RFI - Attachment E - SWMP Callaghan and Toth
Callaghan & Toth
4.0 WATER QUALITY MANAGEMENT PLAN
4.1 Background Lower Mill Site Stormwater Management
The Lower Mill site was developed by Council in 2005 and resulted in the creation of industrial
lots and community use lots.
The lot reconfiguration involved a stormwater management plan and MUSIC model which
included the new industrial lots i.e. Lots 3, 4 & 6 SP173771, Lot 15 SP301607, new part
industrial/part community use Lot 5 SP213104, community use Lot 7 SP173771 and Lot 2
RP47020.
MUSIC version 2.01 was used to determine suitable treatment nodes for the development and
the model determined the following treatment system:
1. GPTs in each gully pit.
2. Grass Swales will treat stormwater runoff from roads, carparks and footpaths.
3. Bio-Retention Systems – one adjacent the bridge on Mary River Road and one in an
easement in Lot 7.
The Isolated Bio-Retention Basin designed to have an extended detention depth
of 0.4m and consist of a 0.8m deep sandy loam layer underlaid with a 0.2m deep
coarse sand layer.
The Bio-Retention Pods adjacent roads and carparks designed to have a
maximum extended detention depth of 0.3m and consist of a 0.3m deep sandy
loam layer underlaid with a 0.25m deep coarse sand layer.
In addition to this original development, Lot 5 SP213104 was developed in 2006 with the
addition of the Cooroy Camphor Laurel Club shed and associated carparking. A MUSIC model
was prepared for this proposed development and it was determined that the roofwater would be
treated by a rainwater tank which would flow to a bioretention basin BB3 (S.A. = 12m2) which
would also treat the carpark areas. It has been noted during site inspections that this rainwater
tank and bioretention basin have not been installed.
4.2 Proposed On-Site Stormwater Treatment Process
The site i.e. Lot 5 and Lot 7 showing the new works was divided into MUSIC model sub-
catchments as shown on Plan No. 2001-01 Revision B. The previously developed site i.e. the
lot reconfiguration that developed the industrial lots, have also been included in this MUSIC
model. These catchments have been modelled as per the original MUSIC model and the
proposed treatment train for those catchments have not been altered, as it is considered that
these works were completed as per that design and approval conditions.
The new hardstand areas will be mostly diverted to the existing treatment systems, particularly
the biobasin (Biobasin 1 – BB1) located on Lot 7 SP173771.
The proposed treatment train for the new hardstand areas for the site is also illustrated on Plan
No. 2001-01 and Fig 4.1 (MUSIC model layout) and listed below:
1. Existing Grass Swales (Swale 1 and 4) – Swale 1 to treat overland flow from the carpark
adjacent the buildings (on Lot 5) prior to flowing into one of the new grass swales which
directs the flow to the biobasin. Swale 1 will be reinstated during works and is 60m long
and 4.2m wide, with 1 in 4 batters. Swale 4 will remain as is and will treat flows from the
10
2001 Lower Mill Carpark Extension SWMP July 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - Attachment E - SWMP Callaghan and Toth.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.