MCU Application 11/12/2008                                                                                   Page   27

                     01 Development near a sewer, water main,      $1.7 The footing of any           ¥ The sewer on the road
                     stormwater drain, or overflow path or         structure or building is located | reserve is outside the zone of
                     associated structure does not -               clear of the zone of influence    influence of the proposed
                     a) adversely affect the function of the service; | butno closer than 1.5m       building
                     b) place an additional load on the service; and | (measured horizontally) from
                     c) Unduly increase future maintenance costs. | infrastructure including sewers,
                                                                   water mains and stormwater
                                                                    structures;]
                                                                    AND
                                                                    $1.2 No building or structure    ~ No overhangs are proposed
                                                                    overhangs the zone of            over the zone of influence of
                                                                    influence;                       the sewer
                                                                    AND
                                                                    $1.3 Finished surface levels     Y No service exist in the
                                                                    maintain a minimum of 600mm | building zone
                                                                    of cover, but no greater than
                                                                    3m of cover to the underground
                                                                    infrastructure;
                                                                    AND
                                                                    §1.4 If the existing surface     v NIA
                                                                    level is altered, surface level
©                                                                   services including manholes
                                                                    and inspection points are
                                                                    altered to match the new
                                                                    surface level;
                                                                    AND
                                                                    $1.5 Alterations are             “NA
                                                                    constructed in accordance with
                                                                    Sections 3, 4 and 5 of PSP6-
                                                                    Engineering Design Standards
                                                                    - Water and Sewerage and
                                                                    Section 4 of PSP5 -
                                                                    Engineering Design Standards
                                                                    - Roads, Drainage and
                                                                    Earthworks,
                                                                    AND
                                                                    $1.6 Existing services are       Y NIA
                                                                    relocated and the design and
                                                                    construction of the relocated
                                                                    services is in accordance with
@                                                                   Sections 3, 4 and 5 of PSP6-
                                                                    Engineering Design Standards
                                                                    — Water and Sewerage and
                                                                    Section 4 of PSP5 -
                                                                    Engineering Design Standards
                                                                    ~ Roads, Drainage and
                                                                    Earthworks.
                      02 Maintenance access is provided to all      $2.1 A registered easement in | ~ N/A
                      sewers, water mains, storm water drains,      favour of council is created
                      overland flow paths and associated structures. | over all underground
                                                                    infrastructure located in private
                                                                    property,
                                                                    AND
                                                                    $2.2 The width of the
                                                                    easement is the greater of 2m
                                                                    or the width of the zone of
                                                                    influence;
                                                                    AND
                                                                    $2.3 The easement is centre
                                                                    over the centreline of the
                                                                    infrastructure.
               Material Change of Use                                                                     P. Conyers & K. O’Brien
               34 Elanda Street, Sunshine Beach                                                                           Oct 2008

Used in these records

About this file

File size
3.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001981A9.001.pdf · 3.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.