Original source · versioned page text
RFI - Attachment E - SWMP Callaghan and Toth
Callaghan & Toth
3.2 Proposed Works
The overall proposal is to improve the public carparking on the site and to provide for future
parking for other adjacent community uses to the south of Cooroy Creek i.e. the library and the
proposed new Cooroy Hinterland Playground. The works involve:
Providing 47 new carparks (area to remain grassed and gravel) and sealed driveway
access in an area of informal carparking (gravel and grassed area) during events in
the area (on Lot 5),
Formalising existing sealed/gravelled areas into 22 new carparks (on Lot 5),
Retaining and shaping of existing turfed swale drain (on Lot 5),
Construction of one new grass swale to divert new carpark flows to the existing
biobasin (on Lot 7),
Sealing existing gravel driveway areas to a concrete driveway standard,
New sections of concrete pathway adjacent to the new carparks and connecting to
existing pathways;
Associated landscaping.
As a result of these works, new stormwater drainage and surface drainage treatment devices
are required. These new drainage systems are required to conform to Council’s Water Sensitive
Design Code and meet the Stormwater Management Design Objectives for stormwater quality
of the State Planning Policy. The existing biobasins will be refurbished, one existing grass
swale reshaped and one new grass swale will be constructed.
Refer to Plan 2001-01 Revision B which shows the stormwater quality management layout
proposed for the site.
8
2001 Lower Mill Carpark Extension SWMP July 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - Attachment E - SWMP Callaghan and Toth.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.