Skip to the record
Accept no substitutions.

Original source · versioned page text

PA3660-Coastal Hazard Assessment - 4 arakoon

of 132

Page text read automatically using OCR, there may be inaccuracies

                                                                                                                        .
                                                                                                                                                   .
                                                                                                                                                                                                                                                                     COPYRIGHT: Drawings remain the Copyright of the Architect: Shaun                            ROOF DRAINAGE: All downpipes to be located as noted on the
                                                                                      Current Current                                                                                                                                                                Lockyer                                                                                     drawings and sizes as scheduled. Allow to connect to in-ground storm
                                Sheet Number Sheet Name                               Revision Revision Date                                       Key Value         Keynote Text                                                                                                                                                                                water drains with 90mmØ UPVC at 1:100 minimum grade. Allow for
                                                                                                                                                                                                                                                                     ALL WORKS shall be carried out in accordance with the Building Code                         I.O.'s at each change of direction and at 6000mm centres.
                                000.00      coversheet                                E             11/03/2024                                     bal01             frameless glass pool fence                                                                      of Australia, Australian Standards, Local Council requirements, QDC
                                000.01      general contents and notes                E             11/03/2024                                     bal02             frameless glass balustrade                                                                      guidelines and all other relevant by laws and authorities. In particular                    SITE DISCHARGE: All stormwater and sanitary plumbing to be
                                000.20      site photos                               D             11/03/2024                                     con01             exposed class 1/2 off-form concrete finish                                                      refer Australian standards:                                                                 connected to existing council system in accordance with the
                                                                                                                                                                                                                                                                     ꞏ site preparation A.S. 3798                                                                requirements of the relevant local authority.
                                N000.01     coversheet north house                    E             11/03/2024                                     con02             exposed boardform concrete finish
                                                                                                                                                                                                                                                                     ꞏ concrete construction A.S. 2870
                                N010.00     reference images                          D             11/03/2024                                     con03             polished concrete flooring                                                                      ꞏ timber construction and details A.S. 1684.2                                               WATER LINES: All hot water lines shall be fully insulated. All domestic
                                N020.00     material and finishes - exterior          D             11/03/2024                                     gls01             clear low e louvre glass                                                                        ꞏ steelwork AS 4100, AS 1111 and A.S. 1112                                                  hot water to basins, showers and baths to have maximum temperature
                                N050.00     3D perspectives                           A             11/03/2024                                     gls02             clear low e louvre glass louvre blades                                                          . termite protection BCA and A.S. 3660.1                                                    of 50°C. Allow to supply and install tempering valves where required,
                                N050.01     3D perspectives                           A             11/03/2024                                     mdp01             metal downpipe                                                                                  . artificial lighting & ventilation BCA parts 3.8.4/3.8.5 and A.S. 1680                     as nominated in the BCA and relevant standards.
                                N050.02     3D perspectives                           A             11/03/2024                                     mrh01             metal rain water head                                                                           . fire safety BCA part 3.7
                                                                                                                                                                                                                                                                     . smoke alarms BCA part 3.7.2 and A.S. 3786                                                 STAIR AND BALUSTRADES: All stair and balustrades shall comply
                                N050.03     3D perspectives                           A             11/03/2024                                     pdc01             black powdercoated metal elements
                                                                                                                                                                                                                                                                     . glazing BCA part 3.6 and A.S. 1288 and A.S. 2047                                          with part 3.9 of the BCA. Steps to be provided where fall from dwelling
                                N050.04     3D perspectives                           A             11/03/2024                                     pnt01             black paint (refer spec for shade)                                                                                                                                                          exceeds 190mm.
                                N050.05     3D perspectives                           A             11/03/2024                                     stn01             natural stone cladding                                                                          APPROVAL: No building work shall be undertaken prior to Building
                                N050.06     3D perspectives                           A             11/03/2024                                     tbs01             timber battens to match tim02                                                                   Approval by a registered Certifier.                                                         ALL PRODUCTS: To be installed to manufacturers requirements and
                                N050.07     3D perspectives                           A             11/03/2024                                     til01             large format tile                                                                                                                                                                           to be in accordance with manufacturers requirements for suitable
                                N050.08     3D perspectives                           A             11/03/2024                                     tim01             internal timber flooring                                                                        CONSULTANTS: Drawings shall be read in conjunction with engineers                           exposure levels.
                                                                                                                                                                                                                                                                     drawings and computations. All structure to Engineers design.
                                N050.09     3D perspectives                           A             11/03/2024                                     tim02             accoya timber cladding                                                                          Hydraulic sizing and design to hydraulic engineers requirements. All                        PROPRIETARY ITEMS: Identification of a proprietary item does not
                                N050.10     3D perspectives                           A             11/03/2024                                                                                                                                                       drawings to be co-ordinated with consultant documentation prior to                          necessarily imply exclusive preference for the item so identified, but
                                N100.01     site plan                                 D             11/03/2024                                                                                                                                                       construction.                                                                               indicates the necessary properties of the item. If alternatives are
                                N100.05     site photos - trees 01                    A             11/03/2024                                                                                                                                                                                                                                                   proposed, submit proposed alternatives and include samples, available
                                N100.06     site photos - trees 02                    A             11/03/2024                                                                                                                                                       DIMENSIONS: Do not scale off drawings - use figured dimensions only.                        technical information, reasons for proposed substitutions and cost.
                                                                                                                                                                                                                                                                     Contractor shall verify all dimensions on site prior to construction. Any
                                N100.10     site setbacks                             D             11/03/2024
                                                                                                                                                                                                                                                                     discrepancies or errors shall be referred to architect and client prior to                  TILES: Expansion joints, walls: 5mm. Floors: 8mm. Fill both with
                                N100.12     area plans - site cover                   C             11/03/2024                                                                                                                                                       installation / manufacture of any works. Confirm levels & RL's on site                      silicone rubber. Grout for wall: Epoxy based mildew resistant. Grout for
                                N100.13     area plans - construction costs           C             11/03/2024                                                                                                                                                       prior to commencement of work.                                                              floors: prepared grout to be acid resistant. all wall tiles to have
                                N100.14     area plans - GFA                          C             11/03/2024                                                                                                                                                                                                                                                   fcsubstrate.
                                N180.00     demolition plan                           B             11/03/2024                                                                                                                                                       SETOUT: Contractor to confirm exact siting and orientation prior to
                                                                                                                                                                                                                                                                     construction setout. All building setout and confirmation of setbacks                       INTERNAL PAINTING: Unless noted otherwise paint system to be




                                                                                                                                                                                                                                        general construction notes
   architectural drawing list




                                N200.00     lower floor plan                          F             11/03/2024
                                                                                                                                                                                                                                                                     and height to be carried out by a Licensed Surveyor. No footing, or wall                    Dulux approved 3 coat system - low sheen finish. Colours to be
                                N200.01     ground floor plan                         F             11/03/2024
                                                                                                                                 material legend
                                                                                                                                                                                                                                                                     to encroach the title boundary.                                                             supplied by Architect during contract and applied as per Dulux's
                                N200.02     first floor plan                          F             11/03/2024                                                                                                                                                                                                                                                   recommendations and guidelines.
                                N200.002b   first floor plan - marketing option       A             11/03/2024                                                                                                                                                       TERMITE PROTECTION: Termite protection by means of termimesh
                                N200.03     roof plan                                 D             11/03/2024                                                                                                                                                       s.s. mesh hysical barrier in accordance with A.S. 3660.1/2000 and                           JOINERY ITEMS SHALL INCLUDE: Manufactured casework items,
                                N300.00     east elevation                            D             11/03/2024                                                                                                                                                       installed in strict accordance with current manufacturers specifications.                   including: kitchen cabinets and cupboards; bathroom cabinets; robes.
                                N300.01     south elevation                           D             11/03/2024
                                                                                                                                                                                                                                                                     STRUCTURAL STEEL: Unless noted otherwise all exposed                                        SANITARY COMPARTMENTS: Provide removable hinges to doors of
                                N300.02     west elevation                            D             11/03/2024
                                                                                                                                                                                                                                                                     structuralsteel, anchor bolts and other attachments shall be hot dip                        sanitary compartments to comply with BCA 3.8.3.3 and be readily
                                N300.03     north elevation                           D             11/03/2024                                                                                                                                                       galvanised. A cold gal painted finish shall be applied to any field                         removable from outside unless there is a clear space of at least
                                N320.00     boundary elevation north                  B             11/03/2024                                                                                                                                                       welding to existing or new steelwork. All steel work cast in concrete                       1200mm b/w closet pan within the sanitary compartment and the
                                N320.01     boundary elevation south                  B             11/03/2024                                                                                                                                                       footings or slab shall have a bitumen finish applied to full extent of cast                 nearest part of the doorway.
                                N400.00     section 01                                D             11/03/2024                                                                                                                                                       in concrete steel. Check all dimensions on site prior to fabrication of
                                                                                                                                                                                                                                                                     steelwork.                                                                                  APPLIANCES & EQUIPMENT: Builder to co-ordinate all appliance and
                                N400.01     section 02                                D             11/03/2024
                                                                                                                                                                                                                                                                                                                                                                 equipment locations on site and with joiner. installation and final
                                N400.02     section 03                                D             11/03/2024                                                                                                                                                       RETAINING WALLS: All retaining walls to structural engineers details.                       connection by the contractor.
                                N400.03     section 04                                D             11/03/2024                                                                                                                                                       Provide rubble backfill and agg drainage to all retaining walls. Builder to
                                N400.04     section 05                                D             11/03/2024                                                                                                                                                       provide tanking where required.                                                             WEATHERSTRIPS: All external doors to contain weather stripping
                                N400.05     section 06                                D             11/03/2024                                                                                                                                                                                                                                                   (type to be confirmed by Architect prior to manufacture)
                                N400.06     section 07                                D             11/03/2024                                                                                                                                                       SLAB & FOOTINGS: All slabs and footings to structural engineers
                                                                                                                                                                                                                                                                     details. A polyethylene moisture barrier shall be lapped 200mm and                          DOCUMENTATION: The contractor shall carry out works in
                                N400.07     section 08                                D             11/03/2024
                                                                                                                                                                                                                                                                     fully taped under any habitable concrete slab and shall extend 100mm                        accordance with the signed drawings and schedules and anything
                                N400.08     section 09                                D             11/03/2024                                                                                                                                                       onto the perimeter footing.                                                                 reasonable inferred, and with the Conditions of Contract, and in
                                S000.01     coversheet S Block                        D             04/03/2024                                                                                                                                                                                                                                                   accordance with the directions and to the satisfaction of the Architect,
                                S010.01     reference images                          C             04/03/2024                                                                                                                                                       ARTICULATION JOINTS: Provide articulation joints to comply with                             whose interpretation of the contract documents shall be final. The
                                S020.01     material and finishes - exterior          C             04/03/2024                                                                                                                                                       "Cement and Concrete Association Construction Note TN9".                                    drawings and specifications/schedules shall be considered
                                S200.00     lower floor plan                          D             04/03/2024                                                                                                                                                                                                                                                   complementary, and any
                                                                                                                                                                                                                                                                     EROSION CONTROLS: All building works to comply with local                                   work and/or materials absent from one but present or implied in the
                                S200.01     ground floor plan                         D             04/03/2024
                                                                                                                                                                                                                                                                     authorities Erosion and sediment control standards.                                         other shall be furnished as if they were present in both.
                                S200.02     first floor plan                          D             04/03/2024
                                S200.03     roof plan                                 A             04/03/2024                                                                                                                                                       WATERPROOFING: All wet areas and walls to be waterproofed in                                FINAL CERTIFICATE: At completion of work, Builder to obtain and
                                                                                                                                                                                                                                                                     accordance with the BCA 3.8 & AS 3740. Builder to provide certificate                       supply a Certificate of Classification from a Building Certifier.
                                                                                                                                                                                                                                                                     of installation and compliance.
                                                                                                                                                                                                                                                                                                                                                                 POOL: Contractor to confirm heights/depths/steps and
                                                                                                                                                                                                                                                                     CONCEALMENT OF SERVICES: All services shall be concealed in                                 plumbing/electrical requirements and locations prior to construction
                                                                                                                                                                                                                                                                     walls or ducts. Where services are exposed they must be confirmed by
                                                                                                                                                                                                                                                                     the Designer on site prior to installation unless noted otherwise.

                                                                                                                                                                                                                                                                     LICENSED TRADESPERSONS: All services to be installed by licensed
                                                                                                                                                                                                                                                                     tradespersons in accordance with local authority and with current
                                                                                                                                                                                                                                                                     manufacturers specifications.




                                                                                                                                                       DRAWN   REV     DATE            ISSUE                                  PROJECT                                                       CLIENT                                  DRAWING NAME                                         PHASE        DWG NO         REV                               PROJECT NO           0428
                                                                                                                                                       aca     B       23/02/2024      client review                          4-6 Arakoon Crescent                                                                                                                                       SD           000.01         E                                 SCALE                1:1
                                                                                                                                                       aca     C       29/02/2024      client/marketing review                Sunshine Beach QLD 4567


                                                                                                                                                                                                                                                                                                                                                                                                                                                                       A3
                                                                                                                                                                                                                                                                                                                                    general contents and notes
                                                                                                                                                       aca     D       04/03/2024      townplanning review
                                                                                                                                                       aca     E       11/03/2024      client review
                                                                                                                                                                                                                                                                                                                                                                                         schematic design                                              1:1 @

Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.

Log in to download the original (PA3660-Coastal Hazard Assessment - 4 arakoon.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.