Council archive · source document
Appendix 5- Response to Planning Scheme Codes · MCU17/0027
Attached to the e-mail Engineering plans, Landscape Plan and Response to Code (Email 2 of 2) MCU17/0027 & OPW17/0119.
b) 0.3:1 for the balance of
the site area in excess of
2,000m2.
Roof form AO15 Complies
O15 Roof forms— S15.1 The main roof of the building has a
a) contribute positively to roof pitch no less than 5 degrees and has
the local skyline;
minimum 600mm eaves to at least 75%
b) complement the
character of the locality; of the perimeter of the building;
c) use soft and articulated, AND Complies
pitched, skillion or curved S15.2 Buildings and structures do not The development will not include
roof forms; include roof top terraces. roof top terraces.
d) avoid low pitched (eg.
less than 5 degrees) or box
profiles/parapets; and
e) do not create
opportunities for residents
to overlook the private open
space areas of
neighbouring properties.
Flooding and drainage59 AO16 Complies
O16 Buildings and other S16.1 For new buildings or structures or Floor levels for habitable rooms
works are designed and additions of more than 50m2 gross floor are not less than the specified
sited to—
area to an existing building or structure, minimum floor levels.
a) provide flood free access
to premises and flood free floor levels for habitable rooms are not
habitable areas; less than the specified minimum floor
b) allow only minor, short levels;
term and infrequent AND Complies
flooding of non-habitable S16.2 Where Council infrastructure is The stormwater infrastructure
areas; available— can accept any additional
c) ensure carparking areas
a) any drainage (from buildings loading. Stormwater will be
can be adequately drained;
d) ensure drainage does not and land) flows to that drained into the existing field
adversely impact upon infrastructure; and inlets which are located at the
other premises; and b) b) the infrastructure has the rear of the site. No mechanical
e) ensure filling or capacity to accept any additional pumping is required. The entire
excavation does not loading. site is above the Q100 flood line.
adversely impact upon c) AND
other premises by—
i. causing ponding of water d) S16.3 For Residential Uses—
on the site or nearby land; e) a) where slab on ground
ii. increasing flooding, construction is used, filling does
which adversely affects the not extend more than 1m
safety or use of any land beyond the building footprint
upstream and downstream; and access to car parking areas,
and
measured from the outer walls
iii. adversely affecting the
flow of water in any of the building ; or
overland flow path. f) b) the design consists of a
suspended floor construction;
g) AND
h) S16.4 Car parking and Complies
manoeuvring areas are
constructed at a level that
permits the parking area to drain
from the site by gravity means,
without the need for mechanical
pumping; or
i) S16.5 Basements for residential Not Applicable
uses have flood immunity above
the Q100 where alternative
means to mechanical pumping
are used to achieve such
immunity; or
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix 5- Response to Planning Scheme Codes.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.