Council archive · source document
OPW info response · OPW15/0142
Attached to the e-mail OPW15/0142 Response to Information Request.
Information Required
Update details on landscaping design plans to ensure landscaping treatment within
bioretention basins are clear and consistent with Water by Design Bioretention Technical Design
Guidelines Version 1.1 October 2014.
Response
See amended plans by SYNC Landscape Design, Plan LP01-124 Revision C.
General
Information Required
9 Evidence of payment of performance bond ($10,000).
Response
The client is paying the performance and the receipt number will be forwarded as soon as
possible.
Information Required
10 Confirmation of compliance with Building and Construction Industry (Portable Long
Service Leave) Act 1991.
Response
The client is paying the Portable Long Service Leave and the receipt number will be forwarded
as soon as possible.
This is the response to the information request. Please complete assessment of the operational
works application OPW15/0142.
Yours faithfully,
Callaghan & Toth
Jane Davissen BE (Env)
Senior Environmental Engineer
Please view www.callaghanandtoth.com.au for all information on our company profile and terms and conditions for services rendered
Cc Peter Middap
X:\JOBS\CT Projects in progress\1303 SWQ plan for age care\Correspondence\OPW\OPW15.0142_InformationResponse_Letter.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW info response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 23 KB (small file)
- File type
No other editions are linked here.