written conditions
prevail
2 | Any alterations to the plans | At all times To ensure the
and document(s) identified development is
within Table 1 of this carried out generally
response are to be in accordance with
resubmitted to Energex for the plans of
comment development
submitted within the
ap ition
General Advice:

* Compliance with the Electrical Safety Act 2002, including any Code of Practice
under the Act and the Electrical safety Regulation 2013 including any safety
exclusion zones defined in the Regulation is mandatory

Should any doubt exist in maintaining the prescribed clearance to the overhead
conductors and electrical infrastructure then the applicant is obliged under the
Act to seek advice from Energex.

* Any costs incurred by Energex as a result of the works on the easement are to
be met by the property Developer / owner.

* This response does not constitute an approval to commence any works within
the easement. Consent to commence works relevant to the conditions of the
easement is required. All works on easement (including but not limited to
earthworks, drainage and detention basins, road construction, underground and
overhead services installation) require detailed submissions, assessment, and
consent (or otherwise) by Energex.

* All works proposed to be undertaken in close proximity to overhead or
underground electrical lines are to be undertaken in accordance with Energex’s
Works Practice Manual WP1323. This document refers to various standards,
guidelines, calculations, legal requirements, technical details, and other
information relevant to working near high voltage infrastructure. A copy of
WP 1323 can be found online via Energex's document library (Document library

Energex).

Should you require any further information on the above matter, please contact Harriet
Veal on 0427 293 604 or via email at [email protected].au-
Yours faithfully,
Warreet Veal
Harriet Veal
Town Planner

Have you seen our fact sheets?
See the ‘considerations when developing around electricity infrastructure’ section of our website

ww. energex.com au/referralagency

Page 7 of 8

Version: 4, Version Date: 19/01/2026

Used in these records

About this file

File size
446 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Decision Notice - RAL25_0019 (As Published).pdf · 446 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.