Council archive · source document
000A88A4.126.tif · 132003.221037
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-22 14:20.
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-27 01:48.
¢ » Cardne Y DBR Rainwater Tank System It is intended that the majority of the water demand will be met via a system of individual rainwater tanks at the eco-cabins and a main rainwater tank at the lodge/interpretive centre. It is proposed that “topping” of these tanks will be carried out using groundwater that will be extracted from the existing sub-artesian bore. Section 6.2 details the results of the availability and quality of the groundwater following testing works carried out on site by Coffey Water Studies. It is proposed that groundwater extracted from the bore will be treated and pumped to a storage tank adjacent to the watch-tower (i.e. the highest area available on site). An additional groundwater storage tank will be constructed on the western area to service the lodge, interpretive centre and other facilities. Figure 5 provides an illustration of the preliminary location for these tanks. A water reticulation system will be constructed to allow for the gravity supply (topping up) of the proposed rainwater tanks. Figure 5. provides an indication of the proposed water reticulation system. A preliminary analysis of the expecied amount of rainwater that could be collected was carried out. Table 6.1.1 provides indicative daily average collection amount, which has been determined using traditional calculation methods based on the following parameters. 1. Average roof area of each eco-cabin — 100 m*. 2. Roof area of lodge accommodation, interpretive centre, café and other facilities — 5,000 2 . m*. 3. Average annual rainfall — 1,689mm (refer Table 4.3.1). 4, Rainwaier tank capacity ~ 22,500 litres (standard rainwater tank). 5. Probability of failure — this refers to the percentage of days that the rainwater yield will not be met. Table 6.1.1 — Indicative Daily Average Rainwater Collection ; Eco-Cabins 257 220 "194 177 Lodge, interpretive Centre 43500 44000 9700 8850 and Café. From the above table, 100% of average day water demand cannot be met with the supply of rainwater alone. However it is intended that the storage capacity of the proposed rainwater tanks will provide a higher rainwater supply capability and thereby minimise the dependency on groundwater extraction. It should be noted that the level of groundwater extraction that can be achieved is able to deliver average day water demand. This indicates that under a worst case scenario of severe drought and minimal Tfainwater collection, the groundwater bore will be able to deliver average day demands. An optimal combination of rainwater and groundwater supply will be devised through the development of a dynamic water network analysis model. This analysis will be carried out during - the detailed design phase. This analysis will ensure that the maximum potential yield from rainwater is achieved, thereby minimising the impact/dependency on groundwater extraction. PETRAC LAND HOLDINGS P/L Noosa North Shore Eco-Tourism Portal September 2003 L:A7296-03\Repori\FINAL REPORT ~ 18Sept03.doc Commercial in Confidence Page 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
000A88A4.126.tifRelated documentApplication case desk ↗
About this file
- File size
- 94 KB (small file)
- File type
- TIF
No other editions are linked here.