Original source · versioned page text
MCU19-0081_ICN.N1660_64 Gateway Dr NOOSAVILLE
INFRASTRUCTURE CHARGE CALCULATION DETAILS:
The infrastructure charge is calculated in accordance with Council’s Infrastructure Charges Resolution incorporating the charge apportionment (break-up) agreement with Unitywater in
compliance with the planning legislation and regulations applying at the time of issuing the notice.
• STAGE 2
NOOSA SHIRE COUNCIL CHARGES RESOLUTION (No.6) 2021 (Effective 20 August 2021)
The Noosa Plan 2006 Planning Regulation 2017 &
(Superseded planning scheme) The Noosa Plan 2020
Current at: 1 July 2021 for the 2021-2022 Financial Year
Column 1a Column 1b Column 2 Column 3 MCU19/0084 per P&E Appeal D176 of 2019 Judgement dated 16/07/2021
COUNCIL COUNCIL
Planning Regulation 2017 COUNCIL CHARGE CALCULATION
APPORTIONMENT CHARGE
Schedule 16 Prescribed amount NET
Use Use
(As inserted by the “Planning Legislation (Fees and Other (per Charges breakup agreement APPROVED EXISTING CHARGE
CHARGEABLE
Amounts) Amendment Regulation 2021”) of Prescribed amount) QTY QTY AMOUNT $
QTY
Residential uses
for each dwelling with 3 or more bedrooms $30,677.65 60% $18,406.59 0 $0.00
• Detached house
1 Dwelling house
• Ancillary dwelling unit for each dwelling with 2 bedrooms $13,147.56 13 13 $170,918.28
2 Dual occupancy
Multiple housing
3 Caretaker’s accommodation for each dwelling with 1 or less bedrooms
• Type 2 Duplex $21,912.60 60% $8,950.41 0 $0.00
4 Multiple dwelling (Council reduced rate by -31.9%)
• Type 4 Conventional
for each dwelling if Secondary dwelling to
$6,534.01 0 $0.00
Dwelling house (Council reduced rate by -50.3%)
Other industry
Industrial business
1 Low impact industry
• Type 1 Warehouse
2 Medium impact industry
• Type 2 Production, alteration, repackaging
3 Research and technology industry
and repairing
4 Rural industry
Service & utility
5 Warehouse
• Type 2 Installation
6 Marine industry for each square metre of gross floor area $54.80 64% $35.07 225 1057 -832 -$29,178.24
• Type 4 Treatment, recycling & disposal;
Other uses
Transport
1 Air service
• Type 1 Passenger terminal
3 Car park
• Type 2 Carpark
10 Port service
• Type 3 Depot
12 Utility installation
• Type 4 Aeronautical
Sub-Total, Residential = $170,918.28
Sub-Total, Non-Residential = -$29,178.24
STORMWATER (for Non-Residential Development only)
ALL Non-Residential Uses ALL Non-Residential Uses
for each square metre impervious to stormwater $10.95 100% $10.95 0 0 0 $0.00
(Except for Rural & Minor Uses) (Except for Rural & Minor Uses)
Calculation at
Planning
Regulation
2021-2022
Financial Year
CALCULATED INFRASTRUCTURE CHARGE = $141,740.00
Transport and/or Stormwater network service reductions due to
Location $0.00
development location
Council Policy “Infrastructure Charges Rebates For Community
Rebate $0.00
Organisations”
REDUCTIONS
Trunk Infrastructure Offset $0.00
Caretaker Units & Mezzanine Stormwater component already
Other covered by Industrial ground level impervious area (132007.738.4 - $17,092.00
IA)
*NET INFRASTRUCTURE CHARGE PAYABLE = $124,648.00
PO Box 141 P. (07) 5329 6500 [email protected]
TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au ICN - Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.