Council archive · source document
Document 1 · OPW11/0177
From the archive Development Application - Part 2 of 3 - Stormwater Management Plan. File date in the archive: 2011-05-30 11:52.
1.0 INTRODUCTION This report is in support of an Operational Works application to Sunshine Coast Regional Council seeking to develop a residential building at Lots 5 and 6 Serenity Close, Noosa Heads. In particular, this report addresses water quality and stormwater management issues raised in the Material Change of Use Decision Notice (Reference 2005/0699) for this project dated 6 December 2010. 2.0 EXISTING CONDITIONS The subject site currently has bulk earthworks operations (basement excavation) complete. The entire site consists of loose, poorly graded dunal sand and as such contains no overland drainage paths since rainwater infiltrates directly through the permeable surface. 3.0 PROPOSED DEVELOPMENT Due to the sensitive nature of the local ecosystems, it is proposed to match existing runoff conditions as closely as possible. In order to achieve this it is proposed to reintroduce all runoff from impervious areas into the subsurface via a series of rapid infiltration pits (RIP's). The remainder of the site will be directed towards the numerous gardens on the site to infiltrate naturally. 4.0 RAPID INFILTRATION PITS (RIP's) Runoff from impervious areas will be directed to a series of RIP's. Gutters and spouting will be sized accordingly. Tate Professional Engineers have conducted testing for infiltration rates for ground conditions within the development site. Results were consistent indicating a liner relationship between driving head and infiltration rate such that: Infiltration Rate (mm/s) = 4mm/sec + 13.6 x head (m). Stormwater runoff from roofs is to be conveyed to RIP's via pipework with runoff from hardstand areas conveyed via vegetated swales. Rainwater harvesting tanks are to be employed to capture and store roofwater for use in irrigation. S3000/L5&6/11/SWMP- Stormwater Management Plan April 2011 Page 1 of 2 SH/cf Tate Professional Engineers Pty Ltd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Document 1.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.