Appendix 5- Response to Planning Scheme Codes · MCU17/0027
Attached to the e-mail Engineering plans, Landscape Plan and Response to Code (Email 2 of 2) MCU17/0027 & OPW17/0119.
Specific outcomes, probable solutions and acceptable solutions for the Earthworks
Code
(1) Effects of Works
SPECIFIC OUTCOMES/ PROBALE SOLUTIONS COMMENT
Drainage S1.1 The finished surface gradient of any Complies
O1 Finished surface levels filled or excavated area is within the
ensure land is free draining. range 0.5% to 1.5% and drains to
Council’s stormwater infrastructure where
available or where stormwater
infrastructure is not available, toward the
street.
Hydraulics No solution provided. Complies
O2 Any change to the level The proposed works will not have
of the land does not have an an adverse flooding impact on the
adverse flooding impact on
flooding and drainage
the flooding and drainage
characteristics off-site. characteristics off-site.
Geotechnical For assessable development Complies
considerations S3.1 Filling works are undertaken in Earthworks will not result in
O3 Earthworks do not result accordance with Section 2.8- Filling of geotechnical instability on
in geotechnical instability Site of Council’s PSP5 - Engineering
premises or nearby premises.
on the premises or nearby Design Standards- Roads and Drainage
premises. & Earthworks
AND S3.2 Where the filling is for Complies
residential commercial or industrial
purposes the works comply with Sections
3 to 6 of AS 3798 - Guidelines for
earthworks on commercial & residential
development.
Local amenity S4.1 The following control measures are Complies
O4 Earthworks do not cause implemented— a) regular water spraying
disturbance to the amenity of exposed areas to suppress dust; b)
of the neighbouring land. provision of dust stabilised or sealed
internal roads; c) protective covering of
exposed areas that are left for more than
2 weeks; and d) if there is no valid
development permit for the site, disturbed
areas are revegetated using species
identified in PSP3 - Landscaping Plants
and Guidelines; AND
S4.2 Earthworks are undertaken only
Complies
during the hours of 7am to 6pm, Monday
to Friday and 7am to 6pm on Saturday.
No work is undertaken on Sunday or
public holidays.
Vegetative Waste S5.1 Cleared vegetation is transported Complies
O5 Vegetation cleared from offsite for disposal in an approved green Any vegetation cleared from the
a development site is waste disposal facility; OR subject site will be disposed of in
disposed of in an
an environmentally responsible
environmentally responsible
manner. manner.
S5.2 Cleared vegetation is mulched on- Complies
site and reused for landscaping of the
finished development; OR
Not Applicable
S5.3 Cleared vegetation is disposed of
for the purpose of firewood. (Note:
Disposal of vegetative waste by burning
off is not an acceptable method of
disposal).
Managing contamination S6.1 The fill material is solid clean earth, Complies
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix 5- Response to Planning Scheme Codes.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.