2018-08-07 Services and Organisation Committee Agenda

of 165

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                       7 AUGUST 2018


BRANCH ACTIVITIES                  RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                       THE NEXT QUARTER
DIRECTOR’S OFFICE
Rufous St Precinct Development        Stage 1 and 2 of the Rufous St Master        Awaiting outcome of the Stage 3        Commence planning for Stage 3 of
                                        Plan capital works completed                   grant application to the Federal         the Rufous St Master Plan
                                      Report and grant acquittal to DLIGP            Government’s BBR2 program
                                        finalised and grant monies received.         Finalise Digital Hub fitout
                                      Tender for Digital Hub tenants               Preparations for first Tenants
                                        finalised                                      moving into the Hub in July
                                      Stage 1 of the Digital Hub ground floor
                                        fit out commenced

Cooroy Memorial Hall Renovations      Renovation works at the Cooroy               Finalise lease arrangements with       Project now completed.
                                        Memorial Hall completed                        Cooroy Memorial Hall Association
                                      Cooroy Hall re- opened with a
                                        community concert on April 20

Purchase of Johns Landing             Purchase and clean-up of property            Nature Reserve application being       Finalise Nature Reserve status.
                                        completed                                      developed for the 70% of land
                                      Management responsibility transferred          purchased with environmental levy
                                        from Community Services to Natural             funds.
                                        areas.

LIBRARIES & GALLERIES
Cultural Plan                         Draft Cultural Plan complete and             Undertake public consultation          Review feedback from public
                                        endorsed by Council to go to public            phase                                    consultation
Complete the draft Cultural Plan
                                        consultation                                                                          Develop final version of Cultural
                                      Draft Vision Statement complete                                                         Plan and submit to Council
                                      Preparation complete for public
                                        consultation

Libraries
Noosaville Library Refurbishment      Arete (awarded contractor)                   Finalise outstanding design            Planning for Opening Event of newly
                                        commenced renovations on                       elements for specific sections of        refurbished library. Date planned –
                                        Noosaville library building in early           the new refurbished library –            4 December, 2018
                                        April                                          Heritage Room, Children's Area,        Prepare for construction completion
                                      Temporary libraries established at the         Makerspace and Outdoor                   and building handover
                                        Noosa Leisure Centre & Noosa Civic .           Courtyard.

                                                                                       Page 112 of 165
Log in to download the original file

2018-08-07 Services and Organisation Committee Agenda(PDF, 15MB).pdf · 15.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.