“There will be earthworks required to facilitate construction of stormwater
treatment facilities, sanitary drainage and allow for an aesthetically pleasing
and functional built form. There is little opportunity for fill material to be won on
site therefore most of the fill material will need to be imported”.
While the total amount of fill required does not seem to have been identified in
the DA Figure 6 “illustrates the ‘swampy’ nature of the lower area of the site in
the vicinity of the proposed gabion wall” and states that “a fill wall of
approximately 2.0m will be required”.
PBCAI agrees with the comment at page 10 of 13 in the Information Request
“that the extent of filling of the site may need to be reduced.”
The volume of loose (uncompacted) imported fill material required could be in
the order of 25,000 cubic metres, constituting a major earthworks exercise.
This could require a total of between 5,000 and 10,000 trips by 3 axle trucks.
Assuming an earthworks construction duration of 3 months, this could give
rise to up to 150 heavy vehicle trips per day (one heavy vehicle every 3 or 4
minutes during the working day) along the David Low Way, via Sandpiper
Lane and on the access road to the IGA and the other shops. The impacts of
this would include:
- Significant noise and disruption to homes along David Low Way and
adjoining streets, the Peregian Beach Hotel, the hardware store and
the premises in the vicinity of the roundabout
- Substantial traffic congestion, noise pollution and safety issues at the
Peregian village roundabout
- Potential damage to the road pavement along David Low Way due to
the high concentration of heavy vehicle axle loads.
The importation of fill will result in the creek, which seems to have been
ignored in the DA, being diverted to run through the Council Reserve.
Importation of such high volumes of fill material is likely to create significant
problems of contamination in the adjacent reserve and wetlands.
9.3 Engineering Services Report – Page 7
PBCAI queries why water reticulation is proposed down the pedestrian access
lane to the Peregian Beach Sports Ground (Lot 75 on MCH839108) and a
Unity Water meter is proposed at the Peregian Beach Sports Ground
boundary rather than on the developers property
PBCAI also queries why Electricity supply will be provided by “installing
underground infrastructure down the Peregian Sports Reserve access strip”
rather than through the developers property.
PBCAI queries the contribution the developer will be required to make, if any,
to the rectification of this pedestrian access and the extent of any delay in the
lighting and development of this pedestrian access (Rufous Lane), which is
supposedly underway at present.
Document Set ID: 20307893
Version: 1, Version Date: 26/04/2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PM Submission Object - Peregian Beach Community Assoc Inc(Barry Cotterell) - Peregian Beach Community Association - MCU16/0153 & REC16/0041Related documentApplication case desk ↗
PM Submission Object - Peregian Beach Community Assoc Inc(Barry Cotterell) - Peregian Beach Community Association - MCU16/0153 & REC16/0041Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.