Council archive · source document
Request to Change Existing approval - Extension to Existing Building - 51901.1767.01
Very large file (13.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
"~ ..
,
Coast
I Sunshine
Council Request to Change Existing Ap
2012/13 Regional Strategy and Planning
roval and/or Extension to Relevant Period
,-
lii ii iii Sustainable Planning Act 2009
Development Services Information Counters Locations 80539377
8.30 am to 4.30 pm Monday to Friday (excludes public holidays).
Caloundra -
1 Omrah Avenue Caloundra Old 4551
Maroochydore -
Maroochy on First, 10 First Avenue Maroochydore Old 4558 per!
Nambour
Tewantin
-
-
Cnr Currie and Bury Streets. Nambour Old 4560
9 Pelican Street Tewantin 4565
Isox:02.:r...Q..’-Ft ......~.......l
ALL questions MUST be completed unless the form indicates otherwise.
This f~rm must be submitted to Council accompanied by the applicable fee.
Attach extra pages if there is insufficient space on the form.
If Council was the Assessment Manager for the existing appr val, and the approval was issued by the Court, then:D
(a)a request to change the development approval and/or conditions is made to the Court; and
(b)a request to extend the relevant period for the approval is made to Council.
All terms used on the form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning .Regulation
2009.
1. Details of person making the request
Full name -
individual or company Jeff and Nina Forbes
Contact Name -
for company CI Martoo Consulting
Postal address Po Box 1684
Suburb Noosa Heads I State QLD I Postcode 4567
Business phone 5447 2550 JAlH phone Mobile
Email address [email protected] Fax 54553322
J
2. Details of existing approval
Type of approval (please tick ALL applicable categories) Which entity issued approval?
X Development Permit o Sunshine Co st Council
o Preliminary Approval X Other entity -
le,~e ify -
Noosa CouDcil
0 Compliance Permit ",
0 Materi~1 Change of Use "
0 Reconfiguring a Lot "
",
0 Operational Works OJ ~’"
’S
I
,0 Building Works
"
0 Plumbing or Drainage Works -"""’... ..
0 Compliance Certificate
~ IOC)1ft.57’.’:’)
Privacy .
Council will use any personal information provided for the intended purpose only and for remaining in contact with ouneil is ~
authorised to collect this information in accordance with the Local Government Act 2009 and other Local Government Acts. Your
personal information is only accessed by persons authorised to do so. Your personal information is dealt with in accordance with
,council’s privacy policy.
[email protected] 07 5475 7272 F 07 5475 7277
locked Bag 72 Sunshine Coast Mail Centre Old 4560 I ABN 37 876 973 913
Caloundra office 1 Omrah Avenue Caloundra Old 4551 I Maroochydore office 11-13 Ocean Street Maroochydore Old 4558
Nambour office Cnr Currie and Bury Streets Nambour Old 4560 I Tewantin office 9 Pelican Street Tewantin Old 4565
1 of 4 2012/13 ~egional5trategy and Planning Request to Change Existing Approval and/or Extension to Relevant Period FM3002s
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 14 pages
Page 2
)
0 Environmentally Relevant Activity I
Application number/council reference 2093/2ITP I Date issued 18.12.1985
Is the approval for a mobile and temporary ERA? XNo 0 Yes -
complete below
Insert the name of each local government area in which the mobile and temporary ERA is proposed to operate/operating
X To change the development 0 To change the development 0 to extend the relevant period
approval conditions before lapsing
Please attach documentation outlining the detail of and the reasons and justification for the requested change or
extension.
Lot 1 on GTP 1450
5. Concurrence Agencies
Was there on or more concurrence agencies involved in the originar approval? X No
o Yes-provide details below
Note -
Under s372 of the Sustainable Planning Act 4009 the person making the request is required to give a copy of this request to all
concurrence agencies.
Concurrence Agency ! Date copy given
6. Pre-request response notice
Has a pre-request response been given by a relevant entity (e.g. a concurrence agency) for this request?
X No 10 Yes
Ifyes, please attach a copy of the notice.
7. Owner’s consent
Is the own.er’s consent required for this request? ONo
X Yes- complete either Table A or Table B below
Note - If more than one owner of the land all owners’ detailS are required
20f4 2012/13 Regional Strategy and Planning Request to Change Existing Approval and/or Extension to Relevant Period FM3002s
Page 3
"
Table B -
owner’s consent provided on form
Owner’s name/s Owner’s name/s
I/We, the above-mentioned ownerls of the land, consent o The owner’s written consent is attached.
to the making of this request.
Signature/s
Date ~, .03 .:20I 3
NOTES: For question 7
Under section 371 of the Sustainable Planning Act 2009, if the person making the request is not the pwner of the land to which the
approval relates, the request must be accompanied by the owner’s consent.
However, owner’s consent is not required if the approval:
relates to land the was acquisition land to which section 263(2)(d) of the Sustainable Planning Act 2009 applied when the
application for the approval was made; or
is for building work or operational work for the supply of community infrastructure on land designated for the community
infrastructure; or
the consent of the owner would not be required under section 263(1) of the Sustainable Planning Act 2009 if a development
application were made for the requested change.
.,;
Also, owner’s consent is not required if the Assessment Manager is satisfied that:
the number of owners of the land make it impractical to obtain owners’ consent, and the requested change does not materially
affect the owners’ land; or
;..’ having regard to the nature of the proposed change, the owner has unreasonably withheld consent and the requested change
does not materially affect the owner’s land.
~.
"
~
’4,
Nature (;)f State owned resource:
Nature of Evidence required:
o Evidence of allocation of I entitlement to, the resource 0Evidence the chief executive has uest
Attach a copy of the evidence required above
NOTES: For question 8
Section 370(3) and (4)of the Sustainable Planning Act 2009 requires that if an application for the development approval were made at
the time of making this request and evidence under section 264(1) of the Sustainable Planning Act 2009 would be required to support
the application, this request must be accompanied by the written agreement of the chief executive from whom evidence would be
required under section 264(1).
Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a State resource, a regulation may require
the application to be supported by certain evidence prescribed under regulation. Schedule 14 of the Sustainable Planning Regulation
2009 prescribes the State resources for which evidence is required to be given, and the evidence required, to support the application.
-
,
9. Declaration of applicant
I/We, the applicant, declare that the above information is correct in all respects, at the time of lodgement of this
application with the Sunshine Coast Regional Council. Should any of the details given in relation to this application be
changed in the future, the applicant shall advise the Sunshine Coast Regional Council in writing prior to any such change
being implemented.
Signature/s I Date
30f4 2012/13 Regional Strategy and Planning Request to Change Existing Approval and/or Extension to Relevant Period FM3002s
Page 4
1\
,
’.
’
.
Date paid I Receipt Initial
--- - -
-~’-t ---
no..
--
--
,-
I
I I
Receiving Officer
I
Payment options
In person Customer service centres: 8.30 am to 4.30 pm Monday to Friday (excludes public holidays).
By mail Cheque r money order to be made payable to: Sunshine Coast Regional Council.
~heque I D Money order D Mastercard DVisa
Card number Expiry date Amount $
Name on card Signature of cardholder
Phone Is a receipt required? DYes D No
3of4 2012/13 Re9lonal Strate9y and Planmn9 Req uest to Chan9e EXlstm9 Approval and/or Extension to Relevant Penod FM3002s
Page 5
J/9ol. /767.0(
Our Reference: 01485 L03 NG
30th April 2013
martoo
consulting _
Chief Executive Officer pty Itd
Sunshine Coast Regional Council
town planners +
Locked Bag 72
Sunshine Coast Mail Centre Q 4560 urban designers
+ surveyors
Attention: Planning North
Dear Sir/Madam
RE: LODGEMENT OF A DEVELOPMENT APPLICATION
PERMISSIBLE CHANGE TO A DEVELOPMENT APPROVAL - DETACHED HOUSE SITUATED
AT RAINTREE TERRACES 1/22 MITTI STREET, NOOSA HEADS DESCRIBED AS LOT 1 GTP
1450
Martoo Consulting has been engaged by Jeff and Nina Forbes, as applicants for the above proposal
to submit a permissible change to Development Approval 2093/2/TP to the Sunshine Coast Council.
This application seeks to modify the existing approval to enable extensions to the existing dwelling
on site at Raintree Terraces, Mitti Street, Noosa Heads.
This letter details the proposal and provides an assessment of the development against the relevant
code provisions contained within the 2006 Noosa Plan.
1. THE SUBJECT SITE
The subject site is an existing freestanding dwelling located in a development known as Raintree Terraces
Noosa Heads. The existing dwelling is located along Mitti Street frontage near the access driveway to the
Raintree Terra s development. The site slopes steeply down from the road to the rear of property and is
well vegetated.
;r-
/
/~?PMk
,....
q~~:UnC-’\ I
r P.."eoun
""""...
^’’’’’’’’’’’’
Aportrl’lef\b"""
"
I
,. "
Surl&l’wleCoau
T._
~
,/ qJ’’’_b/
N_
... ... ~
p:lI\I.Rd
lkl:ltoCo".
C""
.l
\ ~’Sl
!
’\ ,
"
~ ’.
..’ \ i
l ’I’L_ ~ ~-
"
SUNSHINE COAST OFFICE GYMPIE OFFICE
1/199 GYMPIE TERRACE, NOOSAVILLE PO BOX 1684 NOOSA HEADS Q 4567 38 NASH STREET, GYMPIE PO BOX 391 GYM PIE Q 4570
TELEPHONE 07 54555425 FACSIMILE 07 54555725 TELEPHONE 07 54827440 FACSIMILE 0754824952
[email protected] [email protected]
Page 1
Page 6
The subject site is included in the Detached House zone under The Noosa Plan and is also affected
by two overlays; Natural Hazard: Landslide & Flooding Overlay and the Natural Hazard: Bushfire &
Acid Sulfate Soils Overlay.
2. THE DEVELOPMENT APPLICATION
The applicant seeks approval to extend and upgrade the existing dwelling on site in the following
manner:
Lower ground floor
. Construction of a new ground floor bedroom, ensuite, study, laundry and access to
existing stairway underneath the existing dwelling on the site.
. Widening of carport area underneath building to create carparking for 2 vehicles
Ground floor
. New deck extension
. Internal upgrade of kitchen and bathroom area
. Replace and upgrade existing deck area
. New windows
Roof plan
. Replace existing parapet roof with Ritek Ecotek roofing. New 1.0 metre eaves
proposed over existing building form with a new roof proposed over the entry area.
. Minor intrusion into setback area.
The extensions are required to update the existing building, improve the function of the internal
layout, replace the leaking roof and provide an additional carparking space.
Proposal plans prepared by Rex Oakley Design are included in Attachment 1.
A Town Planning Appraisal has been issued for the proposed alterations and additions (Council
require an application to Change
reference TPA 13/0007) which indicated that the proposal would
the Development Approval 2093/2/TP.
Photograph of existing dwelling on site.
Page 2
Page 7
3. ASSESSMENT
In accordance with the Sustainable Planning Act, a change to development approval is defined as:
(1)A permissible change, for a development approval, is a change to the approval that
would not-
(a)result in a substantially different development; or
(b)if the application for the approval were remade including the change-
(i) require referral to additional concurrence agencies; or
(ii) for an approval for assessable development that previously did not
require impact assessment-require impact assessment; or
(c)for an approval for assessable development that previously required impact
assessment-be likely, in the responsible entity’s opinion, to cause a person to
make a properly made submission objecting to the proposed change, if the
circumstances allowed; or
(d)cause development to which the approval relates to include any prohibited
development.
The proposed works are considered to be consistent with the definition of a permissible change and would
not require referral to additional concurrence agencies, change the level of assessment and would not
cause a person to make a properly made submission. The works are very minor and improve the overall
amenity and function of the existing dwelling on site.
Noosa Plan
2093/2fTP was approved in December 1985 for a dwelling in excess of planning scheme requirements in
terms of height in metres and storeys. This application seeks to change the approval for a building of a
slightly different configuration.
The Noosa Plan includes the site in the Noosa Heads locality and provides the site with an Detached
Housing zone. Two Overlays are located over the site and include:
Natural Hazards: Landslide & Flooding -
Landslide Hazard Area
Natural Hazards: Bushfire & Acid Sulphate Soils -
Low Potential Acid Sulphate Area
The proposed works will not impact upon the stability of the site or acid sulphate soils as minimal works
will be undertaken and appropriate conditions may be imposed if required.
Noosa Heads Locality Code
The proposal has been reviewed against the provisions of the Noosa Heads Locality Code and is
considered to meet the requirements detailed in the Noosa Plan except in relation to building height and
setbacks.
The Noosa Plan details that the dwellings in the Detached housing zone are to be a maximum of eight
metres high and two storeys. The proposed extensions create a dwelling that is three storeys however is
considered to comply with the Specific Outcomes of the scheme as detailed below:
a) present a building height consistent with structures on adjoining and surrounding land;
surrounding spaces;
The proposed extension and alterations are of a similar height to the existing approved
structure and no real change to overall height proposed by additional storey.
d) preserve the amenity of surrounding land;
The proposed extension and alterations are not visible to Mitti Street and adjoining areas as
they are located in an existing undercroft area partially excavated into the site;
e) respect the scale of surrounding vegetation;
Page 3
Page 8
All existing vegetation to be retained and not affected by alterations. Existing vegetation is
taller than proposed dwelling.
f) respond to the topography of the site by minimising cut and fill (eg. stepping down the site
or using a suspended pole construction); and
Existing dwelling and alterations respect the topography of the site.
g) maintain a mature vegetated skyline.
Existing skyline not affected by the ground level addition.
The provision of a new awning over the entry area, slightly intrudes into the Mitti Street setback
area. The intrusion is considered acceptable as it is not highly visible to the surrounding area as the
site slopes steeply down from the road and is well screened by existing vegetation.
3. CONCLUSION
The proposed changes are considered to improve the overall function and form of the existing dwelling
and provide additional carparking as well as providing appropriate protection from the elements in terms of
a new roof and eaves. The new roof form and eaves add to the articulation of the building which is
consistent with the desired character of the area as detailed by the Noosa Plan.
The Assessment Manager’s favourable consideration of the above development application is therefore
recommended. Please contact our Sunshine Coast office if you require any further information and/or
clarification with respect to the above application.
Yours sincerely
~{k;:(~
Nadine Gorton
Senior Town Planner
Martoo Consulting Pty. Ltd.
Page 4
Page 9
...... ,...-
Attachments
Attachment 1 Proposal Plans
-
PageS
[OCR of page images]
Attachments
Attachment 1 — Proposal Plans
Page 5
Page 10
,,-
,
forbes house
alterations and additions
lot 1 / 22 mitti street
noosa heads
rex oakley design
po box 227
noosa heads
q 4567
[email protected]
07 54749286
Page 11
reYISIOnS
3000 2558 legend.existing ve getation
.
155’2> ~~
~
’,~ CD ’hoop pine
(j) palm
rn i tti
st
reet CD box
9’759 M (scrub
CD cypress pine
~ ex istin 9 tree
:2:
Lf’)
0-
-
_i -
I I I :::J
1;- _t C?__
I
- C r-- 50 (’l
Q1
.
’’-?
-+-+-
-
I ]8
I~ ~
~ I
-p
~~~ ~
0- Q.)
{ -..0
I J --.r- ooo~
I
i .
~~ Cl/,~C’~
CN...c .,j.S!l’
’\s .>
Oxot-.Vl 0
Vl...:t~ c,
X ..00 oU o’
,
10) 0 Qc-~ ~I
- -
4:- o._;..C 0’- .D
o I
o i
-:t ~
\ l~’2
’
’-D
lot 2
lot 1 ;:::
lot 4 ro\lln
352 sq m
ra
date
Qugu st ’2017
si te plan project AO
1 : ’200
1101
rpd
lot 1 cl ient drawing no
on GTP 1450 for ~s house
d T tlo,ns ,an d a\{terations
01
tad
o t 1 ml ttt street
nao sa head s
Page 12
uv 6000 U L> reVISions
~~~~ 90 ~~-n~
-ro !E;~,ts’l1~<o ~ ~~’N~’~
I,I~’ ~~o:::r ~ .
~~U~4ts ~ "~-r=:-.u. ~
N~ ~,,._\G::. ,0’
~~~ o
~~\O~,
a.
I
II
0
o
""
0
(J"\ 0
rn -.::t
"-\ . l~~,
~"1.ll> W"’4,.J_~
~I,..:t erc.., ,
~11f..l(Q \’\<;:..
o ANt> wNJ....R?
~t9L’
r--
,0~~,
~,,(OG~,
~~~~WAU- GW8 R~le
~q-\ ~p~~. ~\~,;..\G,
’N’~.
~ ~Lb~
~~~lL.~ ~ e~
q__
LGW w~~!~.~ ]8
II ~e=~;t~~
-p
~ -s
cr
1/)..00
~
~
__., co <QJ -D
L.n
I ~, ^
~ .
-at-’-’~
OXdt-gJ
~
a.’doC -D
~...c
.,.;t.91’
0
o V)...:t-o C1
...0 ..D ..0 ..0 ,X.o otJ o d.
’<;11 0Q t- ~ I/)
.~ Q._;..C 0<- ..0
~~(g,~A
~Acc~~~~ \.9)(\.-;,Ll~ --?~’\
LC:A:\e q..J ~-to ;tI~.JSrtCt~,
~~l~’1i~ M..:b
N~~Of~~~. ~u:>~
N’9N~
U\J&; or:--.Q;~~ ~.q,l-\Cm~ ,
~~~~
WALL wm-\ ~
~ qtLL ~~~~\
N~, ~t:>
,
u -e,~ .
dra’An
LJ~~~~ _.
" I
f- ~-
~WALL ~ L.l~ ro
~.
eQ’t..t> ~\ O~,~ 80~1’ }1?OU
6001 /190 date
-eo ~tT ’Nrrt--\ ~ 2017
august
first floor ’51~ L’~L,. ground floor "
.
project AO
ptan ptan 1101
1 : 100 1: 100
a a 1>
cl ient druwing no
forbes house
, ,
addi bans and ai(terations
02
tot 1 mitti street
noosa heads
[OCR of page images]
. u I"
LINE OF RODE Ne .
relies |
a,
2
first floor
plan
1: 100
ab
“toyicien 6000 «(Ul ee f. revisions
nage = 90 —_ RM ACE ats
jo =< NIG STNG
oar wget hy» — Been
PUEMONES EXI*STIRCS 2070 CIS TE
TIMEER Sea Al 90 EXTeEnsion .
ARE Pebeck esStTR= 2
DALE beskusy go
NEW. BALOSTRARS 0 JL Ld
TS FOWL PERIMETER . 1 ae 1] AT HH
Reyes — 1 ki | WY
EWE ata | ee
Bet A> BRHINY . TATA LEAL LT) om | oa OK! ne
Cy ~ i Mt iI ae b Pryor ae
Net see oe lo Hl hak F IN” ETS
r Zé un 7
1/ SHWE TO. REMAIN
Rinne 204 Cr Ce ee
’ /al 2 ero) eule New 3
/- dn RI 2) 3) WERE ce . 6S
/ J | = PAR Ske oo se
/ (lly | WALL «GS BO)
f wT Ie “ =e E
ANG. Soke
2070 A wazgs 8
7a —2 Bye) 2
| O §e885 3
cone eacoc oa
WALLS,
f 4
800) 1200) 4.
600 an
ground floor
Y a
drawn
ro
date
— augu st 2012
p lan | - no
1: 100 al>
~ client drawing no
forbes house
additions and alterations
lot 1 mitti street
noosa heads
02
Page 13
,..
01> uv reYISlons
(~~’!J"~. ~\
800, 4160 ~~~.
200
900 4250
~~.
1- ------
\...(~~~
~.~
~~
I
.
~
,
( ~~,
t t
J’"
J’
,
t
~~~e~
I
~~.’
o
o
o
o
a-
I ~~~lf.-.
~ "TD C?~t..Ace
~o;
.
~! t. ~ I
4- ’. .
--:1,
~
,
<:<
-
~~~~\~~~ l
~’--’T’
.
~
;. >
I
car lk .
rRc~\~ ~
o
F=
P
e-
j. pari I o
..-
U1--.’le OF ~:sI1~
~~7~\(cb~.
rn rn
~t ~ .
’L.t::>f~ u1-.l~
a-\c~ ~~,\~
~-,<,l:::cx:>
~’t~
~~-r/
,
11 ::J
.,1 q.,.
.
E--
~-rClt\ C .~ 00
S ’~.;r
l~~a.7~
\
C1’I
.~ ~ ](0
u’"
-p cr
~
~~ ~ \/)..00
JY 1"- "00 co (
’
~
a- r~’(o (’<a
~(’J 0.’,0’ c
’
Ln
~. CJ N ..c .,.:t. ~ .
Oxor-~ 0
c,
o I./)....:t-o
..a ..Cl ...c:l X..o 0U"1 0 0:
:QJ 0 ~
bed 4 ~ q.,
t-
0 ’-
I./)
...n
o ~c~~’i
$
...s o ~~Nb
,
<: "1b ~tf ’
I<’)O~\~V
a.~ 810 3840
c:.(!)~
=t= ~
TON~.,
~ ~,t-Co
~~ 90 19
900
.
6380
~’f <SJ.Ae,
~~ 1000H ’a~’
AWN~,
~11
To~ ,
ta’vln
ro
’
l~~IO
~.A.-~~
~’:s-r$. dote
(’I\U.}~O~~~1’b
WfiPtA~
c:::f-...\ t;~A~
~~~~~.
august 2012
-r~ t.-T~-r:~OK\ {ower ground
.
L.I ~ O’F\~
roof plan ~’( ~f’J,’JJ~
~-r~ -c-o ~U- project no
~ W,.4:!..J._ floor p10n ~(.>t~. ,
1 :100 10 ~A\l._. -
~~.
1 : 100
1101
at> 01> client drawing no
(JiJc..~~ 5~~4J --4,0’ <..) M_’ forbes house
rL~.~
ad d i tions an d a1(terations
03
lot 1 mitti street
noosa heads
[OCR of page images]
a\> / ‘ UL revisions
ae BALE gout
800. 1750 4160 oN eeskt MT EANZ . U | [2955 | 2025 | |W
‘A 4 7}
900 90 475 go 4,250 190 Sete Cit 200 (1000 = 1000 200 10001 = “11200 a
le |e PROFILE AMS . :
90 190 dy 1 PNA =
Se —— 1 Uke oF Deck ba pane:
_ mde Sree, — - 7
4 4
S %, | OS re | . 2
—_ f \ \ iv 4 Ss
4, l x BX TING PARRA REST vo / 2 ;
ke %, is Shay _ i —“e y Oo mp oils ws i pom -- S|
| < LENS Sh nei : nc —
2) a) San pore 7 anne 3 BEAMS / OTTRICIERS .
<— hs
P| om| (GW a BON oe 600 % BOO
| a, \ BROWN) KATE INET . ee /
at yl ROS eT 3
g2 @f| me £2!
Dio | Aaiwnis
al = 7) Eee ES OR & -z -
a FLPERr “TO Su eSe
A GW ROE . gx2 ZH
eects = OO x ot 4
g #2258
S| mle DobKion TRAY SEEN
S 8 (LW FUSE ALD
se r CAT TO SOIT.
—\ as biz Ko
a Phen
D WELL cf
19° i wade B10 er ; .
BLOCK \Tek. Ecoytek.
& ee 907196 ene ante. drawn
900 | ro
pt date
PuGesees Ze 1
Wet Ate
CH GAM ~ANieer
Betas sper ground
Tener - 1190
alp
FLOOR, ARE b Cie SIC ET AIRE) AO KK!
| bsano 65677 (c) 2011
august 2012
plan ANTEX AWNING To
XL project no
| a 101
Q|D cient drawing no
forbes house
additions and alterations
lot 1 mitti street
noosa heads
03
Page 14
,..
revIsions
<. ,
(R.\lr~K ~c..o-r~K’ ~~
~r\1...JeP ~~
(!:’OQP~~
~~.
:\ .-
N~
o U~", ~’><~~ ~~G-r0~
-::t
-::t ~"To~~ 6~
t*,......,C.lA-et>
f’I
_
.
(’-I o~l~< .’
:f\
--
:\ .
~ 1-.\WJ A’Ni---lt ~ To ~=>p~ .
~--
Lf1
rn
-D
(’-I
I
,
,
,
.
.r
~ ,,’-lll
~~-
...
-.
-"
d
.
~~
U
rn
...0 ~~G:.~~~
(""-..! L.>lt--J~ .
::J
q~
c: E’"
c-- 00
’"
0- en ’-!
’
m
U
~’N~ west elevation ( ’t~ ~ ]9
\NM-J- ~
..1
~ ~c.o-rEl<.’ ~ -p ’CT
~
~c>o-r’;~7’ s’-(~. f:::
IJ
~I\
~ I/)
....0
0
~
P7~W~ ’ 1’"’rA’"1~ .
JY r- -00 co <Q; -D
Lf1
~C’l 0.’_~ C -D
’
rz.co o.(~ \0 ~
0-
L.\ ~e ~ ~~ ON.r:::. .,.:t.~.
c’l~~.
~. _.....\/
,
OXdt-~ 0
f’ ~~~COf "r-:r ,
o V)...:t-o
,><..0 0If’l 0 d
C1
"
,1, /.J _ ’.. I:- ~... .-# .~ IQ,I 0QC- ~ V)
..
~- 4- ~ O,- ..0
r--
--~.~. ~ ~--
~I (
~
"
l -I-:-
i r
o
-::t
-::t
/~ J__]!
o.
F01
(’-I
,I’ / I’-~
- ~
I I
-
N~~~~
ffl vl,....,~ c’f’e1i!!. ~ ~ctJ7
,
../.t. _..~
.
r-
-?-~. ----- -_---
,
_.. __
...
-
, . ._.
_.. .
F --~
:1
"
-/’~ I=-=-~’ t-I ) -@
LI) ~. I! .:.---’~
’rn /
..t:J) I . F= praVln
----B
r
~ .
.
jfl JI
l r ~ =
ro
~ ---,! .
IL date
r<
~~1f ~. ctJ M
cI ’- -,
Lf1
~f="~
.
I-
~~-r~~\.’ august 2012
q:- eu:x.K
-
rn
..0 ~,~~ \ o
C’-I ___
I G01 project AO
.-...,_,......-. ---
19ft" /1’
..’
--
1101
,.
cp I ,l"-
....
- "’" -_ .. .1-
~ ~
~I ~.
I’ -.,.
cl ient drawing no
0-
CR
~lqrll-l&
I east elevation
/f’.
~~~~~ forbes house
Cc{ZO<.J~ \.,..,~~~ .
1:100
\
\_...(~~ ,
-r ~’(f~’\ ~
additions and dtterations
04
tot 1 mitti street
nOOSQ heads
[OCR of page images]
. » ertex ecomtex” COE —
PROFIVEP KY
. New Uprtet. ly |Z Wy
S St UE 4A AY WAG EXISTING STRICURS
2 SSR /| LA AL | » SEY RarteRes®
‘ 4 AA ot =
1 | 74 ae = Y a ——_ new! JANN > EMISTINN .
if G01 AFT A 1 Za CATE To ena
: UU
afl / A | lf He uh ="
ae
ay it it th 4 tT
x ro - 4 Sten ASTIN GROUNTS
flo 7a | |
Bn oS
a Brock 7 5
TAIKIINIC
RIPE west elevation etper. ccoren! Rec
BROWN DASNEP . =
Lines ° 1 ZOO NERPANG To corer
Ye oe rast a | SRY
J AW ye —y-— 7 +
é| ee Pelee ——_————
f/f sat
3 CA “= FD4
“ 7 7 Nel oe eX4SrINiG
fl |_AML | 7 ——————— LINES Neer Ss). For
! LAA An ee
B ia / ; y
ws , = ra ;
il 7 J Gw9)
ms Ne er! } = ~ pee ea rr acco
: STAVE. .
ee Exeoye> | ] ee ese ~~
g eae A
gt) WR | a GD!
cpl aa ae
R
LETC east elevation EXISTING cone
GEOUKID Lines. 4:100
cits At TRIVENYAN Soe
feviSions
sa heads q 4567
07 54749 [email protected]
rex oakley design
po box “ 9
p
NOO:
NX
drawn
ro
date
project no
1101
bsano 65677 (€) 2071
*
— augu st 201?
client
forbes house
additions and alterations
lot 1 mitti street
noosa heads
drawing no
04
Page 15
"...
~ .- .
7~h~P
A -
Cl$~\~~ :To
~’F ~-
-
-:rA\lfo
~
’~~ec...c.,..~ \ ~Ad-J~ ’<:..l-\- reYISlons
,-
fitCb~If..-j( ,&.., ’t.,o P
.
M’’’’::’’~ .
.
I ,
’i’-
.t ~~
.
~~d~~~~~~
~:t~&4\?:2_
:1
-
tT17- ~- .
o
-:r
-:r
C"-.I
W~~~
P~N
\o.N~. .
1/1 / ~f\l.Jet> ~
~~~~~.
~~!O\Sf~~.
:fl I
/J1 13~-tb ~ ~~T~
1Ofd IFJ-u.... ,C:>l.,
.
_ _ __
1. ~
:1
_ -_-_ t< ~ e1>’\1>,,~ .
’1-tf....)\~G:, -ro Sr
L.f’l
s:se {;Ac\L . .
~
a.
.
C’I
I~ I
~fl RL 18.00 4’-
(I
L/
en :
...0 I ~~ 7~ 1;’Oi5f ~~ 4
C"I
gfl ~~~ ,~ ~\)~O U t--.lt
;:)
q~
C E~
0-
m
r-- oC)
’"
O"l ’-D L!
Lf"I
south eteVQ tion ~~Et>~~4~. .~ ~ ]8
~~,~ ~t> U~\:S.. -p CT
~
f:::
~~c..~ ~ \I)
...0
0
JY .r--""00’ co <QJ ...0
(’4 L
~(’.I
1=tA~ ,t:) ~r W4Jj._~
/ .
Q.’,O’ C ...0
dC’lL .,.;:t.2""
I
OXClf--~ 0
c,
..~. .-., o In.....:t-u
:.!’. ~
’"t
~-::--
-
-
X...o oLf1o a’
IQI 0 r- ~ In
I o._,_C ~ t- ..0
c! ..
~ ~.i.~~~~~
-.:t
C"-.I
~\Q.\~.
:fl ~~~r~~\..
o
o
o
0 r--
Lf’)
m
0 0’11{~. c.Q,
~l~MJ.~l\:;)N’. p"....)\<\-\t5.~ ........-...... I~
’-D ’-D
~. c:P
~ ~,~-/ ...
drQ’vIn
.4
,",\0 ~’^ ~~-r~ .
gfl ,
ro
cl
date
.......
-
~
Lf"l I august 2012
ro
...0
.~
,~, pro-ject no
gft" ~, 1101
cl ient druwing no
~~--?~13 ]
0"-
m
L.
~~N~.
~orth elevation forbes house
05
1:100
~foJG:, ~~~ ad d j tions an d oJterations
l.-\-,.J6’
.
tot 1 mitti street
noosa heads
[OCR of page images]
NOCH ROE SSR ANS |
—— EBB be OMAL Che
WE at 2 ZP EBL ARINIAAUAA -
FW!
Ep Hiren ic oo , Fox ok SOS RE
‘ Ye y | a : f 7 aT Se — en CE ~.. CE ——— —
g Beye J 4 | K lIA FROMUEr Foor BEANS /OTTRICCERS |
re. Sones { | NEY RKO ATR .
, Sarena REPLACE, EXtS TI WG
- = Sai eee AL GAZES BS METI |
apse I Gn)
| Seabee | |
“ oT wt REMONE EXITING STUD WALL NEILL
jfl | RL 18.00 ve |) 7 NCR ve Bae near EAC cere ate Te
Yee to iy BN x
cl 7 a {fi “ XY [OR PECK AR EROOSTRADE EXIENSICN . iz
al @j SSE ot | ea MN @ 8
mn ee b> e Ai 8
2 Lin) or a T= st A >< af S NEAL ho PosT ANT POOTIG . ©
afl aera nie RL — wl >< 4 ma EXISTING GEOOND UNE
pa = Se ee |
Fath ecto
south elevation \ (cw
ERNST Teeerere
RELOCRTED CRO BRACING .
NETURAL GROUND Line.
FUASA “1 Rook / wats .
reece BK Hoes ahah)
STEN Ree TP DSTA
|| Bonny
PONDER, coer Nate
Rs pants MUI MEOW S
AS Bo SXKRETINGS .
= 2635
fevisions
heads q 4567
0754749286
[email protected]
o box 227
e
noosa
bsano 65677 (c) 2011
Trex oakley design
NX
x
)
drawn
ro
date
august 201?
project no
1101
client
forbes house
additions and alterations
lot 1 mitti street
noosa heads
539
north elevation
1:100
sk
SSSar ve
CLOW
ties
_— *
drawing no
05
Used in these records
Request to Change Existing approval - Extension to Existing Building - 51901.1767.01Related documentApplication case desk ↗
About this file
- File size
- 13.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.