Original source · versioned page text
Plan for approval
Attached to the e-mail SARA Response with conditions - MCU18/0158.
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn dge of Bitumen
Low Fence Brk Pillars & Picket infills
Carparking
Edge of Bitumen
no. date amendments
Sewer line??
Concrete Footpath
Overhead Power
Water Main
Stormwater
Table Drain
proposed easement
108.401
13,800 3,000 600 4,800 shown hatched; 864.25sqm
th
under pa
SL108.3 106.96
fd
fence
2,000 190 5,910 190 SM3 Kerb
M/H 9not
OPAL STREET
9,010
OP 109.193
109.219
SWMH IL
59
108.815
Cnr Brk
2
108.947
108.719
108.685
Sewer60
10
Possibly
171°59' 50.287
SM26
IL107.34
OP
cleaner 9
Telstra Pit
GINail in
109.215
Conc lid pit
3
SW Catch
RC00
450 RCP
600
Bit
wc M P
existing boundary line
loading exit
3,810
garages
190
bay MRV
7,050
108.482
garage 8.8 x 2.5
1,510
6,600
note:
Water
6,000
Bitumen
Meter
entry/exit F
for units over
easement for access
entry
3,000
1 & services.
B3 Kerb
Table Drain
to future detail
100
DIAMOND LANE
108.272
bin wash &
1100L bulk bins st stairs to
units over lobby 22 24
awning over
roller bin room Conc
26
4,800
grille 84 ? Path
29
6,310
2 52ine?
M r-l
108.716
SGewe
S
2,600
wc
shop 1
Invert
Concrete Carpark
for Mobile Library
47Existing bus stop (boarding point, hardstand and access,
Kerb Lip
refuse m2
108.406 Formed
proposed subdivision line
truck shop 3 wc
108.360
100
6,000
77 m2 5,400 21 tactile ground surface indicators and J-pole) to be retained
loading
area unisex facility
16,410
190
and not relocated. The bus stop must not be impacted on
108.713
2,000 13,610 3,000 600 4,800 6,600 4,800 682 14,000
SITE AREA: 2014 SQM
by any landscaping, infrastructure, buildings and structures,
low kerb
LRV
car overhangs
262°01'
12.5x 2.5
GROSS FLOOR AREA: and2 the like, including the proposed awning.
shop
garden
green wall
6,000
77 m2 shop 4 140 m2
109.700
saddlery
driveway
40,190
SHOPS: 640sqm
108.787
108.516
9,800
Valves
25
Stop
3,500 300
1,000
'no entry'
SM3 Kerb
UNITS: 2 x 2 bedroom (90sqm ea) 18
36.190
sign
108.559
FL 109.0
awning over
82°0'50"
setdown
2,400
100
area bollard
CAR SPACES: LOT 5 8
2,500
108.599
77 m2 shop 5 scooters
109.900
SHOPS: 32 required (1/20 ) 674.9sqm
Concrete Slab
LOT 4
108.861
31 provided inc 8 scooters (2 cars credit) 986sqm LOT 6 proposed subdivision line
exit
'no entry'
8,213
3,000
1,200 sign
353.7sqm
40.213
Phone
new
Box
108.671
UNITS: 2 cars (garages). landscaping
existing boundary See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 1 section
Section 2
line
M1 K
110
109.923
16 17
2,400
erb
n
remove kerb
109.231
77 m2 shop 6
109.862
15 unisex facility
SubStatio
LANDSCAPING REQUIREMENT: 10%; 201.4sqm
low kerb
SL108.9 107.25
Elec
108.917
shop 8
IL107.42
109.935
212.75sqm provided
SWMH IL
Power
7
109.893
9.901
Conc Lid pit
coffee
Pole
SW Catch
low kerb
23 m2
new kerb & channel 10
wc
300RCP
109.014
109.053
109.081
No Stand
8,540
109.097
shop 7 91
450 RCP
6
Bitumen
No42712 le
shop 7 5.
Power po
ge
77 m2 12 13 florist
0'
g na
SGM2528428
Sewer-line??
0
si
45 m2 7°
1,500
Ramp
109.523
Pram
2,000
109.523 9
109.492
109.263
109.921
30
109.51
FL 110.0 FL 109.5 9
Water Main
109.273
new footpath
10
46.262 351°59'
06m
o7726
Water Main
Sign t
Path
Concrete
Stree
awning over
& Light Nole
09.8
solid yellow line marking
No Stand
PathRL1 l in
ign
Power P
'no stopping-no parking'
TBM Nai
Street S
Refuge
The existing bin is to be
o58467
new footpath
Elect
rb
Bus
Ke
Pit
Concrete Crossover
M1
& Light Nole
IL108.00
relocated
Sign
repositioned to the south of the
Power P
110 bus stop
Conc lid pit
M1 Kerb
Target on
B1 Kerb
SW Catch
sed
tactile ground surface indicators.
Pole
Not Acces
2,127 13,800 20,400 10,040
The detailed positioning of the
ELM STREET
SWMH
Position Indicative Only
relocated bin is to be agreed with
Overhead Power
Existing bus shelter to be the Department of Transport and
Existing line marked bus
repositioned to the north of the Main Roads (TransLink Division).
site plan/ zone to be retained and
Note - Sewer Line not located by
Plotted from Unity Water Records
0 2000 5000 10000 20000 awning. The detailed positioning
not relocated.
scale 1:200 ground floor plan of the relocated shelter is to be
agreed with the Department of
Transport and Main Roads
Lots 4 - 6 on RP72698 (Translink Division).
34 Elm Street
survey
Cooroy
Client Location Drawing Scale Drawn
KEXRON PTY LTD SITE PLAN/ 1:200 @ A2 AM
34 ELM STREET GROUND FLOOR PLAN
62 hilton terrace Project COOROY Drawing no. Page Date
noosaville (07) 5449 9066 PROPOSED COMMERCIAL DA-16.0518.2 2 0F 4 JULY 2018
[email protected] QBSA reg. 65073 DEVELOPMENT