To lift grate
remove 2 x
M8 bolts,
Schematic Detail of BPT600 Installation
Note: Do not distort pit walls
when compacting concrete.
Do not vibrate concrete near pit.
If installed in bitumen a concrete
collar must be provided. See
drawing A4-INST-1016/2 for
details.
Provide concrete thickening Class 'B' Grate
around pit. I 0
LO
150 O.D. Outlet Pipe
To Stormwater
Invert Level 320mm
Set in bedding
sand or similar.
Available Options
225mm Stormwater Outlet
FOX SYSTIF M
S MENTAL
This Drawing and design is the Property of Fox
Class 'D' Grate Environmental Systems Pty Ltd. It must not be used
Note: Inverts will change. for any other purpose than that for which it was
issued. This drawing must not be shown or lent to
Request details if required. anyone without the written permission of the Fox
Environmental Systems Pty Ltd.
Project:
Note:
Installation Instructions
This is a schematic representation only. Drawing Title:
Slab size and gradient to engineers
details as arranged by customer. BPT600 with 150mm Outlet
All plumbing and electrical connections 0880
to be installed by certified tradesmen in
accordance with relative authorities Drawn by: R.O'B.
requirements. Tradesmen to be engaged
Date: 8/12/2006
by the purchaser.
System to be approved by relative Local Scale: NTS
Authorities before Installation.
Drawing No: A4 - INST-1016/1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Document 1.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.