Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

001981A9.001

of 69

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

‘               MCU Application 11/12/2008                                                                                   Page    25

                                                                                 Piants and
                                                                                 Guidelines.
                                                                       AND
                                                                       S4.2 Earthworks are
                                                                       undertaken only during the
                                                                       hours of 7am to 6pm, Monday
                                                                       to Friday and 7am to 6pm on
                                                                       Saturday. No work is
                                                                       undertaken on Sunday or
                                                                        public holidays.
                        Vegetative Waste                                $5.1 Cleared vegetation is       v       The   disposal  of  all
                        05    Vegetative  waste    cleared  from   a | transported off-site for disposal | vegetation to be removed will
                        development    site is  disposed  of  in  an | in an approved green waste        meet council requirements.
                        environmentally responsible manner.             disposal facitity;
                                                                        OR
                                                                        $5.2 Cleared vegetation is
                                                                        muiched on-site and reused for
                                                                        landscaping of the finished
                                                                        development;
                                                                        OR
                                                                        $5.3 Cleared vegetation is
     ©}                                                                 disposed of for the purpose of
                                                                        firewood
                         Managing contamination risk                    $6.1 The fill material is solid  ¥ Fill material will be required
                         06 Materials used as fill are suitable for | clean earth, free of putrescible | to meet the standards required
                        development    of  the  land  and   filling or | or refuse material, vegetation, for construction.
                         excavation  works   do  not   result in  the | acid sulfate soils, building or  “The site is not on the
                         contamination of land.                         construction material or other   contaminated land register
                                                                        material or contaminants;
                                                                        AND
                                                                        S6.2 The site is not on the
                                                                        contaminated land register.
                         Haulage activity and amenity                   No solution provided             v        All  work    for   the
                         07 Haulage of material to and from a site                                       development      will   —_utilized
                         ensures -                                                                       normal machinery and haulage
                         a)  minimal   disturbance  to   neighbouring                                    methods     and   use    routes
                         properties and properties along the haulage                                     currently acceptable for their
                         route; and                                                                      use.
                         b)  Councils  Road   infrastructure including
                         pavements is not adversely affected.
   ©                     Extent of earthworks                           $8.1 All earthworks, including   ¥   All cut and fill is contained
                         08 Earthworks are contained within the         cut and fill batters, retaining  within the site.
                         property.                                      walls etc are contained within
                                                                        the subject site.
                         Environmental protection                       No solution provided.            ¥    Sediment control measure
                         09 Earthworks minimise any adverse impact                                       will be incorporated around the
                         upon groundwater,    watercourses,  drainage                                    site.
                         lines, wetlands and native vegetation
                      [Dams                                            Nov solution provided           | Not Applicable

                 6.7.   Erosion and Sediment Control Code

                        BES) Tele ee edad OF) RSL                       TE   (Leh R este 1) FSO OLelI LIE Le a   bake eens PCE Se etd
                         Erosion and sediment control                   $1.1 Site disturbance is limited | ~ Complies
                         01 Development minimises erosion ant           to building areas, their
                         transport of sediments off-site                surrounds and other use areas;
                  Material Change of Use                                                                      P. Conyers & K. O’Brien
                  34 Elanda Street, Sunshine Beach                                                                            Oct 2008

Used in these records

About this file

File size
3.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001981A9.001.pdf · 3.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.