SCRC CORRESPONDENCE


ilnl l l l l il►' f17 ^i1^ lil^]Ii
        S0047994                                                         Place Barcode here



                                            THIS IS THE NEXT PART OF A
                                      MULTIPLE PART RECORD
                                                            Part P-,- Of

                                     Application number:                                       ()P(/J I f                            / 71
                                              C Doatmems and Sc¢tngs%cje',Desktop,Mufti Part Record Cover Sheet NEXT PART (l l doe




                                                                                           I De` &oprnent cc
                                                                                                                      2 7 MAY 2011

                                                                                                            Maroochyc'

                                      Sox
Full text of the other 14 pages

Page 2

Page 3

                                       TITEPROFESSIONAL ENGINEERS


                    DOCUMENT DISTRIBUTION REGISTER
No 1 The Esplanade, Maroodtydore                                                                    Ph (07) 5443 2300 Fax (07) 5443 7126
PO Box 204. Maroodlydore, Old 4556                                                                            Email encineers(te net au


PROJECT:             SETTLERS COVE DEVELOPMENT                                              JOB No:                  S3000
CLIENT:              CAPE BOUVARD DEVELOPMENTS PTY LTD                                      PAGE No:                I OF 1

No.       DOCUMENT TITLE             DOC. No.                                                REVISION
 1. Tate Professional Engineers S3000/L7&8/08/SMP
    Stormwater Management Plan Dated October 2008
    dated October 2008
 2. Tate Professional Engineers S3000/L5&6/11/SMP
    Stormwater Management Plan      APRIL 2011
    LOTS 5 & 6 dated APRIL 2011




                                                                                           DATE O F ISS UE
                                                Issue                  1     2       3    4   5     6     7          8        9       10
                                                Day                   03    05      26
                                                Month                 10    04      05
                                                Year                  08    11      11            El=
                                                                                                    -

                DISTRIBUTION REGISTER                                               COP IES / REASON F OR ISSUE
1.    Sunshine Coast Regional Council                                 4/a
1.    Cape Bouvard Developments                                       1/x
2.    Sunshine Coast Regional Council                                       2/a     3/a
2.    Cape Bouvard Developments                                             1/x




A - Approval                         B - Building Approval       C - Construction               P - Preliminary
R - Revision                         T - For Tender              X - Information




Practice Manual                                              Page 1 of I                                        Form No. F08(b)/0

Page 4

                           TiATE
                               PROFESSIONAL ENGINEERS




                    STORMWATER
                  MANAGEMENT PLAN
                       Proposed Residential Development

                                                 at

                  Lots 5 & 6 Serenity Close, Noosa Heads

                  for Cape Bouvard Developments Pty Ltd

                                    S3000/L5&6/11/SWMP
                                            APRIL 2011
                                              SH/cf

    Prepared by             TATE PROFESSIONAL ENGINEERS PTY LTD
                            ABN 28 086 262035
                            Civil and Structural Engineering
                            Project Management
                            39-45 First Avenue
                            P. O. Box 1092
                            Mooloolaba, QId. 4557

                            Telephone:      (07) 5457 5300
                            Facsimile:      (07) 5477 6100
                            e-mail:         [email protected]

    The content of this document is provided in strict commercial confidence. The content of this
    document shall not be disclosed to any third party, without the express written authority of
    Tate Professional Engineers Ptv Ltd.

                                               Document Control

       Revision                                              53000/L5&6/11/SWMP - Auth orised for Issue
                           Author          g
                                          S1ire
 No.         Date                                           Reviewer        Si ture      Document Status
          April 2011    Steve Harrison                    Steve Harrison                          A


R - Revision                F - Final                    A - Approval                 P - Preliminary

Page 5

                                       - Contents -


1.0   INTRODUCTION ........................................................................................... I

2.0   EXISTING CONDITIONS .............................................................................1

3.0   PROPOSED DEVELOPMENT .....................................................................1

4.0   RAPID INFILTRATION PITS (RIP's) ........................................................ 1

5.0   CALCULATIONS ........................................................................................... 2




APPENDICES

APPENDIX A - RIP Management and Maintenance Plan

APPENDIX B - Fox BPT 600 Maintenance Schedule

APPENDIX C - Prototype RIP Test Results

APPENDIX D - Spreadsheet Model Results

Page 6

1.0    INTRODUCTION

This report is in support of an Operational Works application to Sunshine
Coast Regional Council seeking to develop a residential building at Lots 5 and
6 Serenity Close, Noosa Heads.

In particular, this report addresses water quality and stormwater management
issues raised in the Material Change of Use Decision Notice (Reference
2005/0699) for this project dated 6 December 2010.



2.0    EXISTING CONDITIONS

The subject site currently has bulk earthworks operations (basement
excavation) complete. The entire site consists of loose, poorly graded dunal
sand and as such contains no overland drainage paths since rainwater
infiltrates directly through the permeable surface.




3.0    PROPOSED DEVELOPMENT

Due to the sensitive nature of the local ecosystems, it is proposed to match
existing runoff conditions as closely as possible. In order to achieve this it is
proposed to reintroduce all runoff from impervious areas into the subsurface
via a series of rapid infiltration pits (RIP's). The remainder of the site will be
directed towards the numerous gardens on the site to infiltrate naturally.




4.0    RAPID INFILTRATION PITS (RIP's)

Runoff from impervious areas will be directed to a series of RIP's. Gutters and
spouting will be sized accordingly.       Tate Professional Engineers have
conducted testing for infiltration rates for ground conditions within the
development site. Results were consistent indicating a liner relationship
between driving head and infiltration rate such that:

Infiltration Rate (mm/s) = 4mm/sec + 13.6 x head (m).

Stormwater runoff from roofs is to be conveyed to RIP's via pipework with
runoff from hardstand areas conveyed via vegetated swales.         Rainwater
harvesting tanks are to be employed to capture and store roofwater for use in
irrigation.




S3000/L5&6/11/SWMP- Stormwater Management Plan April 2011                 Page 1 of 2
SH/cf
                         Tate Professional Engineers Pty Ltd

Page 7

It is proposed to link the RIP's together by a pair of 150mm dia slotted uPVC
balance pipes to prevent overtopping should one RIP become inoperable.




5.0    CALCULATIONS


In order to model the operation of the RIP's, a spreadsheet has been developed
and used for similar projects in Noosa Shire.

Temporal patterns for Zone 3 from the Australian Rainfall and Runoff, Volume
2 were applied. These temporal patterns were used in conjunction with the
average rainfall intensities for the Noosa region to create a series of design
storms of varying duration for a 10 year or 100 year average return interval
(ARI), depending on location of the RIP.

Temporal patterns were converted to flow rates by breaking each storm event
into a series of short duration storms.     A triangular flow verses time
approximation was used for each substorm with substorm flows then added to
produce flow Vs time for RIP inflow.

Outflow and water depth were then calculated through iterations for the
duration of the storm based on the infiltration rate / head relationship
discussed in Section 4. A factor of safety of 2.0 was applied to this infiltration
rate. Each RIP was then sized to prevent overtopping the appropriate design
storm event of any duration.

Spreadsheet model results are attached in Appendix C.




S3000/L5&6/11/SWMP- Stormwater Management Plan April 2011                 Page 2 of 2
SH/cf
                         Tate Professional Engineers Pty Ltd

Page 8

                /.1

RIP Management and
 Maintenance Plan


[OCR of page images]
 

A

RIP Management and
Maintenance Plan

 

 

 

 

Page 9

ELEMENT:                                                MAINTENANCE OF RAPID
                                                        INFILTRATION PITS (RIP's)
1.    Objective                To ensure ongoing function of RIP's in reintroducing
                               runoff into the subsoil.

2.    Management Strategy      Treat runoff from vehicular hardstand areas via
                               grease/oil arrestor units prior to discharge to RIP's.

                               Regularly service grease/oil arrestor units and RIP's to
                               ensure ongoing function.

3.    Actions                     1. Grease/oil arrestor
                                  -  service        as         per        manufacturers
                                     recommendations
                                  2. RIP's
                                  Daily/storm events
                                  -  inspect for overtopping or blockage
                                  Monthly
                                  -  inspect base of pit
                                  -  remove accumulated debris, silt and organic
                                     matter and dispose of to waste
                                  -  inspect geofabric filter (BIDM A14 material)
                                  -  Clean/replace if clogged/torn/damaged
                                  Annually
                                  -  replace geofabric filter
                                  -  inspect underlying sand filter layer for
                                     contamination/clogging
                                  -  replace sand filter layer if required

4.    Performance Indicators   No overtopping of RIP's during design storm events

5.    Frequency/Deadline       Inspections as detailed above.
                               Reporting at monthly body corporate meetings.

6.    Responsible     Person   Body corporate to ensure maintenance schedule
      /Organisation            adhered to.

                               Maintenance   contractor   to  make   entries in
                               environmental diary noting date of RIP service,
                               condition of RIP, material removed and means of
                               disposal.

7.    Reporting and Review     Maintenance     Contractor   to   make      entries  in
                               environmental diary noting date of service, conditions,
                               material removed and means of disposal.
                               Body Corporate to keep record of grease/oil arrestor
                               and RIP servicing.

8.    Corrective Action        Review maintenance schedule as appropriate.

Page 10

Fox BPT 600 Maintenance Schedule


[OCR of page images]
 

 

 

Fox BPT 600 Maintenance Schedule

 

Page 11

                                                                                                                                                                              To lift grate
                                                                                                                                                                              remove 2 x
                                                                                                                                                                              M8 bolts,
                                                            Schematic Detail of BPT600 Installation
Note: Do not distort pit walls
     when compacting concrete.
      Do not vibrate concrete near pit.
      If installed in bitumen a concrete
      collar must be provided. See
      drawing A4-INST-1016/2 for
      details.



                              Provide concrete thickening                            Class 'B' Grate
                              around pit. I                                                            0
                                                                                                       LO




                                                                                                            150 O.D. Outlet Pipe
                                                                                                            To Stormwater
                                                                                                            Invert Level 320mm




                 Set in bedding
                 sand or similar.

                                                                                                                    Available Options
                                                                                                                    225mm Stormwater Outlet
                                                                                                                                                   FOX                         SYSTIF M
                                                                                                                                                                                          S MENTAL


                                                                                                                                                   This Drawing and design is the Property of Fox
                                                                                                                    Class 'D' Grate                Environmental Systems Pty Ltd. It must not be used
                                                                                                                    Note: Inverts will change.     for any other purpose than that for which it was
                                                                                                                                                   issued. This drawing must not be shown or lent to
                                                                                                                    Request details if required.   anyone without the written permission of the Fox
                                                                                                                                                   Environmental Systems Pty Ltd.

                                                                                                                                                   Project:

Note:
                                                                                                                                                         Installation Instructions
This is a schematic representation only.                                                                                                           Drawing Title:
Slab size and gradient to engineers
details as arranged by customer.                                                                                                                   BPT600 with 150mm Outlet
All plumbing and electrical connections                               0880
to be installed by certified tradesmen in
accordance with relative authorities                                                                                                               Drawn by:                R.O'B.
requirements. Tradesmen to be engaged
                                                                                                                                                   Date:                    8/12/2006
by the purchaser.
System to be approved by relative Local                                                                                                            Scale:                   NTS
Authorities before Installation.
                                                                                                                                                   Drawing No:              A4 - INST-1016/1

Page 12

Housekeeping

To ensure that the Fox Model BPT600 unit performs the function for which it is installed there are some very
basic housekeeping functions that need to be performed. The interval between these activities is very much
site specific. A responsible approach to these functions will provide the maximum benefit to the environment.

    •   When large items of floating debris (such as plastic bags, drink cans etc.) are observed on the inlet
        grate of the unit they should be collected and disposed of in a suitable manner. The Fox BPT600 does
        not capture these items they simply prevent them from entering the stormwater discharge through the
        unit. If they are not removed they could still be harmful to the environment if they are washed or
        blown off the site.

    •   Regularly inspect the unit for a build up of captured pollutants within the silt basket. This should be
        done on a weekly basis or more often if large quantities of silts are being retrieved.

    •   To empty the silt basket the slide bolt on the grate should be slid back using a screwdriver or similar
        and the grate lifted and moved forward to enable access to be gained to the basket.

        Please note that the grate is heavy and proper care should be taken when removing it.

            •   Remove the silt basket and dispose of captured pollutants in a suitable manner such as
                emptying it in a garbage bin or similar.

            •   As soon as the basket has been emptied it must be replaced and the grate returned to its'
                locked position.

        For safety reasons the unit should never be left unattended when the grate and basket are
        removed. For maximum environmental protection and to reduce maintenance costs the silt
        basket should always be in place within the unit.


Regular servicing of the Chamber.

From time to time the chamber of the unit will need to be cleaned of silt build up and retained hydrocarbons.
The frequency of this activity will depend on the site conditions of each installation.

    •   Fox Environmental Systems recommend that initially the units are cleaned on a 3 monthly basis. This
        service should consist of a minimum of the following activities.

            •   Carefully capture any floating hydrocarbons in the chamber.

        Captured hydrocarbons must be disposed of in a manner prescribed in the Environmental
        Protection Act.

            •   Pump water from within the chamber and filter through a minimum 20 micron filter before
                allowing discharging into the stormwater system.

            n   Remove all silt and sediment build up from within the chamber and dispose of it in a suitable
                manner such as emptying it in a garbage bin or similar.

            n   Following each service quantities of pollutants that are removed should be recorded to enable
                proper assessment of the serving frequencies required to be ascertained.


 Fox Environmenta/Systems Pty Ltd offers a full service for the maintenance of the BPT600 units
 in SE Queensland. Contact our Service Manager on (07) 5437 8455 for information and costing.

Page 13

Prototype RIP Test Results


[OCR of page images]
 

C

 

Prototype RIP Test Results

 

 

Page 14

                                                                                      TABLE 1.0
                                                                                      RESULTS OF PROTOTYPE INFILTRATION PIT (IP)
                                                                                      TESTING 23 JULY 2001
p

a

I
                                                                                                                                         ..........
I
I
a
                                                                                                                                            11   M11111
I

a                                                                                      Ill I 11Y1111
                                                                                                  I             ILMAHI 111111                      11 ill
I
                                                                                             10        20                    30             40              50
I                                                                                             INFILTRATION RATE (mm/SEC)
I

I

I

                                                6MWt0 51F705    0.09" M.                                    u[ 1d[S90tK                  %7n                                                 VIAL G r:ttr




I
                                                W 001 qpqMXIM

                                                M         OVA
                                                                O.ewr:
                                                                 UOt.
                                                                   .

                                                                         cm .
                                                                               7006

                                                                                      TAT E                  B   76 066 267 035


                                                                                                            t. la) Nu 7300  {t>» Fly
                                                                                                            I ,e.pr^er.ptotr.rntw
                                                                                                                                 wu"Dn
                                                                                                                                         (tiTT [fl[ C
                                                                                                                                         JL^ 71iJ3.7        IliNfl

                                                                                                                                         at SERENITY COSE , NM NEAM
                                                                                                                                                                     YGlt 11 l 1 1{L 7^IYL




                                                                                                                                         for SETtIFRS DOVE DE)1F10?IQ(f PTY LTD
                                                                                                                                                                                                ^LT^




                                                                                                                                                                                             DRI1Ww0 ne:
                                                                                                                                                                                                         1T



                                                                                                                                                                                                              (,_/
                                                                                                                                                                                                                      T         [   R




                                                                                                                                                                                                                                        rw . a.


    ^^ wrt   U(SCrrrrr   _   _--   p.   [.rtD                   AI \HfI I %i
                                                                                                                                                                                             Count. Re
                                                                                                                                                                                                         •M11..w.^woss_vrnr r.t .n.n .... iiii ^ . ...K

Page 15

Spreadsheet Model Results


[OCR of page images]
 

 

Spreadsheet Model Results

 

Used in these records

About this file

File size
2.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Document 1.pdf · 2.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.