Original source · versioned page text
RFI (rec. 5.06.26) 2567 - Appendix A - Civil Engineering Drawings
Original PDF page 5, section 2. The text section number identifies this passage in the reader.
> .5
/
> 1.4%
SW
> > 1.4% 3
/
> > > 12
/
>
OOHH
>
/
SW >
RL124.00+
/
>
+RL124.45 +RL124.45 5.4% 0 INSTALL TEMPORARY 900x900 FIELD INLET
/
+RL124.45 +RL124.45 4.0
>
+RL124.45 +RL124.45 +RL124.45
/
+RL124.45
/
+RL124.33 124.40 2
>
OOHH
>
1 AND DN375 PIPE AS PART OF STAGE 4 TO
RL
SW
124.40 124 /
/
+
/
.30
SW
>
/
7.2%
124.40 124.30
>
DIRECT MAJOR FLOWS TO BASIN.
9%
124.3 124.30
%
OOHH
/
3.68
/
4.8%
12 4.1 0
0
1.6
+RL12
/
4.4%
2.9%
4.2
SW
/
4.0 0
12
124.2
>
/
SW
/
OOHH
/
>
+RL123.50 0
/
124.20
0
12
30
/
SW
SW
124. 124.30 2.5% 0
3.9 0
/
H0.9+ +TW124.40
/
/
2.9%
SW
12 23.8 0.68
OOHH
INSTALL TEMPORARY 900x900 FIELD INLET AS PART
/
1.7%
>
1.3%
124.1 124.10 12
/
1.0%
>
4/.2 / 1 123.37 0
9%
0 SW
.38
/
/
/ L2 6 OF STAGE 1 TO DIRECT MAJOR FLOWS TO BASIN.
/
0
RL124
124.20 / 124.
+ 1 123. 3.50
/
R
/
1.0% / /
SW
0 +RL1
OOHH
/ + 3.1
/
/ 20
SW
/
>
124.00 +RL124.00 +RL123.90124.00 / / /
SW
2 2 3.20
10%
12 3.40
/
+RL124.18 / +RL124.23
/
+RL124.05 +RL124.08 / 1
>
0
/
+RL124.13 RL
/
/
4.1
/
SW SW SW SW SW SW SW SW SW SW 12 .30
/
SW SW .00 SW SW SW SW .00 SW SW / SW SW
OOHH
124
12
24 +RL124.28 123 3.20
/
+RL123.85 1.0% 1 1.0%
/
1.0% 124.2 / 1.0%
/
1.0% / / /
>
1.0% / /
0
0 0 See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.