Council archive · source document
001981A9.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
1.1B Does the proposal involve development, other than development mentioned in the Integrated Planning Act 1997 Schedule 9
(development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered in
a Local Heritage Register under Part 11 of the Queensiand Heritage Act 1992?
No - Goto Q1.2 L] Yes - (Complete Form 1, Part C,) This appkcation requires assessment by the relevant focal goverment against the [DAS
Code in the Queensiand Heritage Regulation 2003. if the development involves building work and the focal
govemment is not the Assessment Manager for the application, the local govemment has jurisdiction as Concurrence
Agency.
IPA, schedule 8, part 7, table 5, item 2A, schedule 9, lables 1,2 3. 4& 5: IP Regutation. schedule 2, table 1. item 11A: IPA, section 1.3.5 (Definitions for terms used in development).
Queensland Heritage Reqguiation 2003, schedule 2 (DAS Code)
REMOVING QUARRY MATERIAL; WILD RIVER AREA
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
No-Gotoai3 [_] Yes
IPA, schedule 8, part 1, table 5, item 1; IP Regulation, schedule 2, table 2, item 11; IP Regulation, schedule 1, table 5, item 2 (wild river area); Water Act 2000,
section 966C; Wild Rivers Act 2005, section 43A
en ll
ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petrofeum activity?
No-Gotoar4 [7] Yes
© IPA, schedule 8, part 1, table 2, item 1: IPA, schedule 8, part 1, table 5, items 3 and 4: IP Regulation, schedule 2, table 2, tems 1 and 23: Environmental Protection Act i994, section
73AA (wild river area); Wild Rivers Act 2005, section 43A: relevant wild river declaration: Wild Rivers Code.
WITHIN THE LIMITS OF A PORT a oY
1.4 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
No - Goto 01.5
[_] Yes
IP Regulation, schedule 2, table 2, items 15 and 16
‘DECLARED FISH HABITAT AREA _ . .
1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
No - Goto Q1.6
{_] Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation, schedule 2, table 2, item 26
@ (COMMUNITY INFRASTRUCTURE | BO |
1.6 ls any part of the premises designated for community infrastructure?
No - Goto Q1.7
_] Yes
IP Regulation, schedule 2, table 3, tem 7
pee ee as wae wee ee marine 8
.\WASTE WATER MANAGEMENT |
1.7 Does the proposal involve the establishment or expansion of a waste water disposal system?
No -End of Section [_] Yes
IP Regulation, schedule 2, table 3, item 5
ECTIO N 2 - Section 2 must be completed when the application seeks approval to materially change th f premises.
PLANNING SCHEME OO oe Oo
2.1 Is the proposed use assessable under the planning scheme?
{-] No - Goto Q2.2 Yes - Complete Form 1, Part D and answer Q2.1.1 - 2.1.13 below
if yes, does the application request that the proposal be assessed against a superseded planning scheme?
No —_[_] Yes- (Complete Form 1 Attachment 1)See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001981A9.001.pdfRelated documentPublic source context ↗
08/2093 - MCU - Mutliple Housing Type 2 - Duplex [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.