighbouring properties. top terrace areas.
There are no rooftop terrace
areas proposed.
Sloping sites
013 Development on sloping sites- $13.1 Buildings and ¥ NIA
a) is responsive to the natural topography of the +} associated accessways are
site and minimises cut and fill; not constructed on land with
b) does not visually dominate the hill slope or a slope greater than 25% (1
interrupt the skyline; in 4);
C) is integrated with the natural site AND
d) for Multiple housing, takes the form of small | $13.2 Buildings are of split
separate buildings. level design that step down
the slope or have suspended
floor construction;
AND
$13.3 Cut or fill is less than
2m in depth;
AND
$13.4 The distance between
e the ground and the lowest
part of the floor of the
building does not exceed 3m
to avoid large under-building
areas;
AND
$13.5 Buildings present no
more than-
b) if in any other zone - 2
storeys at any one point
when viewed from the street
Entrance Statement
014 A significant entrance statement is v NIA
established at the southern entrance to Peregian
Beach via the David Low Way to enhance and
emphasises the sense of arrival to the coastal
area of the Noosa Shire from the south
Environment and cultural heritage values
3) 015 There are no significant adverse effects on | No solution provided Y The site has already been
biodiversity, natural vegetation, native fauna developed and this proposal is
habitat, landscape quality, water quality or for the replacement of the
cultural heritage values, including those related existing building with one of a
to— significantly higher quality.
a) changes to natural drainage;
b) changes to natural coastal processes; Apart from some moderate size
c} disturbance of the dune system and wetland trees, there are no other native
system fauna habitats, landscape
c) management of landslide and fire risk; quality, water quality or cultural
d) erosion and the transport of sediments off heritage values on the site.
site;
€) unmanaged public access;
f) effluent disposal:
g) changes to fauna habitat and behaviour; and
h} disturbance of buildings and features,
including natural features, of cultural heritage
significance.
[|Openspacenetwork PE
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 26
» "MCU Application 11/12/2008 Page 9
076 An integrated open space network is $16.1 Open space corridors | “ The proposal is not near
established, enhanced and protected throughout | and existing native land identified on Map 4 as an
the locality to— vegetation in areas indicated | open space corridor or existing
a) provide for both passive and active in Schedule 5 - Map 4 are native vegetation and will
recreational pursuits; protected from fragmentation | therefore not impact on it.
b) provide connectivity for pedestrians and and encroachment by
cyclists; development.
c) provide habitat connectivity for wildlife;
d) protect watercourses and drainage lines;
e) protect vegetation on steep slopes; and
f} form a scenic backdrop for residential
development.
Pedestrian and bicycle pathways
017 Safe and convenient pedestrian and bicycle | $17.1 Pedestrian and Y An existing pedestrian and
pathways are provided and retained between bicycle pathways are bikeway path is already located
and around key destinations. provided and retained where | in adjoining streets. This will
indicated in Schedule 5 - not be disturbed as part of this
Map 2; proposal, except to provide a
AND new footpath which will create
$17.2 Contributions toward a | an improved environment for
, Pathways Network are the users.
@ provided in accordance with
PSP20.
Beach Access Points
018 No solution provided Y NIA
AND
019
Air Craft Safety
020 v NIA
AND
021 v NIA
AND
022 ¥ NIA
(b) Specific Outcomes and Probable Solutions for the Semi-Attached Housing Zone
Specific Outcomes Probable Solutions Compliance ¥/x
031 The following defined uses and use | No solution provided ¥ The proposal is for (e)
classes are consistent uses and are located in Multiple Housing - Type 2
the Semi-attached Housing Zone- Duplex which is a consistent
(a) Home -based business Types 1 or 2; use within the Semi-attached
(b) Home —-based business Type 3; Housing Zone
(c) Commercial business Type 1 or 2
(d) Detached House;
(e) Multiple Housing Types 1 or 2;
(f} Visitor Accommodation Type 1
g) Visitor Accommodation Type 4
[7ATinconsistentUses SS |COCSC~—“—S~CSSSCSCSCSCSCS~™~™SOCOC*S
032
v N/A
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 27
” MCU Application 11/12/2008 Page 10
[748EffectsofUse
eee
Visitor Hostels
[7AgBuiltForm
Streetscape character
034 Buildings and other structures— $34.1 The main entrance of the | ~ The proposal complies with
a) contribute positively to the streetscape building faces and is probable solutions ~—_ except
character by addressing the street and adding | recognisable from the street $34.3 B.
visual interest through stepping the front AND
facades; $34.2 Buildings and other The proposed design includes
b) have a bulk and architectural scale that structures are designed to - windows, doors, courtyards
does not dominate the streetscape or detract | a) have maximum wall length and pools that address both
from the visual amenity of adjoining of 15m and each external wall | street frontages. Proposed
properties; plane incorporates at least access to the units is from
c) present as a small building of a domestic one design element of add Ferguson Street only.
scale within a landscaped setting; and visual interest and amenity
d) present well articulated facades where (such as windows, pergola, The nature of the site, |
garages or carports are not the dominant sun shading devices, combined with basement visitor
visual element when viewed from the street; balconies or a change of parking, accessed _— from
O building material). Ferguson Street, Does not
b} vary and break up the roof practically facilitate accessing
form through gables or different | Unit 1 from Elanda Street.
pitches to add visual interest
and define the individual
dwelling units
c) provide individual
segmented balconies for each
dwelling unit to reduce
dominant horizontal banding
and to provide private open
space or each tenancy
d) break up building facades
by incorporating different but
complimentary textures and
building materials; and
e) visually break up the bulk of
the building by integrating tall
plant species in front of and to
the side of buildings;
O $34.3 For Corner sites the ;
building design addresses both
street frontages by —
a) including doors and windows
on each face of the building
that fronts a road; and
b) incorporating an access
point from each street, one for
each of the dwelling units
located on any site
Garages and carports
036 Garages and carports are designed and | $36.7 Garages and carports- ¥ Complies with probable
sited to visually integrate with the building and | a) have a front boundary solutions
avoid dominating the street setback of a least 6m; and
b) adopt a roof form and
building style that are the same
as that of the building; and
c) presenta minimum width to /
Material Change of Use P. Conyers & K. O'Brien ‘
34 Elanda Street, Sunshine Beach Oct 2008Section 28
" , MCU Application 11/12/2008 Page 11
the streetscape (the total width
of garage doors is no more
than 6m or 50% of the frontage
width, whichever is the lesser,
where the structure faces the
street); or
d} that are visible from, but do
not face the street, include
windows or other articulation
and have a 6m landscaped
buffer between the structure
and the road frontage. and
$36.2 Covered parking spaces
located in the area between the
swelling fagade and the road
frontage do not comprise
carports
Professional offices
037 ¥ NIA
@ Front fences and walls $38.1 Front fences or walls are | “Complies.
038 Front fences and walls are designed and | -
sited to- a) not forward of the front plane
a) contribute to the attractiveness of the street; | of dwelling units; or
b) be compatible with the existing streetscape | b) no more than 900mm high;
character or
c) relate to the architectural period of the | c) no more than 1.2m high and
building; of open construction (ie at least
d) avoid interference with the movement of | 50% transparent),
stormwater; OR
e) allow for casual surveillance from the street | $38.2 For premises with | “ N/A
or where premises adjoin part of the major | frontage to the major road
road network, mitigate traffic noise network front fences or walls
f) provide for planting in front of high solid | are no more than 1.8m in
fences and walls; and height and are articulated so
g) ensure planting between the front fence | that a minimum of 2m 2 of the
and the footpath does not create an | landscaped area is provided
impediment for pedestrians using the footpath | between the fence and the
@ front property boundary.
6.3. Residential Uses Code
Specific Outcomes Probable Solutions Compliance “/x
14.52 Effects of Use no a“
Electricity supply infrastructure
01 The development does not adversely $1.1 No solution provided Y The site is not near an
impact on existing or future electricity supply $2.1 Development for uses electricity substation nor any
infrastructure; adjacent fo or within 50m of an overhead transmission lines.
AND existing electricity substation
02 All uses and works maintain an adequate incorporates noise attenuation
safe distance from electrical infrastructure measures to mitigate noise
including substations, overhead power lines, impacts; and
power poles and transformers. $2.2 Buildings and structures
{including swimming pools,
outbuildings) are not constructed f
sheds, tennis courts and
Material Change of Use P. Conyers & K. O'Brien 3
34 Elanda Street, Sunshine Beach Oct 2008Section 29
MCU Application 11/12/2008 Page 12
under overhead electricity
transmission lines, or within
electricity easements:
AND
$2.3 A minimum separation
distance is maintained from the
electricity transmission line to the
closed boundary of habitable
building and child activity areas,
as follows-
a} 20m for transmission lines
up to 132kV;
b) 30m for transmission lines
between 133kV and 275kV;
and
c) 40m for transmission lines
greater than 274kV.
Hot Water Systems $3.7 All hot water systems Y Will comply
03 Hot water systems are installed and installed are -
@ operated to support the efficient use of natural | a) solar systems; or
resources and minimize consequent pollution | b) electric heat pump systems;
such as green house gas emissions. or
c) natural gas or LPG systems;
or
any combination of a), b) orc
Water supply and conservation $4.1 & $5.1 For a Class 1 ¥ each unit incorporates a
04 On-Site water storage is designed and Building other than a Detached 3000L water tank
operated to support the efficient use of water; | House or Multiple Housing Type 1
Relative or Employee, where
AND located outside a reticulated
water service area, a rainwater
05 On-site water storage is adequate for tank is to be installed with the
occupants everyday use and fire fighting following minimum storage
purposes. capabilities -
a) Where no more the 3
bedrooms — 45, 000 Litres; or
b) Where more the 3 bedrooms —
60,000 litres;
AND
@ ¢) There is on the Lot a dam,
swimming pool or water tank
accessible for use by the fire
brigade that contains at least 5,
000 litres of water.
Erosion and sediment contro! No solution provided
06 Development does not cause erosion or | AdvisoryNote =———C~*~«~**«SS:sé&Fril_ errcosiorn’ and sediment
result in transport of sediments off-site. ' Persons undertaking ~*~ | control will be employed to in
|, development, includings:;. %,.. | | accordance with Noosa
| building work, are required © Council requirements
under the Environmental * =**
|. Protection (Water) Policy 1997
t (EPP) to ensure that sediment
;-and other material including =
} building waste, sawdust, «
concrete, cement or paint are
-not deposited or released into
a roadside gutter, stormwater
- drain or waterway, or into a*
. place where it could. eae
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 30
. MCU Application 11/12/2008 Page 13
|| reasonably be expected to
|. move or be washed into a
roadside gutter, stormwater |
drain or waterway and are not |
washed from the site. Council |
enforces the EPP and
penalties may apply. !
ne GG
Safety and security $7.1 The building entrance is Y Each Unit has a defined
07 For Multiple Housing Types 2, 3 and 4, clearly identifiable and visible Entry which is visible from
Buildings and outdoor spaces are designed to | from the street, footpath and the street, footpath and
protect the personal security and safety of driveway; driveway. The Entry Gate will
residents by allowing for natural surveillance. | AND be lockable and have an
S7.2 The internal path network Intercom.
has clear sightlines to the
dwelling entry and street access Internal path networks have
points: clear sightlines and do not
AND infringe into private outdoor
§7.3 Visitors have direct access living areas.
© to the entrance without passing
through private outdoor living
areas
Emergency access No solution provided YNA
08 For Multiple Housing Type 3, 4 & 5, Site
design and layout ensures efficient access
and egress for emergency vehicles.
Basement Drainage $9.1 Enclosed car parking and ¥ Complies
09 Buildings and access works are designed | manoeuvring areas are
and sited to protect persons and property in constructed at a lever that permits
the event of a flood and power failure the parking area to drain from the
site by gravity means, without the
need for mechanical pumping.
Separation of incompatible uses $9.1 Bedroom windows are at ¥’ Complies
070 Development is designed to minimize least 3m away from shared
noise carrying between dwelling units or driveways or carparking areas of
accommodation units by locating noise adjacent dwelling units or
sensitive spaces such as bedrooms away accommodation units.
from noise generating areas of the
, development, such as car parking areas or
© mechanical plant and equipment or
recreational facilities.
Mechanical plant & equipment $11.1Mechanical plant and ¥ Complies.
011 Mechanical plant and equipment equipment, including pool and
associated with residential uses are designed | spa pumps, pool heaters, air-
and located so as not to have an adverse conditioning units and
impact on the visual amenity of the site or refrigeration units are —
surrounding areas. a) where located at ground
level, screened by fencing
1.5m in height or dense
vegetation of at least 1.5m in
width incorporating grouped
trees and shrubs with
maximum separation
distance of 1m measured
from the centre of the plant;
and
b) for Multiple housing Type
2, 3 & 4 are visually
integrated into the line and
Material Change of Use P. Conyers & K. O'Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 31
‘ MCU Application 11/12/2008 Page 14
plane of the building and roof
design and do not project
beyond the height or width of
the building when viewed
from the street and adjoining
properties.
Ancillary recreation uses $12.1 If the use involves ancillary | ~ N/A
012 Ancillary recreation uses, such as outdoor | use of outdoor courts including
tennis courts and half netball courts, do not tennis courts, half courts and
have an adverse effect on the amenity netball courts — the use complies
enjoyed by users of adjacent or nearby with the requirements in Section 2
premises of PSP8 Tennis and Other
Courts.
Privacy $13.7 Transparent doors and ¥ As the two units are back
013 For Multiple Housing Types 2, 3 & $, windows are designed and to back and separated by the
Building and structures are designed and sited | located so they do not directly driveway there is no problem
to ensure the visual privacy of residents of the | face transparent doors or with privacy.
development and neighboring properties is windows or the private open
protected. Space areas of other dwelling Decks and windows are
units within 10metres; designed so that they do not
@ AND directly overlook
$13.2 Planter boxes, louvre neighbouring properties.
screens, pergolas, landscaping
and architectural design of Landscaping, privacy
balconies are used to screen the | screens and __ translucent
ground floor private open space glass will also be used to
of dwelling units or facilitate the privacy of both
accommodation units from upper | the unit occupants and the
level units (refer to Figure 14-2 neighbours.
Privacy Measures which
illustrates how trees, awnings,
screens, fences and planter
boxes reduce minimise the ability
to directly look into neighbouring
homes and yards).
Access to Sunlight $14.1 Development does not ¥ Complies
014 For Multiple Housing, buildings and reduce sunlight to at least 50% of
structures are designed and sited so as not to | the private open space areas of
unreasonable diminish the existing sunlight to | any adjoining residences to less
adjoining residences and associated private to than 2 hours between 9am and
© open space areas; 3pm on any day of the year;
OR
AND $14.2 Where overshadowing by
existing structures and fences
occurs to more than 50% of the
private open space areas of any
adjoining residences, sunlight is
not further reduced by more than
20%.
(See Figure 14-3 - Preventing
overshadowing)
015 Multiple Housing is designed and sited to | $75.7 No solution provided
minimise the extent of shadows cast on solar
photovoltaic cells on roofs of adjoining
buildings.
Material Change of Use P. Conyers & K. O'Brien ;
34 Elanda Street, Sunshine Beach Oct 2008Section 32
MCU Application 11/12/2008 Page 15
Sloping sites $15.1 Buildings and structures on | “Complies
016 On sloping sites, buildings and structures | sloping sites-
are designed to maximize the use of the a) Have a maximum distance of
natural topography and minimise the need for 3m between the ground and
cut and fill. the lowest part of the floor of
the building or the building
incorporates undercroft
skirting or screening (eg.
Timber battens) to the full
height of any undercroft area
higher than 3m above
ground level at the perimeter
of the building;
b) Are of split level design that
step down the slope or have
suspended floor
construction;
c) Limit the amount of cut or fill
to less than 1.2 m in depth;
and
d) Do not result in the spread of
@ ill beyond the footprint of the
building and associated
batters.
Table 14-22 - For Multiple housing Type 2 - Duplex
PES ei mel lu cece we cio ree? hee oY ACC ehiy sete as NS LOL TS) Eel ia eee
aS5BultFom
Garages and carports $17.1 Where lock up garages are
017 Garages, carport structures and vehicle included-
maneuvering areas are designed and sited to | a) Garages are stepped back a ¥ Complies
- minimum of 600mm from
a) provide for resident and visitor parking; each other, in relation to the
b) visually integrate with the building and do frontage; and
not dominate the street front; b) Atleast one open visitor “Complies
¢) allow opportunity for landscaping to screen carpark is provided between
vehicle parking and maneuvering areas; the building and the frontage
d) minimise the number of driveway accesses and is not restricted by gates
and security screens or other
e) allow safe and efficient access to and obstacles;
© egress from the premises. AND
$17.2 Garages, carports and ¥ Complies
uncovered spaces are designed
to allow vehicles to enter and exit
the site in a forward gear through
a 3-point turn maximum;
AND ,
$17.3 The development provides | ¥ Complies
for shared driveways to minimise
the number of access points,
except on corner sites where
garages or carports in the
development front separate
streets.
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 33
6.4 Landscaping Code
eo el:Tot (ROLL ce) Lis MM era oa 8) 40181 (RTL Cele (LeeLee) eo UT ERA RL sore ht at
Streetscape and amenity $1.1 Landscaped areas, notless | “Complies
of than the minimum areas and
dimensions specified in Table 14-
53 or 14-54, are provided and
maintained.
$1.2 Landscaping is designed, ¥ Will comply
planted and maintained in
accordance with PSP3
Landscaping Plants and
Guidelines
Building and Landscape design S2.1 Below ground components ¥ Complies
02 of buildings do not extend beyond
the above ground footprint to
allow for landscaping particularly
within building setback areas;
@ AND
$2.2 Basement car parks do not ¥ Complies
encroach into building setback
areas;
AND
$2.3 Plants are grouped in ¥ Will comply
mulched beds rather than planted
individually to provide for optimum
growing conditions and less
maintenance;
AND
$2.4 Landscaping is designed, Y Will comply
planted and maintained in
accordance with PSP 3
Landscaping Plants and
Guidelines
Species Selection $3.1 Plantings- ¥ Will comply
03 a) Comprise plant species
identified for the relevant
- landscape character area in
@ PSP3 Landscaping Plants
and Guidelines; and
b)} Avoid undesirable plant ¥ Will comply
species identified in PSP3
Landscaping Plants and
Guidelines.
OR
$3.2 For landscaping around pool | v will comply
areas-
a) No more than 30% of the
landscaped area is a mixture
of plants of focal origin and
exotic plant species,
provided none of the plant
species are undesirable
plants identified in PSP3
Landscaping Plants and
Guidelines; and
b) Palms and specifically Y Will comply
located in group plantings in
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 34
MCU Application 14/42/2008 Page 17
accordance with PSP3
Landscaping Plants and
Guidelines;
AND
$3.3 Root guards are utilised ¥ Will comply
around species with potentially
invasive roots.
Safety and security $4.1 No solution provided Y¥ Will comply
04
05 $5.1 Landscaping provided which | vWill comply
allows adequate visibility for
casual surveillance of public and
semi-public spaces, including
entrances and exits to sites and
buildings, by:
a) Planting trees which have ¥ Will comply
clean trunks to a height of at
least 1.8m; and
b) Appropriately spacing shrubs | “Wilt comply
at 1.2m Horizontal centres,
@ with a maximum height of
0,75m, t avoid clumping and
to retain sightlines.
06 S6.1 Street trees and trees incar | yyyjl) comply
parking areas achieve a
maximum of 900mm clear trunk
height for a 2.0m high tree at
planting and are able to attain a
clear trunk height of 1800mm on
maturity;
$6.2 All scrub planting to be a
maximum height of 700mm from
the road pavement (not top of VW
kerb) Wilt comply
© Services and utilities $7.1 Plant species used in v Will comply
07 landscaping adjacent to
substations, or adjacent to or on
electricity transmission line
easements, are less than 4m
high at maturity and do not
encroach with 3m of a substation
boundary;
OR
S7.2 For trees higher than 4m, ¥ Will comply
trees are planted at a distance
from any part of an electricity
transmission line at least equal to
the expected height of the tree at
maturity
$7.3 For power lines that connect
to a premises, the height of plant | vwill comply
species at maturity provides for a
2m clearance below the power
Material Change of Use P. Conyers & K. O'Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 35
MCU Application 11/12/2008 Page 18
fine;
$7.4 Trees and large scrubs are | ¥Will comply
located a minimum of —
a) 5m from electricity poles and
pillars;
b) 4m form street lamps;
C) 2m from stormwater
catchment pits; and
d) 2m from underground
service and utilities;
AND
$7.5 Plants are located to enable | ¥ Will comply
tradespersons to access, view
and inspect service meters, such
as water and electricity meters
AND
$7.6 Root barriers are installed ¥ Will comply
around trees that are located
within 3m of any infrastructures or
that have potentially [email protected] statements
08 $8.1 No solution provided YNIA
09 $9.1 Entry statements are low YNIA
maintenance and located entirely
within privately owned fand.
Private open space
010 $10.1 For Multiple housing
Types 2 and 4, each dwelling
unit provides for landscaped
private open space comprising-
a) for units at ground level, a ¥ Complies
minimum area of 25m2
exclusive of the clothes
drying are, with minimum
dimensions of 4m and
maximum gradient of 10%
- (1:10); or
© b) for units above ground level, | W N/A
a minimum area of 12m2,
with minimum dimensions of
2.5m; and
$10.2 For Multiple housing ¥ Complies
Types 2 and 4, the private open
space area in enclosed by side
and rear fencing, screening or
dense landscaping of at least
1.8m in height to protect the
privacy of residents; or
$10.3 For Visitor “NIA
Accommodation no solution
provide
Communal open space No solution provided. Because of the nature of the
011 site the communal open
space is limited to the
driveway area. Each unit
has substaintial private open
space in the way of paved
Material Change of Use P. Conyers & K. O'Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 36
. MCU Application 11/12/2008 Page 19
and lawn terraces and
landscaping that is provided
in lieu.
Screening & Mounding No solution provided
012 ¥ Complies
013 ¥ Complies
014 oY NA
015 Y NA
Streetscape character No solution provided
016 ¥ Will comply
017 ¥ Complies
° 024
Wildlife habitat protection $25.1 For Koala Habitat Areas
025 shown in Schedule7- Y NA
a} Aminimum of 70% of tree
species planted on the
premises are koala food
trees listed in PSP3
Landscaping Plants and
Guidelines; and
b} Where koala access is
impeded by a fence or
retaining wall-
i) Climbing poles are
erected at regular
intervals along the
Structure at an
approximate 45 degree
angle on either side of
_ the structure;
© ii} Plant vegetation within
close proximity
(branches touching} on
either side of the fence
to provide a natural
ladder; and
iii) Install panels or planks
horizontally along the
top of the fence to
provide a walkway,
where appropriate; and
c) Choose fence materials,
such as timber post and rail
or chain wire, that a koala
can easily grip and climb or
leave a minimum 300mm
gap between ground level
and the first rail or strand of
any fence; and
d) Where there is a swimming
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 37
pool in the landscape design
likely to be accessible to
koalas, a rope is provided to
enable koalas to climb out of
the pool;
AND
$25.2 Vegetation of local origin is
retained and replanted in areas
indicated in Schedule 5 on Map 4
— Open Space Networks.
Water management $26.1 The infiltration and
conservation of water is optimized | ~Will comply
through —
a) Selecting native plant
species identified in PSP3
Landscaping Plants and
Guidelines;
b) Grouping plants in mulched
beds;
¢) Minimizing impervious
surfaces;
@ d) Using semi-pervious +
pavement surfaces; such as
grass cell paving, as a
alternative to pervious
surfaces
e) Draining hard surfaces areas
to landscaped areas;
f) Planting microphytes along
driveways to absorb
hydrocarbons; and
g) Using surface and
subsurface drainage swales.
a
Soil stability No solution provide “Will comply
(028 Off street carparks ——SSSSCdTSSC“‘“‘;SOCUCOCCdYNATCC~C*Y
[029 OnstreetcarparksSSCTSCCSSCSCSC~“S*S™*S*~S~*~sYWNANS™SC“‘“CSCC#‘*#dS
6.5 Driveways and Carparking Code
Specific Outcomes Probable Solutions Compliance v/«
14.134 General “ a — =
O17 Vehicular access does not adversely $1.1 Vehicular access is ~ The proposed access and
impact on safety, capacity and operations of located and designed in driveway has been designed in
the existing or planned road network, the accordance with AUSTROADS | accordance with AS2890.1.
proposed driveway, cycleways or pedestrian Guide to Traffic Engineering
pathway systems. Practice requirements for sight | Only 1 driveway is provided .
distance and Section 3 of
AS2890.1 Parking Facilities;
AND
$7.2 Only one footpath
crossing is provided; AND
$1.3 Driveways, other than
within any setback have a
maximum grade in accordance
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 38
MCU Application 11/12/2008 Page 21
dame PN
with Section 3 of AS/NZS
02 Driveways and crossovers— $2.1 Design of the driveway ¥ Complies.
a) are suitable and safe for their intended use; | across the footpath is in
and accordance with Council's
b) match Council infrastructure. Standard Drawings 9002 or
9005 as appropriate for the
particular type of development
as annotated on the drawings;
AND
$2.2 Driveways are designed
and constructed in accordance
with Council Standard
Drawings 9014, 9019, 9020,
9021, as appropriate for the
particular type of development
as annotated on the drawings;
AND
$2.3 The change in grades in
the driveways and ramps is in
° accordance with Section 3 of
AS2890.1 Parking Facilities.
03 In commercial zoned areas, the number of | $3.7 Design of multi-tenanted v NIA
driveways across pedestrian footpaths is developments in commercial
minimised. zoned areas include shared
driveways and parking areas;
AND
$3.2 Driveways are locatedso | WW N/A
they abut existing driveways of
adjoining development where
practicable and reciprocal
easements are created to
reduce the sealed driveway
width.
04 Vehicular access does not adversely $4.1 Footpath and kerb ~ Complies.
impact on the capacity, operations and crossings are located clear of
maintenance of the existing infrastructure; existing stormwater inlet
AND structures, water and sewerage
O85 Vehicular access does not adversely infrastructure fittings, any other
. impact on the integrity of existing landscaping | exiting utility infrastructure,
© or native vegetation. existing landscaping and
vegetation.
$5.1 No solution provided
06 Driveway run-off is filtered prior to leaving | $6.7 For— ~ Complies. Appropriate
the premises. a) Ancillary dwelling unit, stormwater quality will be
Multiple housing Types 4 or 2 | directed to landscape areas.
if less than 5 carparking
spaces, Visitor
accommodation Type 1 and
Home based business—the
driveway is formed to drain to
landscaped areas; and
b) for other uses—grease and
oil arrestors or stormwater
quality improvement devices
are incorporated into the
design to treat run-off prior to
run-off exiting from the
premises.
Material Change of Use P. Conyers & K. O'Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 39
. MCU Application 11/12/2008 Page 22
09 Sufficient carparking is provided to $9.1 The number of parking ¥ Complies.
accommodate the number and type of and loading bays is not less
vehicles likely to be generated by the than the minimum number
development having regard specified in Table 14-49
to the specifics of the use including— Vehicle Parking Requirements;
a) the type and intensity of land use; OR
b) any existing parking available on the site; $9.2 If insufficient carparking Y NIA
c) hours of operation; spaces are provided on-site a
d) likely numbers of users; monetary contribution is made
e) the peak parking demand periods of uses to Council in accordance with
on the site; and Section 6 of PSP13
f) the availability of alternative carparking. Contributions in lieu of
provision of off-street
carparking.
010 The layout of the development provides $10.1 Parking bays, ¥ The parking bays,
adequate, clearly defined and easily manoeuvring areas, queuing manoeuvring areas, etc have
accessible— areas, loading, setdown and been designed in accordance
a) on-site vehicle parking and manoeuvring pickup areas and driveways with AS 2890.1.
areas; and are designed to the standards
b} loading and manoeuvring areas for delivery | set out in Sections 2 and 3
@ and service vehicles of Australian Standard AS
2890.1 Parking Facilities (Part
1: Off-street Carparking) and
AS 2890.2 - Off-street Parking
(Part 2: Commercial Vehicles):
AND
$10.2 The number of loading
bays is not less than the
minimum number specified in
Table 14-49.
not unduly conflict with pedestrians and will accessed from rear laneways
not dominate the streetscape. where practicable.
012 Provision is made for a reasonable §12.1 Carparking spaces are v NA
number of on site carparking spaces identified | provided for people with
and reserved for people with disabilities. disabilities at the rate specified
in Section 2.4.5 of AS 2890.1 -
Parking Facilities (Partt: Off-
street Carparking).
013 Access and egress points do not impact $13.1 Vehicle manoeuvring v Vehicles will be able to enter
© on the safety and operations of the road afeas are provided in and leave the site in a forward
system. accordance with Section 3 of gear in accordance with AS
AS 2890.1 Parking Facilities 2890.1.
(Part 1: Offstreet Carparking)
so vehicles enter and leave the
site in a forward gear.
generate significant traffic and parking impacts generate significant traffic and
gives appropriate consideration to transport parking impacts.
and land use issues.
015 Business Uses and Community Uses $15.1 Safe and convenient ¥ NIA
are designed and constructed to encourage cycle access to and from the
users of the development to access the site by | site from the existing road and
means of foot or bicycle through provision of bicycle network, and safe
appropriate end-of-trip facilities including bicycle movement within the
bicycle parking and shower/change rooms site is provided;
AND
$15.2 Secure and convenient Y NIA
parking space for bicycles is
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008
|Section 40
. MCU Application 11/12/2008 Page 23
provided on site in accordance
with Table 14-48 Minimum
requirement for bicycle parking
and AS2890.3 Bicycle Parking
Facilities;
AND
$15.3 Where at feast 10 ¥ NIA
bicycle car parking spaces are
required in accordance with
Table 14-48, end-of-trip cycle
facilities are provided at the
following rate:
a) 1 locker per 2 bicycle
parking spaces; and
b) 1 shower cubicle with
ancillary change rooms per 10
bicycle spaces or part thereof,
providing facilities are either
unisex or both males and
female facilities are provided.
AND
©} $15.4 Bicycle parking spaces ¥ NIA
and cyclist facilities are
designed in accordance with
AUSTROADS Guide to Traffic
Engineering Practice, Part 14 -
Bicycles, Section 10.
AND
$15.5 On-site pedestrian “NIA
facilities such as seating and
shade are provided in
developments for the
convenience of persons
walking to the site.
016 Carparks are designed to ensure run-off | $16.1 Grease and oil arrestors | ~ Will Comply
is treated to remove pollutants prior to leaving | or stormwater quality
the premises. improvement devices are
incorporated into the design to
treat run-off prior to it leaving
the premises.
017 Carparking areas are designed to ensure | No solution provided ¥ Complies. No pumps or
© drainage without the use of pumps or other other apparatus will be required
electrical apparatus. to assist with the drainage from
the site.
078 Site layout and building design provides $18.1 Below ground ¥ Complies.
for soft landscaping to be established. components of buildings,
including car parks, do not
extend beyond the above
ground footprint to allow for the
provision of landscaping,
particularly within building
setbacks.
Table 14-49 - Minimum Vehicle Parking Requirements (extract)
Residential Use Vehicle Parking Requirements Compliance “//x
Type 2 Duplex ¥ Complies.
unit; 1 covered car parking space is
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 41
‘ ‘ MCU Application 11/12/2008 Page 24
AND provided for each unit. Each
1 space for visitor parking, unit also has a covered visitor
accessible at all times parking area that will be
accessible at all times.
6.6 Earthworks Code
Specific Outcomes Acceptable solutions (if self-assessable) Compliance W/x
Probable Solutions (if code assessable)
Drainage $1.4 The finished surface Y All surfaces drain to storm
07 Finished Surface Jevels ensure land is free | gradient of any filled or water outlets.
draining. excavated area is within the
range 0.5% to 1.5% and drains
to Council's stormwater
infrastructure where available
or where stormwater
infrastructure is not available,
© toward the street.
Hydraulics No solution provided. “ Generally the pavements
02 Any change to the level of the land does will be constructed to drain to
not have an adverse flooding impact on the the front of the site.
flooding and drainage characteristics off-site.
Geotechnical considerations For assessable development- | ~ All pavements are designed
03 Earthworks do not result in geotechnical | $3.7 Filling works are to meet the requirements.
instability on the premises or nearby premises. | undertaken in accordance with | A geotechnical engineer is
Section 2.8- Filling of Site of engaged to design the proposal
Council's PSP5- Engineering | so as not to cause instability on
Design Standards- Roads and | this or adjoining sites.
Drainage and Earthworks
AND
$3.2 Where the filling is for
residential commercial or
industrial purposes the works
comply with Sections 3 to 6 of
AS 3798 - Guidelines for
earthworks on commercial &
residential development.
@ Local amenity $4.7 The following control ¥ All construction methods
04 Earthworks do not cause disturbance to the | measures are implemented - will meet the requirements of
amenity of the neighbouring land a) Regular water council.
spraying of exposed
areas to suppress
dust;
b) Provision of dust
stabilised or sealed
internal roads;
c) Protective covering of
exposed areas that
are left for more than
2 weeks; and
d) If there is no valid
development permit
for the site, disturbed
areas are
revegetated using
species identified in
PSP3 - Landscaping
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 42
‘ MCU Application 11/12/2008 Page 25
Piants and
Guidelines.
AND
S4.2 Earthworks are
undertaken only during the
hours of 7am to 6pm, Monday
to Friday and 7am to 6pm on
Saturday. No work is
undertaken on Sunday or
public holidays.
Vegetative Waste $5.1 Cleared vegetation is v The disposal of all
05 Vegetative waste cleared from a | transported off-site for disposal | vegetation to be removed will
development site is disposed of in an | in an approved green waste meet council requirements.
environmentally responsible manner. disposal facitity;
OR
$5.2 Cleared vegetation is
muiched on-site and reused for
landscaping of the finished
development;
OR
$5.3 Cleared vegetation is
©} disposed of for the purpose of
firewood
Managing contamination risk $6.1 The fill material is solid ¥ Fill material will be required
06 Materials used as fill are suitable for | clean earth, free of putrescible | to meet the standards required
development of the land and filling or | or refuse material, vegetation, for construction.
excavation works do not result in the | acid sulfate soils, building or “The site is not on the
contamination of land. construction material or other contaminated land register
material or contaminants;
AND
S6.2 The site is not on the
contaminated land register.
Haulage activity and amenity No solution provided v All work for the
07 Haulage of material to and from a site development will —_utilized
ensures - normal machinery and haulage
a) minimal disturbance to neighbouring methods and use routes
properties and properties along the haulage currently acceptable for their
route; and use.
b) Councils Road infrastructure including
pavements is not adversely affected.
© Extent of earthworks $8.1 All earthworks, including ¥ All cut and fill is contained
08 Earthworks are contained within the cut and fill batters, retaining within the site.
property. walls etc are contained within
the subject site.
Environmental protection No solution provided. ¥ Sediment control measure
09 Earthworks minimise any adverse impact will be incorporated around the
upon groundwater, watercourses, drainage site.
lines, wetlands and native vegetation
[Dams Nov solution provided | Not Applicable
6.7. Erosion and Sediment Control Code
BES) Tele ee edad OF) RSL TE (Leh R este 1) FSO OLelI LIE Le a bake eens PCE Se etd
Erosion and sediment control $1.1 Site disturbance is limited | ~ Complies
01 Development minimises erosion ant to building areas, their
transport of sediments off-site surrounds and other use areas;
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 43
‘ MCU Application 11/12/2008 Page 26
AND
$1.2 Sediment barriers are ¥ Complies using council
provided throughout and approved methods
downslope of disturbed areas
to prevent sediment washing
into gutters, drains and
watercourses either on or off
the site;
AND ¥ Sediment Barriers are
$1.3 All stockpiles including proposed to contain migration
sand, soil or building materials | of building materials
are within the premises and
contained within individual
sediment barriers;
AND
$1.4 Sediment basins are ~ NIA
provided where the site
contains fine or dispersive
soils;
OR
$1.5 A storm water catchpit ¥ Complies using council
@ incorporating a stormwater approved methods
catchpit protection device is
installed so that all runoff from
disturbed areas flows to the
catchpit;
$1.6 For buildings,
a) Temporary or permanent ¥ Storm water connection is
downpipes are connected | proposed to avoid erosion
to the stormwater system
before laying the roof; or
b) Localised erosion is
avoided by directing flow
from down pipes over non-
erosive areas
Storm water runoff $2.1 Diversion drains or bunds | “ Stormwater is proposed to
02 Stormwater is diverted around disturbed are designed and constructed be diverted to avoid disturbed
areas. to drain upstream run-off areas
around the disturbed site;
AND
© $2.2 Discharge from the
diversion drains do not cause
run-off impacts to other
properties;
OR
$2.3 Alternative methods, as
described in the Institution of
Engineers Australia
(Queensland Division} Soil
Erosion and Sediment Control
- Guidelines for Queensland
Construction Sites, are used.
6.8 Existing Services Code
Specific Outcomes Probable Solutions (if code assessable} Compliance “/x
CO
| Setbacksandeasements ||
Material Change of Use P. Conyers & K. O'Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 44
MCU Application 11/12/2008 Page 27
01 Development near a sewer, water main, $1.7 The footing of any ¥ The sewer on the road
stormwater drain, or overflow path or structure or building is located | reserve is outside the zone of
associated structure does not - clear of the zone of influence influence of the proposed
a) adversely affect the function of the service; | butno closer than 1.5m building
b) place an additional load on the service; and | (measured horizontally) from
c) Unduly increase future maintenance costs. | infrastructure including sewers,
water mains and stormwater
structures;]
AND
$1.2 No building or structure ~ No overhangs are proposed
overhangs the zone of over the zone of influence of
influence; the sewer
AND
$1.3 Finished surface levels Y No service exist in the
maintain a minimum of 600mm | building zone
of cover, but no greater than
3m of cover to the underground
infrastructure;
AND
§1.4 If the existing surface v NIA
level is altered, surface level
© services including manholes
and inspection points are
altered to match the new
surface level;
AND
$1.5 Alterations are “NA
constructed in accordance with
Sections 3, 4 and 5 of PSP6-
Engineering Design Standards
- Water and Sewerage and
Section 4 of PSP5 -
Engineering Design Standards
- Roads, Drainage and
Earthworks,
AND
$1.6 Existing services are Y NIA
relocated and the design and
construction of the relocated
services is in accordance with
@ Sections 3, 4 and 5 of PSP6-
Engineering Design Standards
— Water and Sewerage and
Section 4 of PSP5 -
Engineering Design Standards
~ Roads, Drainage and
Earthworks.
02 Maintenance access is provided to all $2.1 A registered easement in | ~ N/A
sewers, water mains, storm water drains, favour of council is created
overland flow paths and associated structures. | over all underground
infrastructure located in private
property,
AND
$2.2 The width of the
easement is the greater of 2m
or the width of the zone of
influence;
AND
$2.3 The easement is centre
over the centreline of the
infrastructure.
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 45
MCU Application 11/12/2008 Page 28
6.9 Transport, Roads and Drainage Code
Specific Outcomes Probable Solutions (if code assessable) | Compliance v//x
$1.1 Where the development 1 extra dwelling unit is
leads to the need to increase proposed
transport infrastructure in the
Shire, the development
contributes to the transport
network in accordance with the
requirements of Infrastructure
Charges Plans (ICP); and
where developments requires
infrastructure not included in
the ICP, the development
upgrades the infrastructure at
© no cost to Council.
‘Advisory note sfigiy 0 M0" *
“Council may for some is.) «4.5
development require the ©”
; preparation ofa Transport:
i Impact Assessment Report? ':::,
; Planning Scheme Policy #¢:2:)
: PSP: details matters to be 3322
joa No solution provided | Complies
03 $3.1 Facilities for boarding and | “ The development is close to
exiting community transport existing public transport and
service and facilities are bikeway etc.
incorporated into
developments.
poe No solution provide, | Complies
a
Specific Outcomes Probable Solutions (if code assessable) Compliance v/x
$5.1 Road planning and design | ~ The development is
© supports the hierarchy and proposed in an existing
functional aspects identified in residential area which provides
Sections 2 and 3 of PSPS all these facilities.
Engineering Design Standards
— Roads, Drainage and
Earthworks;
AND
$5.2 Road and pathway
planning and design is in
accordance with, in order of
precedence —
a) Noosa Integrated
Local Transport Plan;
b) Queensland
Transport’s Shaping
Up;
c) Queensland Design
Code for Residential
Streets;
d) AUSTROADS Guide
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 46
: ' MCU Application 14/12/2008 Page 29
to Traffic Engineering
Practice;
€) Sections 2 and 3 of
PSPS Engineering
Design Standards -
Roads, Drainage and
Earthwork; or the
Noosa Cycling and
Walking Network
Development Pian;
OR
g) Acombination of the
principles in these
documents
AND
$5.3 On road cycling treatment
i utilised to provide safe and
continuous movement of
cyclists along a roadway, such
as -
a) Sealed shoulders;
@ b) Wide kerbside lane;
c) Exclusive or peak
period bicycle
Awareness Zone;
d) Shared parking /
bicycle lane;
e) Contra flow bicycle
lane; and bus/bicycle
lane.
$5.4 The provision of bicycle
lanes at intersections is
generally in accordance with
AUSTROADS Part 14, section
5 and the Manual of Urban
Traffic Control Devices
MUTCD) Part 9.
$6.1 Stormwater drainage ¥ Water quality devices are
planning, design and proposed to improve quality of
@ construction is in accordance stormwater before it water the
with Section 4 of PSP5 council stormwater system.
Engineering Design Standards
~ Roads, Drainage and
Earthworks;
AND
$6.2 As Constructed data is
submitted in accordance with
Section 6 of PSPS Engineering
Design Standards — Roads,
Drainage and Earthworks;
AND
$6.3 Stormwater drainage
planning, design and
construction is in accordance
with the Queensland Urban
Drainage Design manual.
07 §7.1 Roads and stormwater ¥ Complies
drainage infrastructure is
constructed in accordance with
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 47
MCU Application 11/12/2008 Page 30
a) Sections 2, 3 and 4 of
PSP5 Engineering
Design Standards —
Roads, Drainage and
Earthworks;
b) Queensland Design
Code for Residential
Streets;
c) AUSTROADS; or
d) Acombination of the
principles in these
documents;
AND
$7.2 Erosion and sediment
contro! measures are designed
and implemented in accordance
with Institution of Engineers
Australia (Queensland Division)
Soil Erosion and Sediment
Control - Guidelines for
@ Queensland Construction Sites.
$8.1 Roads and stormwater ¥ Complies
drainage follow the edge of
existing disturbed areas, or
alternatibely, these works are
co-located within a combined
utility corridor;
AND
$8.2 Roads avoid nativwe
vegetation and provide for
fauna underpasses and
associated fencing where
appropriate;
AND
$8.3 Road infrastructure within
or adjacent to native habitat
incorporates fences which allow
for protected wildlife movement
and controls unrestricted
access of domestic cats and
@ dogs:
AND
$8.4 Native vegetation is
protected from clearing or
construction activities by-
a) Clearly marking
vegetation to be
retained with flagging
tap;
b) Installing protective
fencing around the
dripline of vegetation;
and
c) Ensuring stock piling,
storage and vehicle
parking occur outside
the areas of
vegetation to be
retained;
AND
$8.5 Low impact construction
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 48
‘MCU Application 11/12/2008 Page 31
techniques are used around
areas of vegetation to be
retained to minimise
interference with the vegetation.
[ot—“‘ONCOOOCCOC#C#*NO'Solution provided = | WN Cid
010 $10.1 The location, design and | Y N/A
construction of stormwater
drainage structures is in
accordance with Sections 4 and
5 of PSP5, Engineering Design
Standards — Roads, Drainage
and Earthworks;
AND
$10.2 Where infrastructure is
located on private land an
easement is dedicated over the
infrastructure in accordance
with Section 4 of PSP5,
Engineering Design Standards
- Roads, Drainage [email protected] $17.1 The following
infrastructure components
already exist at the frontage of
the site or are provided at the
developer's expense — ¥ Complies
a) rman sealed All infrastructure is in place.
b) Concrete kerb and
channel where
appropriate;
c) Forming and grading
to footpaths;
d} Vehicular kerb and
footpath crossings;
e) Aconstructed
bikeway;
f} Aconstructed
footpath:
@ g) Aconstructed
carriageway;
h} Required alterations
to public utility main,
services or
installations:
i) Construction of any
required altercations
to public utility mains,
service or
installations;
j) Stormwater drainage
works; and
installation of
electrical conduits;
AND
$11.2 1 Road and drainage
design and construction is in
accordance with Sections 3 and
4 of PSP5 Engineering Design
Material Change of Use P. Conyers & K. O'Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 49
‘ ‘ MCU Application 11/12/2008 Page 32
Standards — Roads, Drainage po
and Earthworks.
$12.1 Noise sensitive uses Y NIA
including residential uses are
separated by a minimum of-
a} 40m from the
property boundary of
roads within the major
road network; and
b) 80m from the
property boundary of
rail corridors:
OR
$72.2 Development in the
vicinity of road corridors meets
the following external design
criteria for roads in the major
road network-
a) 54dB(A)L10418 hours)
© based on predicted
traffic volumes ten
years hence;
AND
$12.3 Development in the
vicinity of rail corridors meets
the following external design
level noise criteria ~
a) 65dB(a), assessed as
the 24hour average
equivalent continuous
A-weighted sound
pressure level; and
b) 87dB)A_, assessed
as a single event
maximum sound
pressure level.
@ 014 $14.1 Any alterations or repair | ~“ Complies
to infrastructure as a result of
the development are completed
at the developer's expense.
6.10 Waste Managment Code
Specific Outcomes Probable Solutions {if code assessable) Compliance “//*
Waste separation $1.1 Construction, operational | ~ All construction waste will
01 and demolition works are be stored on site in commercial
planned and manage in skip bins and disposed of by
accordance PSP124; the waste disposal contractor
AND to land fill/recycling
$1.2 Adequate area is
provided for on-site for the ¥ The bins will be situated
collection and separate storage | strategically on site and
of recyclable, non-recyclable, serviced regularly
vegetative and hazardous
materials in their specific waste
02 streams during construction,
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 50
‘ ‘ MCU Application 11/12/2008 Page 33
operation and demolition
works;
AND
$2.1 Waste storage areas
allow for the separate storage
of different waste materials for
reuse or recycling by -
a) Providing sufficient
area to store all
recyclable material
and recycling
containers required,
and
b) Sign posting the
types of waste .
stored.
Design and location of waste storage areas | $3.1 Waste storage areas are v A proposed waste
03 designed and maintained in management plan will be
accordance with PSP9; provided.
AND
$3.2 Waste storage areas are
@ designed and located sot they-
a} Are easily accessed
and convenient to
use;
b) Have unobstructed
access for the
collection of the
waste by service
vehicles;
c) Provide for sufficient
space for safe entry
and exit and
servicing by Council's
contractor without the
need for manual
handling;
AND d) Are clear of car
parking bays, loading
bays and similar
@ areas;
e) Are clear of footpaths
and pedestrian ¥ NIA
access;
f) Are capable of being
service by the
collection vehicle
without impeding
traffic flow; and
g) Have a level area
provided for the
storage of waste and | v Complies
recyclable materials
in standard waste
containers; and
AND
04 $3.3 For uses that do not
comprise a caretaker’s ¥ Complies
residence or central
management, the maximum
distance between waste
Material Change of Use P. Conyers & K. O'Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 51
‘ ‘MCU Application 11/12/2008 Page 34
storage areas and the kerbside
is-
AND a) For Multiple
housing Type 3 -
40m;
b} For other uses -
70m; and
$3.4 Pathways used to ¥ Complies
05 transport bins -
a) Have a maximum
grade of 1:15; and
b) Are free of steps,
stairs or other
AND impediments;
AND
$4.1 Waste storage areas are ¥ Complies
a) Integrated with the
06 building design,
@ where possible;
b) Setback a minimum
of 2m from side and
rear property
boundaries;
c) Screened to the bins
are no visible from
neighbouring
properties or passing
vehicular and
pedestrian traffic; and
d) Not located directly ,
adjacent to dwelling
units on the site on
neighbouring
properties;
AND
$5.1 Waste storage areas are
constructed of impermeable,
durable and non-textured
@ materials and surfaces so that
they are easily cleaned;
AND
$5.2 A minimum distance of
0.5m2 distance is provided
between and around waste
storage bins to allow for
manoeuvring and washing of
bins.
AND
S6.1 No solution provided
Water management for waste storage $7.1 The waste storage area— | “ Complies
areas a) !s bunded and
graded so that wash
water and bin
leakage are drained
to the sewer or an
on-site effluent
disposal system via
a gully within the
storage area:
Material Change of Use P. Conyers & K. O'Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 52
b) Has a bund wall with
a maximum height
of 100mm;
c) Is service be a
conveniently located
hose cock and back
flow prevention
device, and
connected to a
water supply; and
d) Is roofed or
otherwise covered if
the storage area is —
i) More than
1m2:or
ii) Storing wet
waste; or
iii) Storing other
waste with a
high potential
to cause
© pollution if
washed or
leaked from the
bins, including
waste oil or
putrescibles.
6.11 Water Sensitive Design Code
Specific Outcomes Probable Solutions (if code assessable) Compliance ~/x
Water reuse S1.1 No Solution provided ¥ A 3000L tank is provided for
01 each unit
02 §1.2 No Solution provided
AND
03 $3.1 Captured water is ~ Complies
plumbed to be available for all
external uses including
gardening, irrigation, ponds,
filling swimming pools and
outdoor cleaning, as well as all
ground floor toilet cisterns and
washing machine cold taps ¥ Complies
and
$3.2 Where the captured water
Material Change of Use P. Conyers & K. O'Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 53
MCU Application 11/12/2008 Page 36
is used for toilet flushing and/or
laundry use, an automatic or
manual interchange device that
allows alternate use of
captured water or the ¥ Complies
reticulated water supply is
installed to ensure that there is
a continual supply of water for
sanitary flushing and laundry
use.
$4.1 No solution provided ¥ NIA
$5.1 No solution provided ¥ NIA
Run-off treatment No solution provided ¥ Runoff is to the landscape
06 area
07 ¥ NIA
@ Town water supply connections $8.7 A suitable backflow ¥ Complies
08 prevention device is installed to
protect the potable water within
the reticulated water supply in
accordance with
AS/NZS 3500:2003
Plumbing and Drainage
Use of natural treatments and systems No solution provided ¥ Complies
09
10
v NIA
6.12 Water Supply & Sewerage Reticulation Code
Specific Outcomes Probable Solutions (if code assessable) Compliance “/*
@ 01 $1.1 Water supply ¥ Complies
infrastructure is designed in
accordance with Section 3 of
PSP6 - Engineering Design
Standards — Water and
Sewerage and As Constructed
data submitted in accordance
with Section7 of PSP6 -
Engineering Design Standards
~ Water and Sewerage.
$2.7 Water supply v¥ Complies
infrastructure is constructed in
accordance with Section 6 of
PSP6 — Engineering Design
Standards - Water and
Sewerage;
AND
§2.2 Erosion and sediment
control measures are designed
and implemented in
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 54
uO MCU Application 11/12/2008 Page 37
accordance with the Institution
of Engineers Australia
(Queensland Division) Soil
Erosion and Sediment Control
- Guidelines for Queensland
Construction Sites.
[os SSCSC~™~C~CSCSCCSCC YN slution provided. it NA SC—*S
05 $5.1 The footing of any ¥ NIA
building or structure is located
clear of the zone of influence
but no closer than 1.5m
(measured horizontally) from
infrastructure including sewers,
water mains and storm water
structures;
AND
§5.2 A registered easement in
favour of Council is created
over all underground
@ infrastructure located in private
property;
AND
$5.3 The width of the
easement is the greater of 3m
or the width of the zone of
influence;
AND
$5.4 The easement is centered
over the centerline of the
infrastructure.
$6.1 Infrastructure is designed | ~ Complies
and constructed on the
preferred alignments in
accordance with Section3 of
PSP6 Engineering Design
Standards ~ Water and
Sewerage.
07 $7.1 Any alterations or repair | ~“ Complies
to infrastructure as a result of
@ the development are completed
at the developer's expense
Specific Outcomes Probable Solutions (if code assessable} Compliance v/*
$8.1 Sewerage reticulation infrastructure is | ~“ Complies
designed in accordance with Sections 4 and
5 of PSP6 Engineering Design Standards ~
Water and Sewerage.
$9.7 Sewerage reticulation infrastructure is | ~’ Complies
constructed in accordance with Section 6 of
PSP6 - Engineering Design Standards-
Water and Sewerage and As Constructed
data submitted in accordance with Section
7 of PSP6 - Engineering Design Standards
- Water and Sewerage;
AND
$9.2 Erosion and sediment control ¥ Complies
measures are designed and implemented in
accordance with the Institution of Engineers
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 55
wo. *
MCU Application 11/12/2008 Page 38
Australia (Queensiand Division) Soil
Erosion and Sediment Control - Guidelines
of Queensland Construction Sites.
012 §12.1 The footing of any structure or ¥ NIA
building is located clear of the zone of
influence but no closer than 1.5m
{measured horizontally) from infrastructure
including sewers, water mains and storm
water structures;
AND
$12.2 A registered easement in favour of
Council is created over all underground
infrastructure located in private property;
AND
$12.3 The width of the easement is the
greater of 3m of the width of the zone of
influence;
AND
@ $12.4 The easement is centered over the
centerline of the infrastructure,
013 $13.1 Infrastructure is constructed on the ¥ Complies
preferred alignments in accordance with
Section 4 of PSP6 — Engineering Design
Standards ~ Water and Sewerage.
014 $14.1 Any alterations or repair to ¥ Complies
infrastructure as a result of the development
are completed at the developer's expense.
Material Change of Use P. Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 56
or tg a
MCU Application 11/12/2008 Page 39
7. CONCLUSION
The subject application is seeking approval for a Development Permit for a Material Change of Use to
Residential Use — Multiple Housing - Type 2 Duplex. The uses proposed are consistent with surrounding
uses. The proposal will involve the demolition of the existing building and its replacement with a high
quality building of modem design that will bring about an improvement to the streetscape, and the quality
of the pedestrian movements in the area.
The development is adjoining existing new development and aims to maintain the developing streetscape.
As outlined in the report, the development satisfies all relevant codes contained in the Noosa Plan.
It is therefore considered Council approval of the application is warranted subject to reasonable and
relevant conditions.
Yours faithfully
Jim Wilmot
Architect
MIDDAP DITCHFIELD
ARCHITECTS
Maternal Change of Use P, Conyers & K. O’Brien
34 Elanda Street, Sunshine Beach Oct 2008Section 57
ty
‘I
Architects
MIDDAP DITCHFIELD Pty Ltd t
PROJECT
Proposed Duplex
LOCATION
34 Elanda Street, Sunshine Beach
CLIENT
P.Conyers & K. O'Brien
PROJ No
0812
PROJECT DRAWING REGISTER
DRAWN
WD_00.0 Cover Sheet JW
WD 1.01 Site Cover and Landscaping : 11208
WD 4.02 Gross Floor Area
pT
WD 2.01 Basement Plan 11/12/08 | JW
WD 2.02 Ground Floor Plan P3 11/12/08 | JW
WD 2.03 First Floor Plan P4 11/12/08 | JW
WD 2.04 Roof Plan P4 11/12/08 | JW
|
WD 3.01 North West Elevation 1/12/08 | JW
WD 3.02 South East Elevation 11/12/08 | JW
WD 3.03 North East Elevation 8 | JW PY 11/12/08 MCU Application
| ISSUE DATE DETAILS
JW This drawing is subject to copyright and Fann be meprogcod in whole
MIDDAP OITCHFIELD ARCHITECTS.
Architects
MIDDAP DITCHFIELD Pty Ltd
Architect Reg. No. - P Middap - 001850 T Ditchfield - 002195
a.b.n. 49 064 466 708
Cnr Mary and Thomas Streets
NOOSAVILLE QLD 4566
Ph - (07) 5474 0877 Fax - (07) 5474 0906
Email - [email protected]
CUENT
P. Conyers & K. O'Brien
PROPOSED Duplex
LOCATION
34 Elanda St
Sunshine Beach
DRAWING
Concept Design
Cover Sheet
scale date drawn
4:250 @A3 Oct 08 Jw
0812 CD 0,00 P41Section 58
a o
a4
404
Development Parameters
Site 1GO on RP481 12
=a Site Address 34 Elanda St.
XI Sunshine Beach
QLD 4567
il ee EE a ee ee a Site Area 544m2
| pact l Lol | Locality Eastern Beaches North
it a Zoning Sem-attachea Housing
Definition of Use Residential Use
Multiple Housing Type 2, Duplex
MAIN alle Xe YTTTIN Gane Overlays Triggered No Overlays found for this
\ Property
4 ———_ Level of Assessment Code Assessment, Consistent
Use
MAXIMUM PLOT RATIO 0.45:1 Achieved 0.447: 1
Site Cover Plan 1:250 MAX. ALLOWED GFA 244. 6m? Achieved 244.5m2
{45% of Site Area)
MAX, SITE COVER 217.6m2 Acheved 204.6m2
SITE COVER (40% of Site Area)
TOTAL Setmapceix 204.6m? LANDSCAPING REQUIRED
Population Density 4.8
Site Area 544m2 TOTAL (4.8 x 40m2) 192.0m2 Achieved 358.2m2
Max. Site Cover (40%) 217.6m2 Soft (Min, GO%) 115.2m2 Achieved 1S59m2
MAX, BUILDING HEIGHT 8m
(2 Storey over basement parking)
aes an
Applicable Codes
LS ix |
iZwe ll (Based on the current Noosa Planning Scheme)
tr tame fh Eastern Beached Code Consistent P41 11/12/08 MCU Application
= eseecd
“
12m? 95m? 95m *s Residential Uses Code Consistent ISSUE DATE DETAILS
TT » {i This drawing is subject to copyright and cannot be reproduced in whole
a = EN Landscaping Code Consistent or in part by any madium without the written permission of
MIDDAP DITCHFIELD +
Architects
Engineering Works Code Consistent
Il MIDDAP DITCHFIELD Pty Ltd
Architect Reg. No. - P Middap - 001850 T Ditchfield - 002195
a.b.n. 49 064 466 708
ANTI - 2S Cnr Mary and Thomas Streets
NOOSAVILLE QLD 4566
Ph - (07) 5474 0877 Fax - (07) 5474 0906
Email - [email protected]
he
CLIENT
P. Conyers & K. O'Brien
a) PROJEC
PROPOSED Duplex
Landscaping Plan 1:250 LOCATION
34 Elanda St
Sunshine Beach
DRAWING
LANDSCAPING Concept Design
Site Cover & Landscaping
Soft as 159m2 scale date drawn
Other —d 199.2m2 4:250@A3 Oct 08 JW
ae
TOTAL 358. 2m2 2.5 Ze , 12.5 25 0812 CD 1.01 P1
ae" =
—__. ed
poreThe text continues on section 59.