Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2018-08-07 Services and Organisation Committee Agenda

of 165

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                             7 AUGUST 2018


BRANCH ACTIVITIES                          RECENT ACHIEVEMENTS                         CURRENT PRIORITIES                        THE NEXT QUARTER
Investigate key transport strategies -      Project update report presented to        Progress September school holiday       Councilor workshop to progress key
Recruit a Project Manager and                 Council                                     trials.                                   priorities.
commence investigation of the five          Councillor workshop on analysis of        Recruit additional schools for ‘Walk    Present client expert reports to
prioritised strategies in the Noosa           Hastings Street precinct traffic and        and Ride to School’ program.              Council.
Transport Strategy 2017-2027                  pedestrian data.                          Continue discussions with TransLink
                                            Three schools participating in ‘Walk        and Sunbus.
                                              and Ride to School’ program.              Continue discussions with industry
                                            Behaviour change specialist                 specialists.
                                              consultants engaged.                      Progress funding opportunities.


Streetscape Plans - commence work             Design of Pioneer Park, Cooran is         Reviewing base data available for       Assess available base data for
on streetscape plans for three precincts        complete.                                   Cooroy, Pomona, and Noosa                 Cooroy, Pomona, Noosa Junction
                                              Design of car parking for hinterland        Junction and Gympie Terrace               and Gympie Terrace precincts and
                                                playground in Cooroy is complete.           precincts.                                determine if additional survey is
                                                                                          Design of Noosa Parade, Noosa is          required.
                                                                                            progressing.                            Collate and review background
                                                                                                                                      information for each precinct.

Infrastructure, Planning Design &             Ongoing review of projects to             Continuing the review corporate         Ongoing implementation through
Delivery - Ensure Noosa's Design                ensure they are aligned with the            signage guidelines and design             staff inductions, consultant briefings,
Principles and the Noosa Style are              Noosa Design Principles.                    criteria to create alignment with         design checklists.
considered in the planning of future                                                        design principles.
projects

Business as Usual activities                  Commenced construction of Park            Finalise detailed design of Noosa      Award tenders for:
                                                Road Boardwalk, Main Beach                  Parade corridor and Black Mountain      o Hilton Terrace intersection
                                                Boardwalk and Noosaville Library            Road upgrades.                             upgrade Stage 1 works.
                                                upgrades.                                 Design of Peregian Beach                o Orealla Crescent Bridge
                                              Completed public consultation for           Amenities                             Design of Bicentennial car park,
                                                Hilton Terrace                            Commence 2018/19 delivery of             Gympie Terrace Stage 2 and Pacific
                                              Main Beach Boardwalk construction           DDA Bus stop upgrade program.            Avenue upgrades.
                                                complete.                                 Design support for Tewantin Bypass    Commence design of Peregian
                                              Contracts awarded for Mary River            - Beckmans Road and Cooroy               Beach Boardwalk renewal.
                                                Road and Old Noosa Road bridges.            Connection Road projects.             Commence public consultation on
                                              Commenced construction on Mary            Design support for Transport             Peregian Beach public amenities.
                                                River Road bridge.                          Strategy.


                                                                                             Page 140 of 165
Log in to download the original file

2018-08-07 Services and Organisation Committee Agenda(PDF, 15MB).pdf · 15.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.