Council archive · source document
09/0152 - MCU - Mulitple Housing Type 1 - Relative or Employee [As Published] · 132009.152
This checklist should be used for any IDAS application. Please check each of the following items before accepting an application at the counter. REFERS 1. sunshine Coast Checklist - Applications Envelving Land / Regional Council —— PEE aN FILE ou] Development & Land Use Sections REFERS IDAS APPLICATION APPLICATION FORMS 1.1. Form PartA 1.1.1. Ensure that the form is fully completed and is a current version. 1.1.2 in the case of an MCU or Op Works below the high-water mark, owner’s consent is required. 1.1.2.1 If there are multiple owners, the consent of each owner is required. 4.1.2.2 If the owner of the land is a company, either ACN No, Company name clearly indicated by signatory) or Company Seal required. 1.2. Form1 Part B-R Supporting Information 1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-R are attached. 1.1.2.1. Ensure that each of Forms B-R which are attached are fully completed. IDAS ASSESSMENT CHECKLIST * 2.1 Ensure that relevant sections have been checked and/or completed with regard to referrals 2.2 Ensure correct parts of Form 4 are provided where required (ie most common are Part J for Clearing Vegetation, Part N for Contaminated land and Part P for Prescribed Tidal Works) ga ENVIRONMENTALLY RELEVANT ACTIVITIES 3.1. Ensure that Part G is completed if EPA referral is required. 3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application fee is paid and recorded on the application. (Refer Environmental Health for fees) s FORM 2 - REQUEST TO CHANGE APPROVAL 4.1 Ensure that relevant items have been checked and/or completed including information regarding applicant details along with owners consent if not current owner of land as shown on Council records. If over multiple properties on one or more sites, consent of Body Corporate is required. PLANS 5.1. Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational Works) accompany the application. In addition ensure that each set is complete. 5.2 Ensure that 4 of the copies of the Plan of Development is in an A3 or A4 format and is unbound. SUPPORTING INFORMATION 6.1. Ensure that generally at teast 6 copies of any report accompanies the application (5 for Reconfiguration | —— and Operationa! Works). If the application is accompanied by a covering fetter, ensure that it is WX capable of reproduction. —_ 6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. 6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping — FEE 7.1 Ensure that the application fee, as determined from the Council’s adopted scale of fees, . accompanies the application or has been paid. Please DO NOT leave the application at the counter and DO NOT deliver the application to Records. Land Use MCU applications; MCU applications including a Lot reconfiguration; Prescribed Tidal Works; Operational Work if Jetty or if including Landscaping. Land Development Lot Reconfiguration applications and Operational Work not including Landscaping NSC g:\Manduse\administrative processes\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 79 pages
Page 2
YES COMMENT IDAS REFERRAL AGENCIES TRIGGERS (Most frequent referrals) Please tick Please refer to IDAS Checklist for complete list ¥ Department of Main Roads (Concurrence or Advice) * State Controlled Road Dept Natural Resources & Water e <Acidsulphate soils (Advice) tt « Clearing of native vegetation on freehold land (Concurrence) Environmental Protection Agency (Concurrence) * Environmentally Relevant Activity (for non-devolved Council as EPA) « Contaminated land = Environmental Management/Contaminated Land Register © UXO * Land recently used as a ‘notifiable activity’ » Industrial land changed to sensitive uses (eg school) e Coastal related development. « Koala habitat « Wetlands (Advice only) Queensland Transport (Concurrence) . Railway . Public Passenger Transport Energex or other responsible entity (Advice) e Electricity Easements/Substations = | = | DIP (Concurrence) . SEQ Regional plan VARIOUS ‘ ‘ . Conservationestate (Advice) = i is—‘“<i<‘iwi OTHER STATE AGENCIES + TRIGGERS e OWNER’S CONSENT (State Iand) Department of Natural Resources and Mines a For further clarification refer to IDAS Guides prepared by Department of Infrastructure & Planning. NSC g:Vanduse\administrative processes\application checklist.doc
Page 3
Country
Coastal
. Contact Officer: Wayne Baldwin
Certifiers Rect 01/1201
Phone No: (07) 5420 8611
Ref No. 2009/BLDA-00068
3 February 2009
Sunshine Coast Regional Council — Noosa District
PO Box 141
TEWANTIN QLD 4565
Dear Sir / Madam,
Building Approval — Relatives Apartment [Multiple Housing Type 1 — Noosa Plan]
Property Situated at 61 Lake Flat Road, Boreen Point
Described as Lot 5 SP109944
By way of introduction, we are the building certifiers engaged by Australian Independent Builders
to assess and approve the building work for the construction of a Relatives Apartment to be
undertaken on the above mentioned property for the owners Robert & Deborah Hammersley.
e@ The application triggers a Material Change of Use [Code Assessable application] under the
' Noosa Plan — Table 4.6 Assessment Table for the Rural Zone;
Please find enclosed the following supporting documents;
IDAS Form 1 Parts A,D & E
IDAS Assessment Checklist
4 Copies of Plans
Applicant & Owners Authority
Title Search & Registered Plan
Applicable Fee (Credit Card Authority)
Please charge the above fees to:
File Reference: 2009/BLDA-00068
Cardholder's Name: Sunshine Coast Regional Council — Glynis Ronalds
e@ Card #: qq:
Expiry Date: 03/10 Case Type: Visa Security Code 438
Authorised Signature:
ZY. t a
We look forward to hearing from you in the near future should you have any further question or
would like to discuss the matter further, please contact our officer, Mr Wayne Baldwin on (07)
5420 8611 during normal business hours. bo
cep UY bYy al
6(2(01
Yours Faithfully,
“>
Wayne Baldwin
Ground Floor _ Supervising Building Certifier
Nutley Street Entrance
PO Box 117 .
Caloundra Q 4551
Telephone 07 5420 8611 _ o .
Facsimile 075420 8622 - ae Sunshine Coast
Email: [email protected] - _... we oo . Regional Council
website: www.caloundra.qlid.gov.au/cccertifiers:
Page 4
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Form 1 Development Application
Part A
Common details
NOTE: Answer all questions unless directed to go to a particular question. Refer to the end of the form for advice on how to complete this form.
‘Applicant details (The Appicantis the person responsible for making the ‘application ar and need not be the owner of the fand.’. <The Appicantis responsibite: for ensuring. tha
‘information provided on the 1DAS Application Farm is correct. This information is refled Upon by the Assessment Manager and: any referral agencies when assessing and :
I ‘deciding this application.. By lodging this appication, the Appiicant incurs lhe obfigations. and responsibifties prescribed ¥ the IPA. Any. development permit or prekiminary
[approval that may be issued as a consequence of this applcation will be issued to the AppEcant). “Ae, x
Company/organisation name (if applicable) [Country & Coastal Certifiers |
Individual applicant/Contact person (if there is more than one applicant, provide additional applicant details on an attachment to this form)
Postal address [po Box 117 Caloundra Queensland 4551 |
@ Contact telephone number [07 5420 8611 Mobile phone number [ti‘Ss‘s*@S
Facsimile number 07 5420 8622 e-mail address [email protected]
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information i is given fo identify the premises)
Table A If the application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.
[1
OR
TableB Street address for the premises (tick applicable box/es below and insert property description in the table. Identify each lot in a separate row.)
() (C] Street address / lot on plan for the premises (Appropriate for most applications including building applications); OF
(i) (2) Street address ot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g. jetty,
pontoon etc) (Note: Loton plan details may be obtained from title documents, a ‘Rate’ notice, or from the focal govemment.)
@ es Lot off plan.description |. :
« Unit | Street 3 Plan type. and {i
. Nb. | No t | Lt an Nombor|
1 61 LAKE FLAT ROAD BOREEN POINT 5 SP109944 SCRC - Noosa Area
AND/OR
Table Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a lot, in water (e.g. channel dredging in Moreton
Bay) etc.)
Coordinates i | gow aan
tpn to nts pots) 5 Zone. _
a Az Reference | * ;
1 ([] pepags
CO weses
(D) Other -
2. Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one or more of these characteristics - complete only if appfcable)
Page 5
o INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008 Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, fake, cana) Name of water body, watercourse or aquifer (if known) [1 Table E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994 Lot on plan description for strategic port land Port Authority for the lot [1 Table F Complete if the premises are in tidal water Name of local goverment for the tidal area (if applicable) Name of port authority for the tidal area (if applicable) (1 3. indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water) : : Total area of premises 10.98 Cm &) hectares (Tick applicable unit} iExisting use use of the the premises 4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, schoo) sugar cane farming etc.) [1 [Oweting & Ancilary Structures | 5. Are there any ee easements on the premises? (e.g. for vehicular access, electricity, overland flow, water efc.)? O No 2d Yes - Ensure the ‘ype. Jocation and dimensions of each easement are included in plans. Submitted with the application e woe ‘Proposal detai det WS er we 6. Brief description of the proposal (eg 6 unit apartment building, 30 lot residential subdivision, a bore, aquacuiture) Annexed Dwelling Unit (Relatives Apartment) 7. Does the poposal include new buildings or operational work (including any services) on the premises? Ol No X) Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application wie ae “ eee ta rea ' om me 4 ‘Resource entitlement (fapplicable) _- further information fs provided in the advice section at the end of the form 8, Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.) X No - Goto ag Oo Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource allocation or entitlement must be submitted with the application. You do not need fo answer Q9 - “9 to the next section, iOwner's consent (if. applicable) | - further information is provided in the advice section at the end of the form, ou _ i 9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high- -water mark and not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment to this form if applicable. Premises Owner's name/s Details of the premises owned . . Date consent Table H and postal address (street address or lot on plan description) Owner's signature’ was obtained 1 Robert & Debra Hammersley | 61 Lake Flat Road Boreen Point 28/01/2009 * Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 af the Corporations Act 2001 (Cwealth) details how a company may sign as owner. Templates for the provision of owner's consent are available on the IPA website . “attachments and supporting information (Complete Table | - Use a separate row for each type of atachment or information, including information ‘required j “under this Part} Pioase ¢ ensure al af! documentation submitted | with this form, ackuding other Parts of Form 1, oF owner's consent, etc, are securely attached to this Part of the Form. Description of attachment or information Title 6 Method of deli applicable) of delivery to Table | (9g. Part nC i Alilid ale bepsa aceane ; (e.g. General Authority, James Street Traffic Report} Date assessment manager 1 IDAS Form 1 Parts A, D & 03/02/2009 | mail 2 IDAS Assessment Checklist 03/02/2009 | mail
Page 6
ara“
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
3 Owners Consent General Authority 28/01/2009 | mail
4 Title Search Reference 50325498 15/01/2009 | mail
§ Registered Plan $P109944 05/04/2000 | mail
(Portable Long Service-Leave-(PESL) levy (Appicatife for tertain building anit construction work valued over $80,000 only}. eT ee
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: ( Tick box if applicable)
{_] the application seeks a preliminary approval only;
[Bd the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests),
LC all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
C the work is being carried out under an owner-builder permit issued under the Queensiand Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given.
11. Is payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?
EX) No - End of Part A
[1 Yes - Answer Q12 below
@ OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)
Receiving officer's Reference S
Fee ($) Date received name numbers
ATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
oe fe ee ee
1
Privacy Statement
The information collected on Form 1 will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for @ purpose outside of the IDAS process, except where required by legislation (including the Freedom of information Act 1992) or as
required by Parliament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.
Advice for completing Part A
General advice
° Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible
for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The
Assessment Manger may refuse to receive an application that is not properly made.
° The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the
Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only.
Applicant details
. If the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided
under the IPA.
Page 7
LC
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Details of the premises
The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land {whether or not a building or other
Structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.
Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. tnstead complete
Table A.
The premises may be identified in a number of ways —
« Street address and lot on plan are most common and will apply to most applications.
¢ Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other
(specified} datum such as Zone Reference or GS84 may be provided.
The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act.
StrategicPortLandis within a local government area but a local government's planning scheme does not apply onStrategicPortLand.
StrategicPortLandis declared under the Transport infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on
strategic port land) and the Queensland Transport (Ports) website.
“Tidal water is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic
port land is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water
mark at spring tides} establishes the boundary of a tidal area. Land below high water mark is not within a local govemment's area unless
provided for under the Local Government Act 1993. Unless otherwise provided for by legislation, a local government has no jurisdiction below
high water mark, A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection
Agency generally has jurisdiction for a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and
deciding applications for prescribed tidal works within the local govemment tidal area, and the planning scheme may be applied to that
assessment (to the extent provided for in the code for prescribed tidal work).
Resource entitlement
Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a
prescribed State resource. Schedule 10 of the integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-
owned land, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning
Regulation. Section 3.2.1(10}(a)(ii) states an application cannot be taken to be properly made without the required evidence.
For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same
time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made.
For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by
gazette notice under the Transport infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
Evidence may be required from more than one Department responsible for a State-owned resource, é.g. from the Environmental Protection
Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
above high water mark.
Owner's consent
Section 3.2. 1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the
application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined
under the Coastal Protection and Management Act 1995, or work on rail corridor land defined under the Transport Infrastructure Act 1994.
Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during
the processes of the application or in the event of an appeal about the outcome of the application.
“Owner for the purpose of a lodging an iDAS development application means the person at the time of lodging the application, entitled to
teceive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent}.
Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation
may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises.
Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary
ERA.
Portable Long Service Leave (PLSL} Levy
The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building
and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the
scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueensland.
The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry
(Portable Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the
Building and Construction IndustryTrainingLevy.
The Building and Construction industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction work subject to
the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties,
pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.
The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may
be issued.
The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and
Construction Industry Notification and Payment Forms are available from anyQueenstandpost office or agency, on request from QLeave, or can
be completed on the QLeave website at www.gleave.qid.gov.au. For further information contact QLeave (Tel: 1800 803 481 Web:
www. gleave.qid.gov.au }
Page 8
APPLICANT / OWNERS AUTHORITY | / we as owners / applicants agree to the lodgement of all necessary development applications on my / our behalf, and that Country & Coastal Certifiers is authorised to make amendments considered necessary to facilitate this process. | / we as owners / applicants hereby give our authority for an agent of Country & Coastal Certifiers to lodge and sign any council or state government forms necessary for submission for and on behalf of me / us Applicants Name: Address Signature Development Address: Owners Name: Signature Owners Name: Signature Gary Mitchell -— Oakview Constructions Pty Ltd Trading as Australian Independent Builders [ABN 53 082 004 760] PO Box 574 Nambour QLD 4560 1 Lake Flat Road, Boreen Point Lot 5 on SP 109944 Robert Leighton Hammersley Deborah Lee Hammersley Bion
Page 9
INTEGRATED PLANNING ACT 1997 Part D, Version 3.1, 3 March 2008 Form 1 Development Application Part D Material change of use assessable against a planning scheme Planning schemeidentfiction = 1. How is the premises identified / zoned in the applicable planning scheme? (NOTE: if the premises involves mastiple zones clearly identify the relevant zone for each lol) - provide details for each fot on a separate row (ie. stroot Goecinion lon dota Applicable zone /precinct /area Applicable overlays 1 |61 Lake Flat Road Boreen Point Rural Natural Hazards (100yr Flood Lot 5 SP 109944 tnundation Area) Biodiversity - Environmental Protection Natura! Hazards - High Potential ASS Natural Hazards - Bushfire (Medium) e@ ‘Nature of the proposed material change of use (MCU) | 2. How is the proposed use/s defined in the applicable planning scheme? are . | Planning scheme definition (inckxie each | No. of dwelling / [Days & hours of] No. of General _ omnes use definition in a new row of on attached fenancy units operation emptoyees. documentation if eppkcable) (if applicable) | (fapplicable) _| (if applicable) 4 | Relatives Apartment Multiple Housing Type 1 1 na 3. What type of approval is being sought? [X] Development Permit CO Preliminary Approval [1 Both (Provide detaits below) 4. Are there any current approvals associated with this application for the change of use of the premises? (e.g. e Prefminary Approval for the use ) X No O Yes - Provide details for each associated approval on a separate row 5. Does the proposed use involve: (i) the reuse of existing buildings on the premises [KX] No LL Yes - Complete Table A @ (ii) new building work on the premises [No [DX] Yes - Complete Table B (iii) the reuse of other existing operational works on the premises [J] No Co Yes - Complete Table C (iv) new operational work on the premises —X] No L] Yes - Complete Table D Table B | Proposed floor area Proposed site cover (0.0009863% Proposed maximum number of storeys Proposed maximum height above natural ground level 6.9m (scaled)
Page 10
INTEGRATED PLANNING ACT 1997 Mandatory information Part D, Version 3.1, 3 March 2008 6. Confirm that the following mandatory information accompanies this application: Confirmation of lodgement Method of lodgement For all applications (i) Plans showing the nature and location of the proposed use on the premises and a statement about the intensity and scale of the proposed use (e.g. number of employees, days and hours of operation, number of visitors, bx] Confirmed mail number of seats, capacity of storage area) When the application involves reuse of existing buildings (ii) Plans showing the size and location of the buildings to be reused (1) Confirmed Not applicable When the application involves new building work (iii) Plans showing the size and location of the proposed new building work DX] Confiened i mai (1 Not applicable When the application involves reuse of other existing works (iv) Plans showing the nature and location of the works to be reused oO Confirmed BX} Not applicable When the application involves new operational work (v) Plans showing the nature and location of the proposed new operational works Confirmed BJ Not applicable @ OFFICE USE ONLY Date received Reference numbers | Advice for completing Part D General advice je Part A must also be completed for all IDAS development applications. je The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. je When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) for coastal development applications, use the process from the information sheet Electronically paying fees to the Environmental Protection Agency (EPA) and securely attach the form Electronic Funds Transfer (EFT) payment notification to this application. Q3 A development permit authorises development to occur. A preliminary approval is a step in the approval process and does not authorise development to occur - a subsequent application for a development permit must be sought. Table D Ifthe MCU application involves operational work that is the building of a retaining wall on the premises, the application is taken also to be for the operational work if approval for the operational work has not been applied for in this application or in a separate application.
Page 11
INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008
Form 1 Development Application
Part E
Building &/or operational works assessable
against a planning scheme
Nature of the works
1. Nature of work that requires assessment against a planning scheme:
{K] Building work - Complete Table A (JJ Operational work - Complete Table B
Table A
(i) What is the nature of the building work made assessable in the planning scheme?
Relatives Apartment - Multiple Housing Type 1 under Noosa Plan
(ii) Are there any current approvals associated with this application? (e.g. material change of use)
(KX) No (_] Yes - Provide details below
2. What is the dollar value of this operational work? (i.e. the total value including GST, materials and labour) $
‘Mandatory Information /
3. Confirm that the following mandatory information accompanies this application
Confirmation of
lodgement Method of lodgement
Plans, andspecifications if applicable, showing the nature and location of the proposed works (ineluding the 1
lextent of any cut and fil) BX] Confirmed — | mail
OFFICE USE ONLY
Date Received Reference Numbers |
Advice for completing Part E
General advice
¢ Part Amust also be completed for all DAS development applications.
« The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.
at A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur
Page 12
a INTEGRATED PLANNING ACT 1997 Part J, Version 5.1, 3 March 2008 Form 1 Development Application Part J Clearing native vegetation under the Vegetation Management Act 1999 Soh Aspe aaolopmeh tinchided ih GppiGatOn NN SRE O00 Operational work for clearing vegetation made assessable under IPA, schedule 8 0 (ii) Material change of use of premises C1 tii Reconfiguring a lot Pou urnccuuae [X] Development Permit (CD Preliminary approval (1 Both (provide detaits betow) 4
Page 13
INTEGRATED PLANNING ACT 1997 -
ue pnesrs
2. Confirm the following mandatory information accompanies this application.
Part J, Version §.1, 3 March 2008
(i) A Property Vegetation Management Plan including -
a written confirmation that the Department of Natural Resources and Water is satisfied
the proposed clearing is for a relevant purpose under the Vegetation Management
Act 1999, section 22A; or
b. information identifying the relevant purpose under the Vegetation Management Act
1999, section 22A and demonstrating how the proposed clearing is for that purpose
a the location and extent of the area proposed to be cleared;
b. information about the purpose of the cearing;
c details of the way the proposed clearing meets the performance requirements of the
regional vegetation management code for the area; and
d. details of the location and extent of proposed clearing, through either
i. amap showing -
. the boundary of the area on an image base;
. five or more points visible in the image base that corresponds [JConfirmes
to identifiable fixed features;
. the Map Grid of Australia 1994 coordinates and zone
references for each point, acquired by GPS or similar system of
satellites that receives and processes information, and
. a description of the feature that each point represent; or
ii. a description of the boundary of the area by reference to Map Grid of
Australia 1994 coordinates and zone references for the area
(ji) For an application for which the assessment manager Is the local government -written (1) Confirmed
confirmation that the Department of Natural Resources and Water is satisfied the proposed clearing
is for a relevant purpose under the Vegetation Management Act 1999, section 22A (Not applicable
(ii) — For an application for which the assessment manager is the Department of Natural Resources
and Water, either - O Confirmed
oO Not applicable
‘Any material, including plans and maps, which demonstrate how the application meets the relevant
including firebreaks and fire management lines, excavations and stockpiling of soil,
and clearing necessary to maintain proposed infrastructure following its construction
policy and the performance requirements of the relevant code for the area Dx] Confirmed mail
(v) The location and extent of -
a ail infrastructure associated with the development, including proposed building
envelopes and underground or above ground services
b. all proposed lot boundaries 7
c alt proposed roads, easements, vehicle access and parking, and pedestrian access & Confirmed mail
d. any proposed clearing or consequential clearing that will result from the development,
OFFICE USE ONLY
Date Received Reference Numbers
Page 14
INTEGRATED PLANNING ACT 1997 Part J, Version 5.1, 3 March 2008
Advice for completing Part J
General advice
* Part Amust also be completed for all IDAS development applications.
« The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly toa
particular question.
» For further infomation about completing this form go to:
e IDAS Guide 12 (Vegetation clearing) contains information for intending appficants.
+ Vegetation management Department of Natural Resources and Water website contains a comprehensive range of information about the VMA,
including assessment codes and polices. .
« — Landholder’s guide to vegetation clearing applications {from the NRW website) provides information specifically for landholders and
intending applicants.
a1 A development permit authorises development to occur, while a prefiminasy approval is a step in the approval process and does not authorise
development to occur
2(H) and (iit)
. Under the Vegetation Management Act 1999, section 22A, if a development application for vegetation Clearing is not for a relevant
purpose, the application is taken not to be a properly made application and the assessment manager must refuse to receive the
application. Also, the proposed vegetation clearing is only for a relevant purpose if the applicant satisfies the chief executive of the
Oepartment of Natural Resources and Water (NRW) that the development applied for is one of the purposes listed in section 22A.
. If the assessment manager is the loca! goverment, the applicant must obtain confirmation from NRW that the proposed clearing is for
a relevant purpose and provide this with the application. However, if NRW is the assessment manager the applicant has the choice of
either obiaining confirmation before making the application, or providing adequate information for NRW to make the decision on
whether the proposed clearing is for a relevant purpose at the time the application is received. .
Page 15
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkfst, Version 21.3, 9 May 2008
YR ak Development Application
IDAS
Assessment Checklist
(DAS Development Application Form 1 Is the approved form for all development applications under the integrated Planning Act
1997 IPA). Form 1 is made up of various Parts.
Part A (Common details) of Form 1 must be completed for alt applications. The relevance of other Parts of Form 1 depands on
the nature of the application.
RN
Form 1 also includes this IDAS Assessment Checklist, which Is used to assist in determining State assessment and referral
Tequirements, and the Parts of Form 1 relevant to the application.
Section 1 and all other relevant sections of the IDAS Assessment Checklist, as identified in the Table below, must be completed
tor all development applications except those proposed on land In an urban development area, or for building work requiring
assessment against the Buliding Act 1975 only. =
Ry
For more information about development applications on land In an urban development area, refer to www .uldd.gld.gov.au,
For more advice about building applications refer to Part B af the IDAS Application Form. 4 ot
Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. If
unsure, phone or visit your local government or log onto the DIP website www.dip.qld.qov.au for help
For all {DAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this
checklist
Does the application seek approval to materially change the use of the premises? M7 Yes CINo
if yes - complete Section 2 of this chackiist.
Does the application seek approval to reconfigure a lot? CL Yes Mio
i yes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. Assessment is by the local government.
Does the application seek approval to carry out operational work? CO Yes Kio
tt yes - complete Section ¢ of this checklist.
v3
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? OO Yes [efio
if yes - complete Section 5 of this checkilist.
Have you received a referral agency response under section 3.3.2.0f the IPA, in relation to this development D1 Yes | No |
application?
if yes - complete Section 6 of this checklist.
Does the application seek approval to carry out building work requiring assessment against a local government (Wes (CNo
planning scheme?
if yes - completa Form { Part E. Assessment is by the focal government.
Does the application seek approval to carry out building work requiring assessment against the Building Act 1975? C1 Yes Mio
i yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of DAS Application Form 1. Assessment is by a
building certifier.
Page 1
Page 16
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
S ECTI O N 1 Section 1 must be completed for all applications that require completion of the [DAS Assessment Checklist.
HERITAGE =
1.1A | Is apy part of the proposal intended to be carried out on a Queensland Heritage place under the Queensland Heritage Act 1992?
No - Goio001.18 ((] Yes
Ifyes, has an exemption certificate for the proposal’ ' been issued under the Queensland Heritage Act 1992?
C1] Yes (No
IF no, is the proposed work emergency work for the Queensland Heritage Act 1992?
Yes [CNo
Ino, is the work being carried out by the State?
oO Yes O No - (Complete Form 1, Part C\) This application requires assessment by the Environmental Protection Agency (EPA).
JF EPA is not the Assessment Manager for the application, the EPA has jurisdiction as Concurrence Agency.
Dees 2 Fo Suog ts geet
2 PFeguance werk woo om ape Ped PR orton td Dore
PMA arra FL ued
1.1B } Does the proposal involve development, other than development mentioned in the Integrated Planning Act 1997 Schedule 9
{development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered ina
Loodf Heritage Register under Part 11 of the Queensland Heritage Act 1992?
No - Go 10 01.2 (11 Yes - (Complete Form 1, Part C2) This application requires assessment by the relevant local government against the IDAS Code in
the Queensland Herilage Regulation 2003. If the development involves building work and the focal govemment is not the
Assessment Manager for the application, the local government has jurisdiction as Concurrence Agency.
BA schadued ryt t Mabie5 tom 24 schadk 22 Mest 2 14% 5 PRegulaton. schodiwe fable t tor tA PY sector 19 Apts tons or eens ugad ne cement
Queens.ara He tage Rage ator “03 screauie ? DAS Yer
REMOVING QUARRY MATERIAL; WILD RIVER AREA . .
1.2 | DoesAfe proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
ero Goats (] Yes
ifyes, is an allocation notice required under the Water Act 2000?
LI No OD Yes
If yes, is any part of the removal of quarry material intended to be located in a declared wild river area under the Wild
Rivers Act 2005?
Oo No — (Complete Form 1, Part K7) This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
O Yes - Unless the application is consistent with any property davelopment plan applying to the land, the Assessment Manager must refuse to receive it,
(Complete Form 1, Part K;). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
Subject to the declaration for the relevant wild river area, assessment is also required for the pumposes of the Wild Rivers Act 2005,
SAMA ret HOS PR oe ae
werd eter one
PA ere Bot UF hem P Aoge ato eng oP us 2 tom PR go Po ached To 2a
NG ser WA
ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA —
1.3 Dooyine proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
No-Gotai.4 [Yes
If yes, is any part of any ERA intended to be located in a wild river area declared under the Wild Rivers Act 2005?
LNo
{f no, is there a code of environmental compliance under the Environmental Protection Regulation 1998 tor every aspect of each
proposed ERA?
LI No - (Comptete Form 1, Part G) This application requires assessment by the Administering Authonity. If the Administering Authority is not the @
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. Go to Q1.4
C1 Yes - Goto. a1.4
Ol Yes
Ifyes, is any ERA an item 20 ERA (extracting rock or other material) intended to be located in waters?
OJ Yes
If yes, will the application be accompanied by an allocation notice for that ERA, as defined under the Environmental
Protection Act 1994, section 73AA(9)?
O Yes - Unless the application is consistent with any proparty development plan applying to the land, and the application is accompanied by an
allocation notice, the Assessment Manager must refuse to receive it. (Complete Form 1, Part G). This application requires assessment by the
Administering Authority for the purposes of both the Environmental Protection Act 1994 and, subject to the declaration for the relevant wild river area,
the Wild Rivers Act 2005. If the Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.
No — An application for the ERA will be taken to be not property made and the Assessment Manager must refuse to receive it.
oO No - Answer the following question/s on the next page
‘1 Inthis IDAS Assessment Checklisi, the term proposal refers to the proposed use, work or lot reconfiguration the subject of the application.
Page 2
Page 17
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
| ENVIRONMENTALLY, RELEVANT ACTIVITY; WILD RIVER AREA con =
If no, is any part of any ERA intended to be located ina high preservation area?
D Yes
Ityes, is each proposed ERA one of the following? .
(ERA, item 15 (sewage treatment) Ono O Yes
ERA, item 16 (municipal water treatment pl plant) ; / LINo ‘Oo Yes
(ii) ERA, ERA, item 19 (dredging material) Ono Yes
(iv) ERA, item 20 (extracting rock or other material) located outside waters and the [No (1 Yes
activity is a borrow pit of not more than 10,000m* for -
« — specified works under the Wild Rivers Act 2005; or
+ __ residential complexes, as defined under the Environmental Protection Act 1994
(v) ERA, item 22 { screening etc. materials) and carried out outside waters and the activity ‘a No 1 Yes”
is for -
« — specified works under the Wild Rivers Act 2005; or
+ _ for residential complexes, as defined under the Environmental Protection Act 1994
“(Wi) ERA, item 11 (crude oil or petroleum product storage) and the activity is - CINo ClyYes
« a level 2 ERA; and
« for residential complexes, as defined under the Environmental Protection Act 1994, &
* carried out outside a designated urban area, as defined under the Wild Rivers Act
2005
(vii) An exempt environmentally relevant activity, as defined under Environmental Protection On O Yes.
Act 1994, in a designated urban area, as defined under the Wild Rivers Act 2005
If yes to any one of (i) - (vii) above - Unless the application is consistent with any property development plan applying to ihe land, and
the application is accompanied by an allocation notice, the Assessment Manager must refuse (o receive it. (Complete Form 1, Part G). This
application requires assessment by the Administering Authority for the purposes of the Environmental Protection Act 1994. If the
Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. Subject to
any limitations in the declaration lor the wild river area and the Wild Rivers code, assessment is also required for the purposes of the Wild
Rivers Act 2005, tn particular, ERAs 15 and 16 and an ‘exempt environmentally relevant activity’ do not require assessment for the
purposes of the Wild Rivers Act 2005 if the proposed is located in a designated urban area
If no to alll of {i) - (vil) above - An application for the ERA/s will be taken to be not properly made and the Assessment Manager must
‘ refuse to receive it,
ONo
Ifno, is any ERA an item 20 ERA (extracting rock or other material) intended to be located outside waters?
oO No — Unless the application is consistent with any property development plan applying to the land, and the application is accompanied by
an allocation notice, the Assessment Manager must reluse to receive it. (Complete Form 1, Part G). This application requires
assessment by the Administering Authority for the purposes of both the Environmental Protection Act 1994 and the Wild Rivers Act
20085. If the Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.
QO Yes
lfyes, does the ERA meet the following? . . .
(i) the activity is located inside a flood management area and a borrow pit of not ‘CI No (5 Yes
more than 10,000m? for -
« — specified works under the Wild Rivers Act 2005; or
* — residential complexes, as defined under the Environmental Protection Act 1994
(ii)_the activity is located gutside a flood management area : : Oo No (J Yes |
IF yes to either (i) or (ji) above - Unless the application is consistent with any property development plan applying to ihe land, and
the application is accompanied by an allocation notice, the Assessment Manager must refuse to receive it. (Complete Form 1,
Part G). This application requires assessment by the Administering Authority for the purposes of both the Environmental
Protection Act 1994 and, subject to the declaration for tha relevant wild river area, the Wild Rivers Act 2005. If the Administering
Authority is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
If no to both (i) and (ii) above - An application for the ERA will be taken to be not properly made and the Assessment manager must
refuse to receive il.
Soguiitoe scness g } ae) toma tod
203
PP Sy capemetn Sy ag Aer Ba pe
“HA v2
Page 3
Page 18
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
[WITHIN THE UMTS OF APORT .
1.4
ls apy part of the premises within the limits of a port under the Transport infrastructure Act 1994?
No-Goi0ai5 (] Yes
If yes, is that part of the premises below high water mark?
CINo
[Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8 — Answer {a) to (c) below. This application requires assessment by the Port Authority for the land. If you answer no to (a), (b) and
(c) below, the Port Authority for the Port has jurisdiction as Advice Agency.
{a) _ Is any part of the proposal within 200m of a shipping channel or an entry and exit shipping corridor for the Port?
(CINo (1 Yes - the Port Authority for the Port has jurisdiction as Concurrence Agency.
{b) is any part of the proposal within 1,000m of a swing basin, a commercial fishing wharf, a mooring, anchorage or spoil grounds?
OONo (J Yes - The Port Authority for the Port has jurisdiction as Concurrence Agency.
{c) Is any part of the proposal within 1,000m of a planned port facility identified in a land use plan?
LINo LD Yes - The Post Authority for the Port has jurisdiction as Concurrence Agency.
P Aigi-ation. scheduie? 3022 tems ‘5 rd 15
IDECLAREDFISHHABITATAREA : pe
1.5
Does/Any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
0 - Go to 01.6
LO Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule 8,
this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If DPI&F is not the Assessment
Manager for the application, the agency has jurisdiction as Advice Agency.
Pee, woe shrdwe Pao LTE tS
| COMMUNITY INFRASTRUCTURE J ee
16
{s anypart of the premises designated for community infrastructure?
lo- Gooar7 (] Yes
It yes, is the community infrastructure intended to be provided by a public sector entity?
LINo (Yes
Hf yes, is the land owned by or on behalf of the State?
C1 Yes CINo
if no, is the development for the following?
(i) For the designated purpose CNo [Yes
(ii) Carried out by, or on behalf of, the designator CiNo COYes
If no to either or both (i) or (ii) above, is the proposed development assessable under the planning scheme?
oO No O Yes - This application must be refered io the Queensland Government department administering the Act authorising the
development for the designation as Concurrence Agency.
PR 3-07 schaduie? ub oT te
WASTE WATER MANAGEMENT
17
Does/the proposal involve the establishment or expansion of a waste water disposal system?
No + Endof Section 1 [_] Yes r )
If yes, is any part of the disposal system proposed to be located in an area declared to be a catchment area under the Water Act 2000?
(] No - End of Section: (CJ Yes
If yes, is the proposed waste water disposal system an environmentally relevant activity (ERA) under the Environmental
Protection Act 1994?
(1 Yes - Endof Sections [] No
If no, is the proposed development involving the waste water disposal system assessable under the planning scheme?
oO No - End of Section 1 Oo Yes - This application requires assessment by the Department of Natural Resources and Water (NRW) as
Concurrence Agency. End of Section 1
Page 4
Page 19
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkfist, Version 21.3, 9 May 2008
SECTION 2 Section 2 must be completed when the application seeks approval to materially change the use of premises.
PLANNING SCHEME _
2.1 is the proposed use assesgable under the planning scheme?
CINo - Gowa22 ‘eS — Complete Form 1, Part D and answer 02.1.1 - 2.1.13 below
It yeg“does the application request that the proposal be assessed against a superseded planning scheme?
No (1 Yes - (Complete Form 1 Attachment 1}
STATE-CONTROLLED ROAD oe _
2.1.1 | ls any part of the premises located in part of a future State-controlled road, or within 100m of a State-controtled road?
C1 Yes
If yes, is the use proposed in a future State-controlied road not defined by route?
oO Yes - This application must be referred to the Department of Main Roads (DMA) as Advice Agency.
oe No - This application must be referred to OMR as Concurrence Agency.
lo
If no /é the proposed use listed in schedule 5 of the Integrated Planning Regulation 1998 and dees it exceed the specified threshold?
lo O Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
iP Reguianon schedule 2 ‘atie 3 tems tral ard 3
ACID SULFATE SOILS —=
2.1.2 | Is the use proposed in a area listed? ‘ in State Planning Policy 2/02: Planning and Managing Development lnvolving
Acid Sulfate Soils?
[I No - Gow 02.1.3 es
If yes, is the natural ground of any part of the premises less than 20m AHD?
CJ No Yes
If yes, will the proposed use involve the following?
(i) Excavating more than 1,000m; of soil or sediment at or below 5m AHD A OO Yes
{ii) Filling the premises with 1,000m? or more of material with an average depth of 0.5m on land, soil wre (Yes
or sediment at or below 5m AHD
If yes to either or both (i) or (ii) above - This application must ba referred to the Department of Natural Resources and Water (NAW) as Advice Agency.
IP Reguiaton scheduie 2 ‘abie 3. tem 4 Stato Penning Porcy 202° Planning and Managing Devoloprrent nvoiwing Acid Suitate So-'s, section 33
COASTAL MANAGEMENT DISTRICT
2.1.3 | Does the proposed use involve the following?
A Carrying out operational work, completely or partly in a coastal management district LIN me oO Yes
“ii Carrying out building work, completely or partly in a coastal management district, that i is the To > Cl Yes
construction of new premises with a gross floor area (GFA) of at least 1,000m? A
(iii) Carrying out building work, completely or partly in a coastal management district, that is the ee D Yes
_ enlargement of the GFA of existing premises by more than 1,000m?
I yes to any one of (i) - (ili) above - This application must be referred fo the Environmental Protection Agency (EPA) as Concurrence Agency.
P Regulaton schedule 2, ane 3 end
VEGETATION CLEARING _.
2.1.4 |Do the premises include a lot containing the following?
(i) Acategory 1, 2 or 3 area shown ona Property Map of Assessable Vegetation (PMAV) ro OO yes
(ii) If there is no PMAV for a lot, remnant vegetation [No ves
if yes to either or both (i) 074i) above, is the size of the premises 2ha or larger?
LJ No - Go to 02.1.5 es
if yes, is the existing ys of the premises rural or environmental?
0 No @S - (Complete Form 1, Part J) This application must be referred to the Department of Natural Resources and Water (NRW) as
Concurrence Agency.
Prog tor schadwe 2 arg 2 ten tt
21 Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Coolooia, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Momington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
Page §
Page 20
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
I CONTAMINATED LAND - UNEXPLODED ORDNANCE
2.1.6
\s ap¥ part of the premises in an area for which an area management advice has been given for unexploded ordnance?
No - Goto 02.1.6 0 Yes - (Complete Form 1, Part N) This application must be referred lo the Administering Authority as Concurrence Agency.
PQ poate soma oa Patent,
PUBLIC PASSENGER TRANSPORT __ _ i
2.1.6
ls the proposed use of premises listed in schedule 13C of the integrated Planning Regulation 1998 and does it exceed the specified
threstold?
No - Goto 02.1.7 LO Yes - This application must be referred to Queenstand Transport (QT) as Concurrence Agency.
PR ae ark oD aos ee
IRAILWAY SAFETY AND EFFICIENCY
2.1.7
restald?
Is the proposed use of premises listed in schedule 13D of the Integrated Planning Regulation 1998 and does it exceed the specified
th
to Go to 02.1.8 oO Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
PR Po aN he TB toe ty
| KOALA CONSERVATION —
2.1.8
ls any part of the premises in a koala conservation area or koala sustainability area?
LINo-Gotwae19 [Yes
If yes, is the use for a domestic activity, as defined by the Environmental Protection Act 1994?
OC Yes CNo
If no, will the use result in the following? . @
(i) Clearing of native vegetation over an area greater than 2,500m? Cino (Yes
(ii) Anew building and any reasonably associated structure with a total footprint greater than 1,000m? []No [] Yes
(ii “An extension to an existing building and any reasonably associated structure if the ° ‘oO No a Yes
extension has a total footprint greater than 1,000m2
(iv). Extracting gravel, rock or sand from an area greater than 5,000m? oO No 0 Yes
(v) ‘Excavating or filling an area greater than 5,000m? CNo ‘oO Yes
(vi) Additional traffic in a koala conservation area or koala sustainability area between [ino [Yes
6:00pm on a day and 6:00am on the following day
if yes to any one of (i) - (vi) above - This application must be relerred to the Environmental Protection Agency (EPA} as Concurrence Agency.
fly USA seh 2due Laced tong
}EASEMENTS AND SUBSTATIONS
2.1.9
{s the use associated with regonfiguring a lot?
C1 Yes - Goto 02.1.10 No ~ Answer both (a) and (b} below
(a) Wil/Any part of any structure or work that is the natural and ordinary consequence of the use, be located in an easement?
No CJ Yes - Answer both (i) and (ii) below
(i) Is there an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 for a
transmission grid or supply network under that Act?
(No [J Yes - This application must be referred to the eniity as Advice Agency.
(ii) 1s there an easement in favour of the holder of pipeline licence number 1 issued under the Petroleum Act 1923 for
the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
Lino (1 Yes - This application must be referred to the licence holder as Advice Agency.
(b) is aj part of the premises situated within 100m of a substation site under the Electricity Act 1994?
No oO Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
Pp ter wh Dap ed crete cares A hoe mow FRE weds Pg od a at
RESID
ENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER AREA
2.1.10
Is apf part of the premises in a wild river area declared under the Wild Rivers Act 2005?
No-Gowo2111 (Yes
If yes, is the proposed use for residential, commercial or industrial purposes outside a designated urban area, as defined by the
Wild Rivers Act 2005?
LJ No (1 Yes - Subject to the declaration for the wild river area, assessment by the local government is required for the purposes of the
Wid Rivers Act 2005.
27
Die APM cla
Page 6
Page 21
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkfist, Version 21.3, 9 May 2008
WETLAND _ ee ; _ / |
2.1.11 | Is the’proposal only for the construction or use of a single residence on a lot and any reasonably associated building or structure?
Yes -Gota2.i12 {T)No
{f no, do the premises include a lot situated in, or within 100m of, a wetland shown on the ‘Map of referable wetlands’?
No (71 Yes - This application must be referred fo the Environmental Protection Agency (EPA) as Advice Agency.
P Ragu.arun scheaue 2 abe 3 terre
HERITAGE |
2.1,12 | Do fH premises include a lot sharing a common boundary with a Queensland Heritage place under the Queensland Heritage Act 1992?
No - Go to 02.1.13 (1 Yes - This application must be referred to the Environmental Protection Agency (EPA) as Advice Agency.
P Requation schedule 2 tavie 3 Yer 2
CERTAIN PRELIMINARY APPROVALS : es a ‘ J
2.1.13 | Is preliminary approval sought for the application under the IPA, section 3.1.6?
No - Go to 02.2 oO Yes - (Complete Form 1, Atiachment 2) This application must be referred to the Department of Infrastructure and Planning (DIP) as
Advice Agency.
P Reguianon schedule 2. iacie 3. ter 23
| BROTHEL
22 rere posee use a brothel as defined under the Prostitution Act 1999?
No - Go to 02.3 {1 Yes
If yes, does one or more of the following apply? _. . ee.
(i) The land is in, or within 200m of the closest point on any boundary of, a orimarily | residential area LJNo [1] Yes
of an area approved for residential development or intended to be residential in character
(ii) The land is within 200m of the closest point on any boundary of land on which there is a Ono OYes'
residential building, place of worship, hospital, school, kindergarten, or any other facility or place
regularly frequented by children for recreational or cultural activities (measured according to the
shortest route a person may reasonably and lawtully take, by vehicle or on foot, between the land proposed
for the brothel and other and) .
(iii) The land is within 100m of the closest point of any boundary of land on which there is isaresidental []No (] Yes
building, place of worship, hospital, school, kindergarten, or any facility or place regularly frequented
by children for recreational or cultural activities (measured in a straight | line)
(iv) More than 5 rooms are proposed to be used for providing prostitution LINo oO Yes
(v) The land is in a town where the Minister for Police and the local government have agreed that all CIJNo (Yes
applications for brothels in the local government area are to be refused
If yes to any one of (i) - (v) above - An application for a brothel must be refused by the assessment manager.
If no to all (i) - (v) above - (Complete Form 1, Part H) This aspect of the application is assessed by the local government for the purposes of the
Prostitution Act 1999.
"PA. schedi.e 3 pat} tabve2 120.2 Dasmurgn Act 1999 sechor 64
re eee PORT LAND _
23 part of the use proposed on Strategic Port Land under the Transport infrastructure Act 1994?
Wo. Go to 02.4 (Yes
If yes, is the proposed use inconsistent with the approved land use plan?
oO No oO Yes - (Complete Form 1, Part |) This application must be referred to Queensland Transport {OQT) as Concurrence Agency.
‘PA xomaeng J dart t tame 2 dem 3 PO Rvp, rar scracue ? ‘abe? tems
MAJOR HAZARDFACILITY ===
2.4 | Is theStoposed use a major hazard facility or possible major hazard facility under the Dangerous Goods Safely Management Act 2001?
0 - Go to 02.5 ) Yes ~ (Complete Form 1. Part L) This application requires assessment by the Department of Emergency Services (DES). if
DES is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
PA staked swt tage 2 pee Fy. ston sore 2 ac en”
Page 7
Page 22
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
CONTAMINATED LAND - REGISTERED LAND
25 swf of the land forming the premises on the Environmental Management Register or Contaminated Land Register under the
Envigonmental Protection Act 1994?
lO - Go 10 02.6 O1 Yes
If yes, does one or more of the following apply? _ oe
(i) A suitability statement has been given and a site management plan has been approved for the LINo [1] Yes
proposed use of the land, and the proposed use involves only the following -
¢ — the fit-out of a building on the land; or
+ minor site excavation, including for example, post holes for open-sided non-habitable structures .
(ii) There is currently a notifiable activity on the land and the activity is continuing (No [Yes
(iii) The proposed use is industrial and only involves minor site excavation (e.g. post holes for open-sided [[}]No [1] Yes
non-habitable structures) _ ae
Ono (Yes /
(iv) The land is used for a mining activity or petroleum activity
If no to all {i) - {iv) above - (Complete Form 1, Part N) This application requires assessment by the Environmental Protection Agency (EPA), If EPA is nat
the Assessment Manager for the application, the agency has jurisdiction as Concumence Agency.
Pa wt med wad Rs! tne, PRoguluton scnedt oe?
[CONTAMINATED LAND - NOTIFIABLE ACTIVITY oe
2.6 _ | Is any part of the land forming the premises currently used for a notifiable activity, or if there is no existing use was it last used for a
lis
le activity?
0 - Go to 02.7 Cl Yes @
If yes, does one or more of the following apply?
(i) A suitability statement, removing the land from the environmental management register, hasbeen [[]No [] Yes
given under the Environmental Protection Act 1994 for the existing use, or if there is no existing use,
the last use, and the following both apply -
* no new notifiable activity has occurred on the land since the suitability statement was issued:
+ the land is not otherwise contaminated by a hazardous contaminant
(ii) A suitability statement has been given and a site management plan has been approved for the Ono (1 Yes
proposed use of the land, and the proposed use involves only the following -
* — the fit-out of a building on the land; or
* — minor site excavation, including for example, post holes for open-sided non-habitable structures . ,
(iii) The land is used for a mining activity or petroleum activity CI No [7 Yes
If no to all {i) - (iii) above - (Complete Form 1, Part N) This application requires assessment by the Environmental protection Agency (EPA). If EPA is not
the Assessment Manager for ihe application, the agency has jurisdiction as Concurrence Agency.
PA ar Sat! Sabie? fo 5 PAC aon achedues 2 oat 2
CONTAMINATED LAND ~ INDUSTRIAL ACTIVITY ae
2.7 | Is any part of the premises currently used for an industrial activity (other than for a mining activity or petroleum activity), or if there is no
exisjhg use was it last used for an industrial activity (other than for a mining activity or petroleum activity)? @
No - Go 0.02.8 O Yes
It yes, is the proposed use for child care, educational, recreational or residential purposes (including a caretaker residence on
industrial land)?
oO No oO Yes - (Complete Form 1, Part N) This application requires assessment by the Environmental Protection Agency (EPA). if EPA is
not the Assessment Manager for the application, it has jurisdiction as Concurrence Agency.
Pyro grt cp sm Par be eho gow nae
Page 8
Page 23
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 21.3, 3 May 2008
CONTAMINATED ) LAND= AREA MANAGEMENT ADVICE (NATURAL MINERALISATION OR INDUSTRIALACTIVITY)
2.
8 ele of the premises in an area for which an area management advice has been given for natural mineralisation or industrial
actiyfy (other than for a mining activity or petroleum activity)?
oO No 0 Yes - (Complete Form 1, Part N) This application requires assessment by the Environmental Protection Agency (EPA). If EPA is
nol the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
(PA scnedule 3 car (Jen 2 tor 7-P Raguiaton scheouie 2 tapte 2. ter 22
No - Goto. 02.9 C] Yes
if yes, is the proposed use for child care, educational, recreational or residential purposes (including a caretaker residence on
industrial land)?
AQUACULTURE: WILD RIVER AREA Ti
29
Is theffroposed use for aquaculture as defined under the Fisheries Act 1994?
IPA, schedule 3. part f, Mme 2 itor 3,
wild wer areay Wild 3iv
-Gotoa210 (_] Yes
{f yes, is any part of the aquaculture intended to be located in a wild river area declared under the Wid Rivers Act 2005?
LINo
If no, will the proposed aquaculture cause no discharge of waste into Queensland waters and be -
(i) _ of indigenous freshwater fish species listed in the Fisheries (Freshwater) Management Plan 1999, schedule 6; and
(i) in a catchment listed in that schedule for that species for aquarium display or human consumption only; and
(iii) carried out in ponds, or using above-ground tanks, that have a total water surface area of no more than Sha
Yes - Gotoa2.10 [No
If no, will the proposed aquaculture cause no discharge of waste into Queensiand waters, be of indigenous freshwater
fish for aquarium display or human consumption only, or nonindigenous freshwater fish for aquarium display only, and
carried out using only above-ground tanks that have -
(i) a floor area, excluding water storage area, of no more than 50m?; and
(ii) a roof impervious to rain water
(1 Yes -Gotae.10 (No
If no, will the proposed aquaculture cause no discharge of waste into Queensland waters, be of indigenous
marine fish for aquarium display only and carried out using only above-ground tanks that have a total floor area,
excluding water storage areas, of no more than 50m2?
oO Yes ~ Go to 02.10 | No - (Complete Form 1, Part O:) This application requires assessment by the Department of Primary
Industries and Fisheries (DPI&F). If DPI&F is not the Assessment Manager for the application, the
O agency has jurisdiction as Concurrence Agency.
Yes
If yes, is any part of the aquaculture intended to be located in a wild river high preservation area?
oO No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part O,} This application requires assessment by the Department of Primary industries and Fisheries
(DPI&F). Subject to the declaration for the relevant wild river area, assessment may also be required for the purposes of the Wild Rivers
Act 2005, if OPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
oO Yes - An application for the aquaculture will be taken to be not properly made and the Assessment Manager mus! refuse to receive it.
IPA semcdue 3, part? Mee 2 tain f self assessable aquaculture’ iP Roguiahon, acheatie 2, t20i¢ 2. som 2” Fishenes Act 1994 sachor “350A
t 2003, secton 1A.
AGRICULTURALTAND ANIMAL HUSBANDRY, ACTIVITIES IN'A WILD RIVER’ AREA Sac |
2.10
PA wh:
is ary of the premises in a wild river area declared under the Wild Rivers Act 2005?
Go to 02.11
Yes
If yes, is the proposed use for the following?
(i) Agricultural activities as defined under the Wild Rivers Act 2005 CJ No OO Yes
(ii) Animal husbandry activities as defined under the Wild Rivers Act 2005 1 No O Yes
if yes to either (i) or (ii) above, is any part of the premises in the high preservation area in the wild river area?
Ol Yes - An application for the use will ba taken to be not propery made and the Assessment Manager must refuse fo receive it.
( No
If no, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005?
oO Yes - An appiication for the use wil be taken fo be not properly made and the assessment manager must refuse to receive it
O No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part Q if agriculture). (Complete Part R if animal husbandry) Subject to the relevant declaration for the
wild river area, this application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
19 Peg won ac:
BoD se
22 ave 2 tor 38 WI 5 Agr Qed2 Gecterg 2 PA.
Page 9
Page 24
INTEGRATI
ED PLANNING ACT 1997
IDAS Assessment Checklist, Version 21.3, 9 May 2008
SEQ REGIONAL PLAN
211A
s any part of the premises within the South East Queensland (SEQ) Regionat Plan area?
[No - Goo 02.118 Yes
If yes, are the premises within one or more of the following areas?
* A Major Development Area in the Urban Footprint CI No (7 Yes - (Answer (a) to (c} below)
© The Regional Landscape and Rural Production Area (1 No Wes - (Answer (d) below)
¢ The Rural Living Area LI No E17 Yes - (answer fe) below)
© The Investigation Area (CO No (7) Yes - (answer (f) and (g) below)
For the part of the premises within the Major Development Area (Questions (a) ~ (c))
(a) Does the application involve intensive animal husbandry as defined under the SEQ Regional Plan Regulatory Provisions?
No (1 Yes - the sea Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in this
checklist is answered yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also). This application must be
seferred to the Department of Infrastructure and Planning (DIP) as Concurrence Agency.
(b) Does the application involve residential development involving a rural residential purpose as defined under the SEQ
Regional Plan Regulatory Provisions?
oO No 0 Yes — The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Questions 2.1 in this
checklist is answered yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also). This application must be
seferred to the Department of infrastructure and Planning (DIP) as Concurrence Agency.
{c) Does the application involve an urban activity as defined under the SEQ Regional Plan Regulatory Provisions?
LI No -Endor(ay-() (1 Yes
If yes, are the premises included in a structure plan as defined under the SEQ Regional Plan Regulatory Provisions?
01 Yes
tf yes, does the IPA, section 3.1.6 apply to the application?
| No - End of (c) Oo Yes - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure
Questions 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be
answered also). This application must be referred to the Department of infrastructure and
Planning (DIP) as Concurrence Agency.
CINo
Hino, does the following apply? _ . _ _.
(i), Impact assessment is required under the planning scheme / .CNo (7 Yes
(li) The IPA, section 3.1.6 applies to the application UJ No [Yes
(i) _The premises exceed 10,000m? a _ No D1 Yes
(iv) The gross floor area, as defined under the SEQ Regional Plan Regulatory [UNo (1 Yes
Provisions, on the premises will exceed 10,000m2
If yes to any one of (i) - (iv) above - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure
Questions 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to
be answered also). This application must be referred to the Department of Infrastructure
and Planning (DIP) as Concurrence Agency.
For the part of the premises within the Regional Landscape and Rural Production (RLRP) Area (Question (q))
(d) woe application involve an urban activity as defined under the SEQ Regional Plan Regulatory Provisions?
Yes
IFyes, is every urban activity in the application excluded from being assessable for the purposes of the SEQ Regional
Plan ithe RLRP Area?
@S - End of (d) oO No - The SEQ Regionat Pian makes this use assessable under the planning scheme. (Ensure Question 2.1
in this checklist is answered yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also). This application
must be referred to the Department of infrastructure and Planning (DIP) as Concurrence Agency.
iN)
fino, does the application involve residential development involving a rural residential purpose as defined under
the SEQ Regional Plan Regulatory Provisions?
EANo - End of (a CJ Yes
ILyes, are the premises located in the Mt Lindesay/North Beaudesert Study area?
oO No - The SEQ Regional Pian makes this use assessable under the planning scheme. (Ensure Question 2.1 in this checklist is answered
yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also). This application must be referred to the Department of
Infrastructure and Planning (DIP) as Concurrence Agency.
oO Yes - Go to the first question on the next page of this Checklist
Page 10
Page 25
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checkfist, Version 21.3, 9 May 2008
SEQ REGIONAL! PLAN]
(
(e) Does the application involve an urban activity as defined under the SEQ Regional Plan Regulatory Provisions?
Ifyes, are the premises in a zone or equivalent designated area mentioned in a notice published by the
regional planning Minister?
o Yes - End of (d) Oo No - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Question
21 in this checklist is answered ‘yes’, This requires Questions 2.1.1 - 2.1.13 to be answered also).
This application must be referred io the Department of infrastructure and Planning (DIP) as Concurrence Agency.
CINo - End of fe) OJ Yes
It yes, is every urban activity in the application excluded from being assessable for the purposes of the SEQ Regional
Plan in the Rural Living Area?
oO Yes - End of (a) Ol No - The SEQ Regional Plan makes this use assassable under the planning scheme. (Ensure Question 2.1
in this checklist is answered ‘yes’. This requires Questions 2.1.1 ~ 2.1.13 to be answered also). This
“For the part of the premises within the Investigation Area (Question (f) ~ (g))
(g) Does the application involve an urban activity as defined under the SEQ Regional Plan Regulatory Provisions?
$E2 Sogioral Alan 209 2023, Amendment 1. Reguiattory Provisions divsion 2: 1P Regulation, schedute 2.
application must be referred to the Department of Infrastructure and Planning (DIP) as Concurrence Agency.
Does the application involve intensive animal husbandry as defined under the SEQ Regional Plan Regulatory Provisions?
oO No - End of (f) oO Yes - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Question 2.1 in this
checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also). This application must be
referred to the Department of Infrastructure and Planning (DIP) as Concurrence Agency.
Yes
yes, is every urban activity in the application excluded from being assessable for the purposes of the SEQ Regional
Plan in the Investigation Area?
Oo Yes - Go 10 02.12 oO No - The SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure Question 2.1 in
this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also}. This
application must be referred to the Department of Infrastructure and Planning (DIP) as Concurrence Agency.
LINo
\f no, does the application involve residential development involving a rural residential purpose as defined under
the SEQ Regional Plan Regulatory Provisions?
(No -Gotoa212 [Yes
It yes, are the premises located in the Mt Lindesay/North Beaudesert Study area?
i] No - The SEQ Regional Plan makes this use assessable under the planning scheme, (Ensure Questions 2.1 in this checklist is
answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 lo be answered also). This application must be referred to the Department
of Infrastructure and Planning (DIP) as Concurrence Agency.
Yes
If yes, are the premises in a zone or equivalent designated area mentioned in a notice published by the
regional planning Minister?
OC) Yes - Go to 02.12 oO No - Tha SEQ Regional Plan makes this use assessable under the planning scheme. (Ensure
Questions 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13
to be answered also). This application must be referred to the Department of
Infrastructure and Planning (DIP) as Concurrence Agency.
ie 3, Lem 13. IPA, secbun 2 5A, 123),
Page 11
Page 26
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
STATE PLANNING REGULATORY PROVISIONS (REGIONAL PLANS)?
2.118 | Is any part of the premises within a designated region under Schedule 1 of the draft regulatory provisions?
(INo-Gowa212 [Yes
if yes, are the premises within one or more of the following areas?
© Amaster planned area in the Urban Footprint Cino CJ Yes- (Answer (a) to (c) below)
« The Regional Landscape and Rural Production Area CO No (7 Yes - (Answer (a) below)
© The Rural Living Area [No (1 Yes - (Answer (e) below)
«The Investigation Area CINo (1 Yes- (Answer (1) and (g) below)
For the part of the premises within a master planned area (Questions (a) - (c))
{a) Does the application involve an activity as defined under section 2.2(1) of the draft regulatory provisions?
No oO Yes — The draft reguiatory provisions for the designated region make this use assessable under the planning scheme.
(Ensure Question 2.1 in this checklist is answered yes’. This requites Questions 2.1.1 - 2.1.13 to be answered also).
This application must be relerrad to the Department of infrastructure and Planning (DIP) as Concurrence Agency.
{b) Does the application involve residential development involving a rural residential purpose as defined in Schedule 2 of
the draft regulatory provisions?
Oo No oO Yes — The draft regulatory provisions for the designated region make this use assessable under the planning scheme.
(Ensure Question 2.1 in this checklist is answered yes’, This requires Questions 2.1.1 - 2.1.13 to be answered also).
This Application must be referred to the Department of Infrastructure and Planning (DIP) as Concurrence Agency.
(c) Does the application involve an urban activity as defined in Schedule 2 of the draft regulatory provisions? e@
[No -éndot(ay-) (Yes
If yes, are the premises included in a structure plan as defined under IPA, Schedule 10
C1) Yes
If yes, does the IPA, section 3.1.6 apply fo the application?
| No - End of (c) oO Yes - The draft regulatory provisions for the designated region make this use assessable under the
planning scheme. (Ensure Question 2.1 in this checklist is answered ‘yes’. This requires
Questions 2.1.1 - 2.1.13 to be answered also), This application must be referred to the
Department of Infrastructure and Planning (DIP) as Concurrence Agency.
CNo
Wino, does the following apply? _. . i ee
(i) Impact assessment is required under the planning scheme CONo (Yes
(li) The premises exceed the number stated in section 2.1(b)(ii) of the draft CI No [2 Yes
regulatory provisions
(iii) The gross floor area, as defined in Schedule 2 of the draft regulatory provisions, [] No [[] Yes
on the premises will exceed the number stated in section 2.1(b)(iii) of the draft
regulatory provisions
If yes to any one of (i) - (iii) above - The draft regulatory provisions for the designated region make this use assessable under
the planning scheme. (Ensure Question 2,1 in this checklist is answered ‘yes’. This e
requires Questions 2.1.1 ~ 2.1.13 to be answered also). This application must be reterred
_,10 the Department of infrastructure and Planning (DIP) as Concurrence Agency.
For the part of the premises within the Regional Landscape and Rural Production (RLRP) Area (Question (a)
(d) Does the application involve an urban activity as defined in Schedule 2 of the draft regulatory provisions?
O Yes
If yes, is every urban activity in the application excluded from being assessable under section 2.4(2) of the draft
regulatory provisions?
oO Yes - End of (a) oO No - The draft regulatory provisions for the designated region make this use assessable under the planning
scheme, (Ensure Question 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13
to be answered also). This application must be referred to the Department of Infrastructure and Planning
(DIP} as Concurrence Agency.
CJ No
If no, does the application involve residential development involving a rural residential purpose as defined in
Schedute 2 of the draft regulatory provisions?
CJ No - End of (a) OC Yes
22 State Planning Regulatory Provisions (Regional Plans) are the draft regulatory provisions
Page 12
Page 27
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
Ifyes, does the following apply? oe oo _
() The development application or development application (superseded CINo () Yes
planning scheme) is properly made within two calendar years from the day
____the draft regulatory provisions for the designated region took effect _. oe
(ii) The premises is located in a zone listed in Schedule 1 Table 3 for the CI No () Yes
designated region
It no to either of (i) or {ii) above - The draft regulatory provisions for ihe designated region make this use assessable under the
planning scheme. (Ensure Question 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 - 2.1.13 to be answered
also). This application must be referred to ihe Department of Infrastructure and Planning (DIP) as Concurrence Agency.
For the part of the premises within the Rural Living Area (Question (e)
(2) Does the application involve an urban activity as defined in Schedule 2 of the draft regulatory provisions?
(No - End of fo) Yes
{f yes, is every urban activity in the application excluded from being assessable under section 2.8(2) of the draft
regulatory provisions?
D1 Yes - End of fe) LINo The craft regulatory provisions for the designated region makes this use assessable under the planning
scheme. (Ensure Question 2.1 in this checklist is answered ‘yes’. This requires Questions 2.1.1 -
2.1.13 to be answered also), This application must be referred to the Department of Infrastructure and
Planning (DIP) as Concurrence Agency.
For the part of the premises within the Investigation Area (Question (f) - (g)) .
(Does the application involve an activity as defined under section 2.14 of the draft regulatory provisions?
Oo No - Endol (i) oO Yes - The draft regulatory provisions for the designated region make this usa assessable under the planning scheme.
(Ensure Question 2.1 in this checklist is answered yes’. This requires Questions 2.1.1 - 2.1.13 to be answered also).
This application must be raferred to the Department of Infrastructure and Planning (DIP) as Concurrence Agency.
_ (g) Does the application involve an urban activity as defined in Schedule 2 of the draft regulatory provisions?
Yes
Ifyes, is every urban activity in the application excluded from being assessable under section 2.10(2) of the draft
fegulatory provisions?
oO Yes - Go to 02.12 o No - The draft requiatory provisions for the designated region make this use assessable under the planning
scheme. (Ensure Question 2,1 in this checklist is answered yes’, This requires Questions 2.1.1 - 2.1.13 to
be answered also}. This application must be referred to the Department of Infrastructure and Planning (DIP)
as Concurrence Agency.
No
If 10, does the application involve residential development involving a rural residential purpose as defined in
Schedule 2 of the draft regulatory provisions?
[JNo-Gotoaz12 (Yes
Ifyes, does the following apply? ee
(i) The development application or development application (superseded CI No :( Yes
planning scheme) is properly made within two calendar years from the day i
! the draft regulatory provisions for the designated region took effect _ Le
(ii) The premises is located in a zone listed in Schedule 1 Table 3 for the CiNo (Yes
designated region
If no to either of (i) or (ii) above - The draft regulatory provisions for the designated region make this use assessable under the
planning scheme, (Ensure Question 2.1 in this checklist is answered ‘yes’, This requires Questions 2.1.1 - 2.1.13 to be answered
also). This application must be relerred to the Department of infrastructure and Planning (DIP) as Concurrence Agency.
Sur Panny FJoquaior Provsors Regens #ars., div'son 2: P Aeguation. scnecule 2, tele 3 tom *31P Vogt ater senuituc Ie,
Page 13
Page 28
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 21.3, 9 May 2008
CONSERVATION ESTATE
2.12 {Is the proposal for urban pyoses, as defined under the IPA?
Yes
LINo - Go 02.13
If yes, is the use proposed on a lot situated in, or within 100m of, any of the following?
(i) A protected area, forest reserve, critical habitat or area of major interest under the Nature Conservation Ono ClYes
Act 1992
(ii) A State forest or timber reserve under the Forestry Act 1959 we Ao (Yes
(iii) A marine park under the Marine Parks Act 2004 (No O Yes
(iv) A recreation area under the Recreation Area Management Act 1988 _ (Wo Oves_
(v) A world heritage area listed under the World Heritage Convention Mo 0 Yes
Mio 1 Yes ,
If yes to any one of (i) — (vi) above - This application must be referred to the chief executive under the relevant Act mentioned as Advice Agency.
(vi) Brisbane forest park under the Brisbane Forest Park Act 1977
PRC MASE Pe EL
|REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT
2.13 | Does the proposed use involve the removal, destruction or damage of marine plants under the Fisheries Act 1994?
No - End of Secton2 (C] Yes
'fyes, is the proposed operational work reasonably necessary for: (Tick applicable box‘es and answer (a) and/or (b) below)
(i) The removal, destruction or damage of dead marine wood on unallocated State land, other thanina (()No (J Yes
wild river area, for trade orcommerce oe . .
(ii) The maintenance of existing structures, including, for example, the following structures, if they were [-]No [J Yes
constructed in compliance with all the requirements, under any Act, relating to a structure of that type -
+ boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures and weirs;
+ existing drainage structures;
+ existing powerlines or associated powerline infrastructure . _ oo.
(iii) Educational or research purposes or for monitoring the impact of development on marine plants ino (Yes ,
('v)_ The construction or placement of structures, including, for example, swimming enclosures, safety signs, aids [1] No (1 Yes
to navigation, fences, pontoons, public boat ramps and pipelines, if-
«the extent of the removal, destruction or damage is minor; and
+ _ the structures were constructed in compliance with all the requirements, under any Acl, relating to a
structure of that type
{v) The construction of runnels for mosquito control, removal of Lyngbya, seed collection tor site rehabilitation or ([]}No ([] Yes
the collection of marine plants for fishing bait, or handicraft
(a) If yes to one or more of (i) - (v) above, does all of the proposed operational work comply with any applicable Department
of Primary Industries and Fisheries (DPI&F) self-assessable code?
Yes - A permit is not required for that aspect of the proposed operational work. End of Section 2 oO No - Go to (b)
{b) If no to all of (i) - (v) or no to (a) above, does a development permit exist for that proposed operational work?
C1 Yes - End of Sectin2 ~~ [] No e
If no, has approval been sought in a separate application?
CO Yes - End of Section 2 (I No - This application is also taken to be an application for operational work for removing, destroying or
damaging marine plants under the Fisheries Act 1994. (Complete Section 4 of this checklist).
24 eotrg Da - Dy
Page 14
Page 29
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
S E CTIO N 3 Section 3 must be completed when the application seeks approval to reconfiguring a lot. :°4. scnaduie 3. art I, table 3
STATE-CONTROLLED ROAD . _
3.1 | Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
LINo
lf no, is the proposed reconfiguration listed in integrated Planning Regulation 1998, schedule 5 and does it exceed the threshold?
CINo (1 Yes - The application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
UC Yes
if yes, will the proposed reconfiguration result in the following?
(i) An increase in the totat number of lots a) UO Yes
(ii) An increase in the total number of lots abutting the State-controlled road (No (1 Yes
if yes to either or both (i) or (ii) above, is the reconfiguration proposed in a future State-controlled road not defined by route?
C] Yes - This application must be referred to the Department of Main Roads (DMA) as Advice Agency
ia) No - This apptication must be referred to DMR as Concurrence Agency.
‘P Reguiation, schedule 2 table J tem J, iP Regu'ason schedule 2, ta0le 2. tam 2.
COASTAL MANAGEMENT DISTRICT . a
3.2 — |Is any part of the premises within a coastal management district?
LINo -Gotea3.3 — [_] Yes - This appfication must be referred to the Environmental Protection Agency (EPA) as Concumence Agency.
iP Reguiation. scnedule 2. tanie 2 tem 12a
VEGETATION CLEARING ;
3.3 | Do the premises include a lot containing the following?
(i) Acategory 1, 2 or 3 area shown on a Property Map of Assessable Vegetation (PMAV) 0 No CO Yes
(ii) If there is no PMAV for a lot, remnant vegetation Mino (Yes
I yes to either or both (i) or (ii) above, are 2 or more lots proposed to be created?
(INo-Gowass (1) Yes
If yes, is any lot, before the proposed reconfiguration, 2ha or larger?
LINo -Gota34 (]Yes
If yes, is the size of any lot proposed to be created, 25ha or smaller?
Oo No - Go to 03.4 oO Yes - (Complete Form i, Part J) This application must be referred to the Department of Natural Resources
and Water (NRW) as Concurrence Agency.
IP Raguianion, schedule 2, tavie 2 tem 4
‘| EASEMENTS _ |
3.4 |Is any part of the premises subject to an easement?
(No - Go 0038 (Yes - Answer both (a) and (b) below
(a) |s there an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 for a transmission
grid or supply network under that Act?
[No (1 Yes - This application must be referred to the entity as Advice Agency.
{b) ts there an easement in favour of the holder of Pipeline Licence Number 1 issued under the Petroleum Act 1923 for the
construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
(No C1 Yes - This application mus! be referred to the licence holder as Advice Agency.
iP Reguiation, schedule 2, table 2. tam 20/2) (glectrcity easement); IP Regulation schedule 2 tan‘e 2, tem 32 pipeline 2asementi
ELECTRICITY SUBSTATIONS _ _ _
3.5 |\s any part of the premises situated within 100m of a substation site under the Electricity Act 1994?
(INo - Go10036 (CJ Yes - This application must be referred to the entity responsible for the subslation as Advice Agency.
PAS shcoLe 2 ace 2 br en.
Page 15
Page 30
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
CONTAMINATED LAND - REGISTERED LAND _. _
3.6 Is any part of the land forming the premises on the Environmental Management Register or Contaminated Land Register under the
Environmenial Protection Act 1994?
(No -Gowaa7 (Yes
If yes, does one or more of the following apply? _.
{i} A suitability statement has been given and a site management plan has been approved for the CINo (1) Yes
proposed use of the land, and the proposed use involves only the following -
+ the fit-out of a building on the land; or
* — minor site excavation, including for example, post holes for open-sided non-habitable structures
(ii) There is currently a notifiable activity on the land and the activity is continuing Cno CYes
(iii) The proposed use is industrial and only involves minor site excavation (e.g. post holes for open-sided [CJNo (1) Yes
fon-habitable structures)
If no to alll of (i) - (iii) above - (Complete Form 1, Part N) This application requires assessment by the Environmental Protection Agency (EPA). If EPA is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
I te
wet Wwe 2 ten Ma
CONTAMINATED LAND - NOTIFIABLE ACTIVITY __
3.7 | Is any part of the land forming the premises currently used for a notifiable activity, or if there is no existing use was it last used for a
notifiable activity?
LINo-Gowa3s (Yes
If yes, does one or more of the following apply? _ @
(i) A suitability statement, removing the land from the environmental management register, hasbeen []No [] Yes
given under the Environmental Protection Act 1994 for the existing use, or if there is no existing use,
the last use, and the following both apply -
* no new notifiable activity has occurred on the land since the suitability statement was issued;
(ii) A suitability statement has been given and a site management plan has been approved for the LINo [Yes
proposed use of the land, and the proposed use involves only the following -
+ the fit-out of a building on the land; or
+ minor site excavation, including for example, post holes for open-sided non-habitable structures
If1no to both (i) and (ii) above - (Complete Form 1, Part N) This application requires assessment by the Environmental Protection Agency (EPA). HEPA
is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
Oy NY AML wed cer nt
CONTAMINATED LAND ~ INDUSTRIAL ACTIVITY _ _.
3.8 | Is any part of the premises currently used for an industrial activity (other than for a mining activity or petroleum activity), or if there is
No existing use was it last used for an industrial activity (other than for a mining activity or petroleum activity)?
[INo-Gotoas9 =] Yes
ILyes, is the proposed use for child care, educational, recreational or residential purposes (including a caretaker residence on industrial land}?
No oO Yes - (Complete Form 1, Part N) This applicalion must be referred to the Environmental Protection Agency (EPA) as Concurrence Agency.
Pree tag?
CONTAMINATED LAND - AREA MANAGEMENT ADVICE (NATURAL MINERALISATION OR INDUSTRIAL ACTIVITY) .
3.9 _| Is any part of the premises in an area for which an area management advice has been given for natural mineralisation or industrial
activity (other than for a mining activity or petroleum activity)?
LINo-Gota3.10 [1 Yes
yes, is the proposed use for child care, educational, recreational or residential purposes (including a caretaker residence on industrial land)?
CJ No (J Yes - (Complete Form 1, Part N) This application must be referred the Environmental Protection Agency (EPA) as Concurrence
Agency.
CONTAMINATED LAND - AREA MANAGEMENT ADVICE (UNEXPLODED ORDNANCE) .
3.10 | Is any part of the premises in an area for which an area management advice has been given for unexploded ordnance?
LINo -Gotoas.11 (1 Yes - (Complete Form 1. Part N) This application must be retemed to the Environmental Protection Agency (EPA) as
Concurrence Agency.
Prom a
Page 16
Page 31
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
SEQ REGIONAL PLANT Z a
3.114 | Is any part of the premises within the South East Queensland (SEQ) Regional Plan area?
CINo -Gotoo3a.118 (Yes
If yes, is the application seeking approval for subdivision"?
[No -Gowo312 [F) Yes - Answer both (a) and (b} below
(a) Is any part of the premises located within a Major Development Area and not included in a structure plan as defined under
the SEQ Regional! Plan Regulatory Provisions?
(CNo- Goto CL] Yes
\Fyes, indicate whether or not the following circumstances apply to the subdivision proposal - (Tick if applicable)
The subdivision:
eed
(i) Creates lots with a size greater than 100 hectares ; : {No ‘(J Yes
“(i) Creates a residual tot ~~ EINo ‘Dives |
‘i Creates the same number or fewer lots than the number of lots being subdivided ino Dives :
(iv) Creates a single additional lot when an existing lot is severed by a road that was ~ (No O Yes
gazetted before 2 March 2006 :
(v) Creates a single additional lot for an emergency ser services facility — [CINo oO Yes ‘
"(wi) Creates a single additional lot for a water cycle management infrastructure. 7 a On O Yes ,
(vil) Creates a single additional lot tor waste management facility Ono CYes
- (viii) Creates a single additional lot for telecommunications infrastructure Cinco [} Yes
(x) Creates a single additional lot for electricity infrastructure , - Oo No “Dyes
09 Creates a single additional lot for cemetery or a crematorium 7 (ONo (Yes
*(xi)_ Is carried out in association with a development approval for a material change of use of go No (1) Yes
premises that has not lapsed, if the development approval was for a development
application that was made before 31 October 2006
: (xii) Is carried out in association with a development approval for a material change of use of LCINo -(1 Yes
! premises that - :
* — was given for development made assessable under SEQ Regional Plan Regulatory ! 1
Provisions, section 2.1 or 2.2; and ‘
« has not lapsed
(xiii) Creates lots for a purpose or is being carried out in association with development ather other "oa No No ED Yes
than those stated in (i) - (xii) above
If yes to other development under (xiii) above - This application must be referred to the Department of infrastructure and Planning
(DIP) as Concurrence Agency. Answer (b) on the next page of this Checklist
31 For the purposes of the SEQ Regional Plan, subdivision means — (a) creating a lot by subdividing another lot; or (b) dividing land into parts by agreement (other than a lease for a
term, including renewal options, not exceeding 10 years) rendering different parts of a lot immediately available for separate disposition or separate occupation)
Page 17
Page 32
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
| SEQ REGIONAL PLAN (com)
{b)_ fs any part of the premises within the Regional Landscape and Rural Production Area or in the Investigation Area?
(No -Gotoaa.12 (Yes - Answer (i) - (ii)
{i) Is any part of the premises located in a rural precinct or an interim rural precinct and is any lot resulting from the
subdivision proposed to have a lot size smatier than the minimum stated in the relevant planning scheme for the
precinct?
io No - Goto (ii) ([) Yes - Complete Table 1
The subdivision:
(i) Creates a residual lot ; ~ DINo Ores
(ii) Creates the > same number or fewer lots than le number of lots being sub vided . “TN a Yes
(iii) Creates a single additional lot when an existing ‘lot is severed by a road that was gazetted before2 []No o Yes
March 2006 ; .
(iv) Creates a single additional lot for an emergency services facility . L1No OO Yes
(v) Creates a single additional lot for a water cycle management infrastructure Oo No [] Yes.
{vi) Creates a single additional lot for waste management facility ; . No oO Yes
(vil) Creates a single additional lot for telecommunications infrastructure oO No oO Yes
(viii) Creates a single additional lot for electricity infrastructure O No_ oO Yes
(ix) Creates a single additional lot for cemetery or a crematorium Ono UL Yes
(x) _ Is being carried out in association with a development approval for a material change of use of LINo (1) Yes
premises that has not lapsed, if the development approval was for a development application that
___ Was made before 31 October 2006. __. _ _ oe. .
(xi) Isb being carried out in association with a development approval for a material change of use of Ono (Yes
premises that -
* was given for development made assessable under SEQ Regional Plan Regulatory Provisions,
section 2.4, 2.6, 2.8, 2.10, 2.12, or 2.14; and
* — has not lapsed
{xii) Is in a rural village as defined under the SEQ Regional Plan Regulatory Provisions LINo (Yes
{xiii) Is for a rural residentiat purpose for land located in the Mt Lindesay/North Beaudesert Study Area oO No ([] Yes
and -
+ _ the development application or development application (superseded planning scheme) for the
Subdivision is properly made before 2 March 2008; and
« _ the subdivision relates to land located in a zone or equivalent designated area mentioned in a
Notice published in the gazette by the regional planning Minister
(xiv) Is being carried out under - (CINo (J Yes
* an exemption given by the regional planning Minister for an application for exemption lodged
before 30 September 2005; and
* adevelopment approval for a development application that is properly made within six months of
the exemption being given by the regional planning Minister @
O Yes
(xv) Involves the extension of an existing lease or licence over land if - LCINo
«no additional lots are created; and
* any use permitted by a subsequent lease or licence is consistent with a use permitted by the
previous lease or licence; and
+ _ the previous lease was obtained before 31 October 2006
(xvi) Creates lots for a purpose or is being carried out in association with development other than those (()No [Yes
Stated in (i) — (xv) above
If yes to other development under {xvi} above - The subdivision is prohibited and an application involving that component cannot be made. Go to
(ii) on the next page of this Checklist.
Page 18
Page 33
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
SEQ REGIONAL! PLAN "con
(ii) For any part of the premises, does the relevant planning scheme state a minimum lot si size of greater than
100ha and is any lot resulting from the subdivision proposed to have a lot size less than that stated size?
11 No - Go 20 (iii) (1 Yes - Complete Table 2
TABLE 2 - Indicate whether or not the following circumstances apply to the subdivision proposal - (Tick it applicable)
The subdivision: . ee oe
(i) Creates a residual lot ~ eee oO No (Yes
(ii) Creates the same number or fewer lots than the number of lots being subdivided CNo (1 Yes
(ii) Creates a single additional lot when an existing lot is severed by a road ‘that was gazetted before 2 Lino Oo Yes
March 2006
(iv) Creates a single additional tot for an emergency services facility ee ee ke LI No . oO Yes
Wy) Creates a single additional lot for a water cycle management infrastructure CINo oO Yes .
{vi) Creates a single additional lot for waste management facility ee ETN CNo Yes”
(vii). Creates a single additional lot for telecommunications infrastructure ~ ONo [J Yes
(viii) Creates a single additional lot for electricity infrastructure
(ix), Creates a single additional lot forcemetery oracrematorium _
(x) Is being carried out in association with a development approval for a material chang of use of “O No -[] Yes
premises that has not lapsed, if the development approval was for a development application that
was made before 31 October 2006
(xi) Is being carried out in association with a development approval for a material change of use of (No (Yes
premises that -
* — was given for development made assessable under SEQ Regional Plan Regulatory Provisions,
section 2.4, 2.6, 2.8, 2.10, 2.12, or 2.14; and
« hasnotlapsed ee
(xii) Is in a rural village as defined under the SEQ Regional Plan Regulatory Provisions On O Yes
{xiti) Is for a rural residential purpose for and located in the Mt Lindesay/North Beaudesert Study Area and- LINo ‘Dives Yes
* — the development application or development application (superseded planning scheme) for the
subdivision is properly made before 2 March 2008; and
« — the subdivision relates to land located in a zone or equivalent designated area mentioned in a
notice published in the gazette by the regional planning Minister
(xiv) Is being carried out under - [LJNo (J Yes
« an exemption given by the regional planning Minister for an application for exemption todged
before 30 September 2005; and
« adevelopment approval for a development application that is properly made within six months of
the exemption being given by the regional planning Minister
(xv) Involves the extension of an existing lease or licence over land if - Ono [1] Yes
« no additional lots are created; and
* any use permitted by a subsequent lease or licence is consistent with a use permitted by the
previous lease or licence; and
« the previous lease was obtained before 31 October 2006
(xvi) Creates lots for a purpose or is being carried out in association with development other other than those oD No (1 Yes
_ Stated in (i) - (xv) above
If yes to other development under (xvi) above - The subdivision is prohibited and an application involving that component cannot be made. Go to
(iii) on the next page of this Checklist.
Page 19
Page 34
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
SEQ REGIONAL PLAN (con
(iii) For ail tots, other than those affected by (i) and (ii) above, is any lot resulting from the subdivision proposed to
have a lot size of less than 100 hectares?
[LI No -Gotooa12 ([] Yes - complete Table 3
TABLE 3 - Indicate whether or not the following circumstances apply to the subdivision proposal - (Tick i applicable)
The subdivision:
(i) Creates a residual lot _ - oO No ‘oO Yes
(li) Creates the same number or fewer lots than the number of lots being subdivided CONo [J Yes
(ili) Creates a single additional lot when an existing lot is severed by a road that was gazetted before2 [[]No (J Yes
March 2006
{iv) Creates a single additional lot for an emergency services facility On Yes
(v) Creates a single additional lot for a water cycle management infrastructure — oO No oO Yes |
(vi) Creates a single additional lot for waste management facility CINo - oO Yes
(vii) Creates a! single additional lot for telecommunications infrastructure — oO No 0 Yes
(viii) Creates a single additional lot for electricity infrastructure a Oo No CJ Yes
(ix) Creates a single additional lot for cemetery or a crematorium - oO No o Yes
(x) Is being carried out in association with a development approval for a material change of use of (no (1 Yes
premises that has not lapsed, if the development approval was for a development application that
was made before 31 October 2006 ®@
(xi) ts being carried out in association with a development approval for a material change of use of (ONo [1 Yes
premises that -
* — was given for development made assessable under SEQ Regional Plan Regulatory Provisions,
section 2.4, 2.6, 2.8, 2.10, 2.12, or 2.14; and
¢ — has not lapsed
(xii) Is in a rural village as defined under the SEQ Regional Plan Regulatory Provisions oO No Oves
(xiii) Is for a rural sesidential purpose for land located in the Mt Lindesay/North Beaudesert Study Areaand- [JNo [1 Yes
+ the development application or development application (superseded planning scheme) for the
subdivision is properly made before 2 March 2008; and
+ the subdivision relates to land located in a zone or equivalent designated area mentioned in a
notice published in the gazette by the regional planning Minister
(xiv) Is being carried out under - Ono O Yes
* an exemption given by the regional planning Minister for an application for exemption lodged
before 30 September 2005; and
* adevelopment approval for a development application that is properly made within six months of
the exemption being given by the regional planning Minister
(xv) Involves the extension of an existing lease or licence over land if - CINo [Yes
* no additional tots are created; and
* — any use permitted by a subsequent lease or licence is consistent with a use permitted by the
previous lease or licence; and @
+ — the previous lease was obtained before 31 October 2006
(xvi) Creates lots for a purpose or is being carried out in association with development other than those On O Yes
stated in (i) - (xv) above
If yes to other development under (xvi) above - The subaivision is prohibited and an application involving that component cannot be made. Go to
Q3.12
F
Page 20
Page 35
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
STATE PLANNING REGULATORY PROVISIONS (REGIONAL PLANS):2 icc |
3.11B | ls any part of the premises within a designated region under Schedule 1 of the draft regulatory provisions?
(CINo-Gowas12 (] Yes
It yes, is the application seeking approval for subdivision as defined in Schedule 2 of the draft regulatory provisions?
(I No -Go 10.03.12 ([) Yes - Answer both (a) and (b) below
(a) Is any part of the premises located within a master planned area and not included in a structure plan, to which section
3.1(1) of the draft regulatory provisions apply?
[LINo- Goto) () Yes
If yes, indicate whether or not the following circumstances apply to the subdivision proposal - (Tick fappficable)
The subdivision:
(i) Creates lots with a size greater than the number stated i in section 3.1(2)(a) of the draft Cinco (Yes
regulatory provisions? —
see ee
i) Creates a residual lot a as ‘define ined in Schedule 2 of the dratt reguiatory provisions [No (1 Yes
{iii} Creates a single additional lot under section 3. 1(2\(c) of the draft regulatory provisions oO No C1 Yes
(iv) Creates a single additional lot for an emergency services facility fn»o Dyes |
“(v) Creates a single additional fot for water cycle management infrastructure CINo L)Yes :
wi) Creates a single additional lot for a waste management facility oo : CINo oO Dives
-{vil) Creates a single additional lot for telecommunications infrastructure ~ oO Cinco [1Yes
(vii Creates a single additional lot for electricity infrastructure : , Cine (Yes
(ix) Creates a single additional lot for cemetery ‘ora crematorium oe CNo “OQ Yes .
(x) Is carried out in association with a development approval for a material change of use of [[] No " OlYes |
premises that has not lapsed, if the development approval was for a development : '
application that was made before the day the draft regulatory provisions for the
designated region took effect
‘Gi ls carried out in association with a development approval for a material change e oft use of CiNo [Yes
premises that - :
« was given for development made assessable under the draft regulatory provisions,
section 2.1 or 2.2; and
« hag notlapsed
(xii) Creates lots for a purpose or is being carried out i in association with development other other “oO No (1 Yes
than those stated in (i) - (xi) above
4
If yes to other development under (xii) above - This application must be referred to the Department of infrastructure and Planning
(DIP) as Concurrence Agency. Answer (b) on the next page of this Checklist
32 State Planning Regulatory Provisions (Regional Plans) are the draft regulatory provisions
Page 21
Page 36
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
STATE PLANNING REGULATORY PROVISIONS (REGIONAL PLANS) (con) _ mown
(b)_'s any part of the premises within the Regional Landscape and Rural Production Area or in the Investigation Area?
(I) No ~Gotoa3.12 (F) Yes - Answer (i) ~ (ii)
(i) _ Is any part of the premises located in a planning precinct as defined in Schedule 2 of the draft regulatory
provisions, and is any lot resulting from the subdivision proposed to have a lot size smaller than the minimum
Stated in the relevant planning scheme for the precinct?
LINo -Go 0) [Yes - Complete Table 1
TABLE 1 - Indicate whether or not the following circumstances apply to the subdivision proposal ~ (Tick i applicable)
The subdivision:
() Creates a residual lot as defined in Schedule 2 of the draft regulatory provisions 7 No DYes
(ii) Creates a single additional lot under section 3.2(2){b) of the draft regulatory provisions O No a Yes
(ii) Creates a sing! ie additional lot for an emergency services facility . CINo CJ Yes
wy) Creates a single additional lot for water cycle management infrastructure , D No oO Yes
W Creates a single additional lot for a waste management facility CONo (Yes
(wi) Creates a single additional lot for telecommunications infrastructure oO No oO Yes
(vii) Creates a single additional tot for electricity infrastructure CINo (L Yes
(viii) Creates a single additional lot for cemetery or a crematorium LINo (Yes
{ix)_ ls being carried out in association with a development approval for a material change of use of (No (Yes e
premises that has not lapsed, if the development approval was for a development application that
was made before the day the draft regulatory provisions for the designated region took effect oe ae
(x) Is being carried out in association with a development approval for a material change of use of Ono (£) Yes
premises that -
* — was given for development made assessable under the draft regulatory provisions, section 2.4,
2.6, 2.8, 2.10, 2.12, or 2.14; and
+ hasnot lapsed
Gi) Is in a rural village as defined in Schedule 2 of the draft regulatory provisions go No o Yes
(xii) Is for a rural residential purpose as defined in Schedule 2 of the draft regulatory provisions, and - [CINo [)Yes
+ the development application or development application (superseded planning scheme) for the
subdivision is properly made within two calendar years from the day the draft regulatory
provisions for the designated region took effect; and
« — the subdivision relates to land located in a zone listed in Schedule 1 Table 3 of the draft
regulatory provisions for the designated region
(xiii) Involves the extension of an existing lease or licence over land if - [No [1 Yes
* no additional lots are created; and
* — any use permitted by a subsequent lease or licence is consistent with a use permitted by the
previous lease or licence; and
+ _ the previous lease was obtained before the day the draft regulatory provisions for the
designated region took effect @
(xiv) Is development that is - CNo [1 Yes
* — declared to be a significant project under section 26(i}(a) of the State Development and Public
Works Organisation Act 1971 or located in a State development area: and
* confirmed in writing by the Regional Planning Minister to be exempt from these draft regulatory
provisions
(xv) Creates lots for a purpose or is being carried out in association with development other than those ([] No C1 Yes
stated in (i) - (xiv) above .
If yes to other development under (xv) above - The subdivision is prohibited and an application involving that component cannot be made. Go to (ii)
Page 22
Page 37
INTEGRATED PLANNING ACT 1997 IDAS Assassment Checklist, Version 21.3, 9 May 2008
(i) For any part of the premises, does the relevant planning scheme state a minimum fot size of greater than the
number stated in section 3.2(1)(a) of the draft regulatory provisions and is any lot resulting from the subdivision
proposed to have a lot size less than that stated size?
(INo - Goto fii) (1 Yes - Complete Table 2
TABLE 2 - indicate whether or not the following circumstances apply to the subdivision proposal - (Tick if appficable)
The subdivision; a .
0 Creates a residual lot as defined in Schedule 2 of the draft regulatory provisions , _ £1 No Oo Yes
{ii} Creates a single , additional lot under section 3. 2(2)(b) of the draft regulatory provisions i ~ EINo LO Yes
(ii) Creates a single additional lot for an emergency services facility (Nc L] Yes
{iv} Creates a single additional lot for water cycle management infrastructure __ [ino L1 Yes
(v) Creates a single additional lot for a waste management facility TT Oo No im] Yes
(vi)_ Creates a single additional lot for telecommunications infrastructure : ae LINo (1 Yes
(vii) Creates a single additional lot for electricity infrastructure oO : [No Bono (Yes
“(viiil) Creates a single additional lot for cemetery or a crematorium ~ DNo O Yes
(ix) Is being carried out in association with a development approval for a material change of use of — a No : a Yes
premises that has not lapsed, if the development approval was for a development application that
was made before the day the draft regulatory provisions for the designated region took effect 7
'(x)_ Is being carried out in association with a development approval for a material change of use of (no [1] Yes
premises that -
* — was given for development made assessable under the draft regulatory provisions, section 2.4,
2.6, 2.8, 2.10, 2.12, of 2.14; and
« — has not lapsed
Sa shhh eee tn.
(xi) Is in a rurat village as defined in Schedule 2 of the draft regulatory provisions ne O Yes.
(xi) \s for a rural residential purpose as . defined in Schedule 2 of the draft regulatory provisions and - 7 oO No ‘Oo Yes 3
+ _ the development application or development application (superseded planning scheme) for the
subdivision is properly made within two calendar years from the day the draft regulatory
provisions for the designated region took effect ; and
« _ the subdivision relates to land tocated in a zone listed in Schedule 1 Table 3 of the draft
regulatory provisions for the designated region
(xiii) Involves the extension of an existing lease or licence over land if- | No. 0 Yes
* — no additional lots are created; and
* any use permitted by a subsequent lease or licence is consistent with a use permitted by the
previous lease or licence; and
+» the previous lease was obtained before the day the draft regulatory provisions for the designated
region took effect
(xiv) Is development that is - (Ne (Yes
« — declared to be a significant project under section 26(i)(a) of the State Development and Public
Works Organisation Act 1971 or located in a State development area; and
* — confirmed in writing by the Regional Planning Minister to be exempt from these draft regulatory
provisions
(0) Creates lots for a purpose or is being carried out in association with development other other than those Oo No oO Yes
stated in (i) - (xiv) above
If yes to other development under (xv) above - The subdivision is prohibited and an application involving that component cannot be made. Go to
(i)
Page 23
Page 38
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2608 STATE PLANNING REGULATORY PROVISIONS (REGIONAL PLANS) (cont) (ii) For all tots, other than those affected by (i) and (ii) above, is any tot resulting from the subdivision proposed to have a lot size of less than the number stated in section 3.2(1}(c) of the draft regulatory provisions? [No -Gotoa312 (] Yes - Complete Table 3 TABLE 3 - indicate whether or not the following circumstances apply to the subdivision proposal - (Tick if applicable) The subdivision: (i) Creates a residual lot as defined in Schedule 2 of the draft regulatory provisions LINo [J Yes (ii) Creates a single additional lot under section 3.2(2)(b) of the draft regulatory provisions CINo (1 Yes (iii) Creates a single additional lot for an emergency services facility O No OO Yes (iv) Creates a single additional lot for water cycle management infrastructure oS Oo No L1 Yes (v) Creates a Single additional lot for a waste asie management facility Lino (Yes (vi) Creates a single additional lot for telecommunications infrastructure ~ o No “Ci ves , (vil) Creates a single additional lot for electricity ‘infrastructure — oO No “Dyes (viii) Creates a single additional lot for cemetery or a crematorium LI No oO Yes (ix) Is being carried out in association witha development approval for a material change of use of CNo O Yes premises that has not lapsed, if the development approval was for a development application that was made before the day the draft regulatory provisions for the designated region took effect . (x) Is being carried out in association with a development approval for a material change of use of Ono (J Yes premises that - * was given for development made assessable under the draft regulatory provisions, section 2.4, 2.6, 2.8, 2.10, 2.12, or 2.14; and e _has not lapsed “(xi) Isina rural village as defined i in Schedule 2 of the dralt regulatory | provisions : CINo | Yes (xii) [s for a rural residential pu purpose as defined in Schedule 2 of the draft regulatory provisions and - CINo [1] Yes * _ the development application or development application (superseded planning scheme) for the subdivision is properly made within two calendar years from the day the draft regulatory provisions for the designated region took effect; and « _ the subdivision relates to land located in a zone listed in Schedule 1 Table 3 of the draft regulatory provisions for the designated region (xii) Involves the extension of an existing lease or licence over land if - (No [J Yes * no additional lots are created; and * any use permitted by a subsequent lease or licence is consistent with a use permitted by the previous lease or licence; and * _ the previous lease was obtained before the day the draft regulatory provisions for the designated region took effect _ (xiv) ls development that is — CINo (Yes * — declared to be a significant project under section 26(i)(a) of the State Development and Public Works Organisation Act 1971 or located in a State development area; and « confirmed in writing by the Regional Planning Minister to be exempt from these draft regulatory provisions (xv) Creates lots for a purpose or is being carried out in association with development other than those [_]No [1] Yes _Stated i in (i)- ~ (xiv) above If yes to other development under (xv) above - The subdivision is prohibited and an application involving that component cannot be made. Go to Q 3.42 ° Page 24
Page 39
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checkfist, Version 21.3, 9 May 2008
KOALA CONSERVATION.
3.12 | Is any part of the premises in a koala conservation area or koala sustainability area?
(No -Gowa313 (Yes
IF yes, will the proposed reconfiguration result in the following?
(i) Anincreased number of lots Ne CO Yes
(ii) Clearing of native vegetation over an area greater than 2,500m? Ono CO Yes
If yes to either or both of (i) or (ii) above - this application must be referred to the Environmental Protection Agency (EPA) as Concurrence Agency.
Foye 2.) ete 2 ate? 17 33
CANAL DEVELOPMENT
3.13 |!s the proposed reconfiguration in connection with the construction of a canal?
(No - Go to. 03.14 (L] Yes - (Complete Form 1, Part M) This application must be referred to the Environmental Protection Agency (EPA) as Concurrence
Agency.
P Roguianon, schvarie 2 tating 2 tem tbe
DECLARED CATCHMENT AREA __
3.14 | Is the proposed reconfiguration in an area declared to be a catchment area under the Water Act 2000?
[LINo-Gotoaa15 (] Yes
If yes, is any lot resulting from the reconfiguration proposed to be less than 16ha?
CI No 1 Yes - This apptication must be reterred to the Department of Natural Resources and Water (NRW) as Concurrence Agency.
Fag anon sone. 2 fave 2 torn 1?
PUBLIC PASSENGER TRANSPORT
3.15 _| ls the proposed reconfiguration listed in schedule 13A of the inlegrated Panning Regulation 1998 and does it exceed the specified threshold?
oO No - Go to 03.16 oO Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
IP Regu atin, scredue 2, tabie 2, tem 30: P Aeguiaien schodu.d 1JA
RAIL TRANSPORT
3.16 | Is the proposed reconfiguration listed in schedule 13B of the riegrated Paming Regulation 1998 and does it exceed the specified threshold?
CNo-Gotoaa17 ([] Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
‘P Faguiation, sonadus 2 ‘ave 2. te 31 IP Roguaton schedue 123
WETLAND; CONSERVATION ESTATE
3.17 | Does the proposed reconfiguration result in more than 10 lots or any "ot 1855 than 5ha in area?
[No -Gotoa318 (7) Yes - Answer (a) and (b) below
(a) Does the proposed reconfiguration involve a lot situated in, or within 100m of, a wetland shown on the ‘Map of referable
wetlands’?
O)No (2) Yes - This application must be referred to the EPA as Advice Agency.
(b) Does the reconfiguration involve a lot situated in, or within 100m of, the following?
{i) A protected area, forest reserve, critical habitat or area of major interest under the Nature
Conservation Act 1992 ; CINo C1 Yes
ii) A State forest of timber res reserve under the Forestry Act 1959. i , , ‘oO No Go Yes :
(iti) A marine park under the Marine Parks Act 2004 - : a o ‘No Oo Yes
iv) A recreation area under the Recreation Area Management Act 1988 . - oo ‘No No oO Yes :
(v) Aworld heritage area listed under the World Heritage Convention ee ONo CJ Yes
(vi) Brisbane forest park under the Brisbane Forest Park Act 1977 ; (No 1 Yes
If yes to any one of (i} - (vi) above - this application must be referred fo the Queensland Govemment department administering the relevant Act
mentioned as Advice Agency
'P Reguaauen, scredu'd 2, tad 2, tems 28 ard 39.
HERITAGE _
3.18 | Does the proposed reconfiguration involve a lot sharing a common boundary with a Queensland Heritage place under the
Queensland Heritage Act 1992?
oO No - End of Section 3 oO Yes - This application must be referred to the Environmental Protection Agency (EPA) as Advice Agency. - End of
Section 3
P Reguiaton, schodue 2, unre 2, ten $t
WILD RIVER AREA - Atthough legislation provides for assessment of lot reconfiguration for the purposes of tha Wild Rivers Act 2005, currently no declarations for any of
the wild river areas apply the Wild Rivers code to that type of development.
Page 25
Page 40
THIS PAGE HAS BEEN DELIBERATELY LEFT BLANK TO FACILITATE” DOUBLE SIDED PRINTING/ PHOTOCOPYING Page 26
Page 41
INTEGRATED PLANNING ACT 1997 IDAS Assassment Checklist, Version 21.3, 9 May 2008
SECTI O N 4 Section 4 Must be completed when the application seeks approval to carry out operational work.
[PLANNING SCHEME az j az —
41 ‘s any of the proposed operational work assessable under a planning scheme?
CINo - Go t0.04.2 (1 Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below.
STATE-CONTROLLED ROAD _ ;
4.1.1 |ts any part of the premises located in part of a future State-controfled road, or within 100m of a State-controlled road?
CINo
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998, schedule 5 and
does it exceed the threshold?
gO No Oo Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(Yes
If yes, is all of the proposed operational work associated with the following?
{i) A material change of use that is assessable under the planning scheme Ono (Yes
(ii) Reconfiguring a tot that increases the total number of lots, or increases the total number of lots (No (L1Yes
abutting the State-controlled road
If no to either or both (i) or (ii) above - Answer (a) - (c) below
(a) Is any of the proposed operational work associated with access to a State-controlled road?
oO No Oo Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
{b) Is any of the proposed operational work for filling or excavation?
LINo Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
0 No - This application must be referred to the Department of Main Roads (OMA) as Concurrence Agency
(C1 Yes - This application must be referred to DMR as Advice Agency.
(c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
LINo Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
Oo No - This application must be referred to the Department of Main Roads (OMR) as Concurrence Agency.
(1 Yes - This application must be referred to DMR as Advice Agency.
'P Reguiatun, schedule 2. tabie 3. ‘tem 3 IP Regu'azon. schedule 2. tabie 3. tom 110).
ACID SULFATE SOILS. .
4.1.2 |\s any of the operational work proposed in a local government area listed! in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils?
CI No -Gotoas1.3 (1) Yes
If yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
LJ No O Yes
if yes, does the proposed operational work involve the following?
{i) Excavating more than 1,000ms of soil or sediment at or below 5m AHD . [JNo (Yes
(ii) Filling the premises with 1,000ms or more of material with an average depth of 0.5m on Cno [Yes
land, soil or sediment at or below 5m AHD
If yes to either or both (i) or (ii) above - This application must to be referred to the Department of Natural Resources and Water (NRW) as
Advice Agency
P Aagu‘znor. scnach 2 2 table 3 foe State Planritg Poecy 202: Canning and Managing 2aveloprent ry wing Aca 3 30's. section 3.3
+1 Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cootoola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Marcochy, Maryborough, Miriam Vale, Momington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
Page 27
Page 42
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 21.3, 9 May 2008
EASEMENTS AND SUBSTATIONS
4.1.3 | Is any of the proposed operational work for filling or excavation?
(CINo-Getoos:4 (Yes
ILyes, is the filling or excavation associated with reconfiguring a lot?
0 Yes (1 No - Answer both (a) and (b) below
(a) ls any part of the premises subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994?
) Ol Yes
yes, is any of the operational work proposed to be located in any part of the easement?
CI No (1 Yes - This application must be reterred to the entity as Advice Agency.
{b) {Is any of the operational work proposed to be located within 10m of a substation site under the Electricity Act 1994?
CINo C1 Yes - This apptication must be relerred to the entity responsible for the subsiation as Advice Agency.
PA tum at | tems bmn PB Roque ged Lut tthe ite
4.1.4 |Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the Petroleum
Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
(No -Gowos.15 (1) Yes
If yes, is any of the proposed operational work for filing, excavation, compaction, drilling, boring or piping, not associated with
reconfiguring a lot?
CINo OO Yes
Ityes, is any of the operational work proposed to be located in any part of the easement?
No oO Yes - This application must be referred to the licence holder as Advice Agency.
Deke dt > ht 2 Ie 2 te
PUBLIC PASSENGER TRANSPORT
415
Is any of the proposed operational work listed in schedule 13C of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
CI No - Go 04.1.6 (2 Yes - This apptication must be referred to Queensland Transport (QT) as Concurrence Agency.
-P Regu.aton schady'2 2 tabla Jodem tt
RAILWAY SAFETY AND EFFICIENCY
4.1.6 | Is any of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
oO No ~ Go to 04.1.7 0 Y@S - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
P Rogue tna) schatw 2 tang Yar te
KOALA CONSERVATION oo — ,
4.1.7 |\s any part of the premises in a koala conservation area or koala sustainability area?
CINo - Gowos2 Yes
If yes, is all of the proposed operational work associated with a material change of use or reconfiguring a lot for which referral
is required in relation to koala conservation (i.e. did you answer ‘yes’ to ail questions in either Q2.1.8 or Q 3.12)?
C1 Yes - Go to 04.2 (No
Ino, is the proposed operational work for a domestic activity, as defined by the Environmental Protection Act 1994?
(Yes -Gotoo4.2 [No
If no, will the activity result in the following?
(i) Clearing of native vegetation over an area greater than 2,500m? Oo No O Yes
(ii) Extracting gravel, rock or sand from an area greater than 5,000m? go No | O Yes
|_ Excavating or filling an area greater than 5,000m? oO No O Yes
If yes to one or more of (i) ~ (iii) above - This apptication must be relerred to the Environmental Protection Agency (EPA) as
Concurrence Agency.
PA wah seo tk
\ WILD RIVER AREA ~ Athough logistaton provides for assessment of operational works for residental, commercial and indusiial development for the purposes of the
| Wed Rivers Act 2005, currently no dectareons for any of the wid river areas apply the Wed Rivers code to that type of development. .
Page 28
Page 43
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
AREA’
ASSOCIATED WITH RECONFIGURING’A LOT; RESIDENTIALY COMMERCIAL’ OR INDUSTRIAL’ DEVELOPMENT IN A WILD RIVER
42
Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
(No -cowo13 =} Yes
It yes, is any part of the premises in a wild river area declared under the Wild Rivers Act 2005?
0 No - (Complete Form 1. Part E) The operational work associated with reconfiguring is assessed by the local govemment
(J Yes
If yes, is the proposed operational work for residential, commercial or industrial purposes outside a designated urban area,
as defined by the Wild Rivers Act 2005?
oO No - (Complete Form 1, Part E) The operational work associated with reconfiguring is assessed by the local government.
Oo Yes (Complete Form 1, Part E) The operational work associated with reconfiguring is assessed by the local goverment, and subject to the
declaration for the relevant wild river area, assessment by the local govemment is required for the purposes of the Wild Rivers Act 2005.
PA, screctne 3 pat fable 4. t2m 2:/? Aogulanon schedule ' pant 2 ‘able Stemi ter Wid Savers code ‘Neva che coca oes tet Jaren ty 207t2in apoacacie orowsicrs ‘or esidental,
NcustN.N # cCoMMenial Jevewmomer Je 2 designated ufban 3124).
VEGETATION CLEARING: KOALA CONSERVATION: WILD RIVER AREA (ii
4.3
Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999 applies?
(CINo-Gotooss ()Yes
Ityes, is the proposed clearing assessable (i.e. not an exception) under schedule 8, part 1, table 4 of the IPA?
LINo-Gotoass (lYes
If yes, is the proposed vegetation clearing a relevant purpose under the Vegetation Management Act 1999, section 22A
for one or more of the following?
{i) A project declared to be a significant project under the State Development and Public Works Ono (Yes
Organisation Act 1971, section 26
(ii) _ Necessary to control non-native plants or declared pest ; Ono OYes
(ii), To ensure public safety oo C}No Ces”
(iv) For establishing a necessary fence, firebreak, road or vehicle track, or for constructing ‘CONo (Yes
necessary built infrastructure, if there is no suitable alternative site for the fence, firebreak,
road, track or infrastructure _. _
(v) Anatural and ordinary consequence of other assessable development for which a Lino [Yes
development approval as defined under the Planning Act was given, or a development
application as defined under the Planning Act was made, before 16 May 2003.
(i) For fodder harvesting _ _ “CNo_ oO Yes
(vii) For thinning oe : : ‘Od No Ove Yes,
(viii) For clearing of of encroachment a “oO No. oO Yes”
_(ix}, For an extractive industry ae -CINo -[} Yes
(x) For clearing regrowth on leases issued under the Land Act 1994 for agriculture or grazing “DONo OYes
purposes .
(xi) For clearing regrowth or on freehold land, or indigenous land, in: ina a wild river high preservation CINo ‘Di Yes
area.
If no to all (i) ~ (xi) above - The clearing is not a relevant purpose and the Assessment Manager must refuse to receive the application.
If yes to any one of (i) - (xi} above, is the proposed clearing associated with a material change of use or reconfiguring a
lot for which referral is required in relation to clearing vegetation (ie. did you answer ‘yes’ to all questions in either Q2.1.4 or 3,3)?
C1 Yes - Go to. 04.4
O No - Answer (a) (b) and (c} on the next page of this Checklist.
Page 29
Page 44
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA (con) _. _
{a) _ ts any of the proposed clearing in an area declared as an area of high nature conservation value (other than a
wild river high preservation area) or an area vulnerable to land degradation under the Vegetation Management
Act 1999?
oO No - Complete Form 1, Part J. This application requires assessment by the Department of Natural Resources and Water (NRW). If
O y NRW is not the Assessment Manager, the agency has jurisdiction as Concurrence Agency.
es
li yes, is any of the proposed clearing for (v), (vi), (ix) or (x) above?
O No - Complete Form 1, Part J. This application requires assessment by the Deparment of Natural Resources and Water
. (NRW). if NRW is not the Assassment Manager, the agency has jurisdiction as Concurrence Agency.
Yes - The clearing 1s not a relevant purpose and the Assessment Manager must refuse to receive the application
(b} Is any of the proposed clearing in the high preservation area of a declared wild river area?
O No - Complete Form 1, Part J. This application requires assessment by the Department of Natural Resources and Water (NRW). If
NRW is not the Assassment Manager, the agency has jurisdiction as Concurrence Agency.
(Yes
If Yes, is any of the proposed clearing for the following purposes? ek
(i) For (i), (vi), (vil) oF (ix) above Clo , (1 Yes__
(ii) For (x) or (xi) above and in a high preservation area outside of a LINo (1Yes
registered area of agriculture as defined under the Vegetation
Management Act 1999 Lee
Ifno to either or both (i) or (il) above ~ Subject to the dectaration for the relevant wild river area, the application
requiras assessment for the pumposes of the Wild Rivers Act 2005 - Complete Form 1, Part J. This application
requires assessment by the Department of Natural Resources and Water (NRW), If NRW is not the Assessment
Manager, the agency has jurisdiction as Concurrence Agency.
If yes to either or both (i) or (ii) above, is there a property development plan approved under the Wild
Rivers Act 2005 applying to the land?
| No - The clearing is not a relevant purpose and the Assessment Manager must refuse to receive the application.
oO Yes - Unless the application is consistent with any approved property development plan applying to the land, the
Assessment Manager must refuse to receive it, Subject to the declaration for the relevant wild river area, the
application requires assessment for the purposes of the Wild Rivers Act 2005 ~ if an application is made
complete Form 1, Part J. This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRW is nol the Assessment Manager, the agency has jurisdiction as Concurrence Agency.
(c)__ Is any of the proposed clearing in a koala conservation area or koala sustainability area?
(No - Goto 04.4 D1 Yes
Ifyes, is any of the proposed clearing associated with reconfiguring a {ot for which referral is required in
relation to proposed clearing in a koala conservation area or koala sustainability area (i.e. did you answer
‘yes’ to all questions in Q3.12)?
(J Yes-Gowas [No
If no, is any of the proposed clearing over an area greater than 2,500m2?
CI No - Go to 04.4
oO Yes - This application must be referred to the Environmental Protection Agency (EPA) as Concurrence
Agency.
Page 30
Page 45
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
TAKING OR INTERFERING WITH WATER; WILO RIVER APE A
4.4 | Is any of the proposed operational work for any thing constructed or installed thal allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water, and other than under the Water
Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
DINo - Goto 04.5 LO Yes - Answer (a) and (b) befow
(a) Are the operations mentioned as self-assessable development in the following?
(i) A water resource plan under the Water Act 2000 (ONo (Yes
(ii) A wild river declaration under the Wild Rivers Act 2005 [_] No 1 Yes
{iii) A regulation under the IPA or the Water Act 2000 (No C1 Yes
If no to all of (i) to (iii) above - This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. Go to {b)
(b} Is any of the proposed operational work to be carried out in a wild river area under the Wild Rivers Act 2005?
OJ Yes
if yes, is the work for the following?
“@ “Awater pump a ; TLINo 1 Yes (Complete For t, Part Ka) _
(i) Water storage : : - “TENo LD Yes (Gomptete Form 1, Part Ky)
ii m ~ "EY No (C1 Yes ¢comptete Form 1, Part K:)
(iv) Watercourse diversion ST CINo 1 Yes (Complete Form 1, Part Ks) _
_(v)_ Other work for taking or interfering with water _ | Yes (Complete Form 1, Past Ko) —
If yes to any one of (i) to (v) above - if any part of the proposal relates to operational work thal interferes with water in a high preservation
area, or in a nominated waterway (other than for a dam or weir), the application will be taken to be nat properly made and the Assessment
Manager must refuse to receive it, All other proposals are subject to the declaration for the relevant wild river area, and assessment may
be required for the purposes of the Wild Rivers Act 2005. The application will require assessment by the Department of Natural Resources
and Water (NRW), If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
(Complete the relevant Form |, Part K as indicated in the table above if an application is made.)
[EINo
is the work forthe following? Coe oe -
) Awaler pump ee ~"TNno C1 Yes (Complete Form 1, Patt Ko)
{ii} Water storage _. “CNo — (] Yes (Complete Form 1, Part Ks}
(ii) Gravity diversion from a watercourse : _ No _ oO Yes (Complete Form |, Part K.)
(iv) Watercourse diversion — - _ ICI No C1Yes (Compete Fo Form |, Part Ke) .
{v) Other work for taking or interfering with water ~~ “TINo No “Oye Yes (Complete Form 1, Part Ko)
If yes to any one of (i) to (v) above - The application will eequire assessment by the Department of Natural Resources and Water (NAW). if NRW
is not the Assessment Manager for the application. the agency has jurisdiction as Concurrence Agency.
(Complete the relevant Form 1, Past K as indicated in the table above.)
IPA sePecu 23 cart
wea. 0 Wass
2 abies 2. tem 3, (P Regs.aton. schedtia { 2a 3 tage t toms Jand Jd Mater Act Nee sectan 266A wie ever
on Wil Bows Vode
45 — |\s any of the proposed operational work for any ny thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
No - Goo 04.6 7 Yes - (Complete Form 1, Part Ki) This application requires assessment by the Department of Natural Resources and Water (NRW). if
N&Wis not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
‘PA genet 32.
the sede does 72!
sat tiple 2 tert 13.22. op schodice 2. abe 2 fam 4 IP Agu:
‘nily Contam acaicable arovisions for faxing ar interfonng wath arioswin 3
wud \2F teciaagur Wid vos Soda Nev.
Page 31
Page 46
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 21.3, 9 May 2008
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (coninued) _
4.6 _|\s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water}?
(No - Goto 04.7 C1 Yes - Answar (a) and (b} below
(a) Are the operations mentioned as assessable development in the following?
(i) Avwater resource plan under the Water Act 2000 CINo Yes
(ii) A regulation under the IPA or the Water Act 2000 [No 0 Yes
If yes to either or both of (i) or (ii) above - (Complete Form 1, Part Kz). This application requires assessment by the Department of Natural
Resources and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
(b) Is any of the proposed operational work mentioned as assessable in a wild river declaration and to be carried out in a wild
river area declared under the Wild Rivers Act 2005?
oO No oO Yes - if any part of the proposal relates to operational work in a high preservation area other than works stated in a wild river
declaration for the area to be assessable development for which a development application may be mada, the application will
be taken lo be not properly made and the Assessment Manager must refuse to receive it, All other proposals are subject to the
declaration for the relevant wild river area, and assessment may be required for the purposes of the Wid Rivers Act 2005.
(Complete Form 1, Part Kaif an application is made.)
PA .ueh atosgt cared dem 3s. 8 Fagus sensane Page peg DP aaguarts seagate acd nt) Aas det sete ORT ed eae aa
Sees dul OT ADA pena wor Jot alee og Awe, A.
4.7 | Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)? e@
[INo-Gowass ([)Yes
It yes, are the operations mentioned as assessable development in the following?
(i) Avwater resource plan under the Water Act 2000 CINo (J Yes
(ii) A regulation under the IPA or the Water Act 2000 LINo D1 Yes
if yes to either or both of (i) or (ii) above - (Complete Form 1, Part K.} This application requires assessment by the Department of Natural
Resources and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
PL het. het Ca seein GA er ova Neto eo. oot va
OMe er cs carg 2 x rete. LP sei CaPE Sd 4.2 MEW BOAT Os ee usar "itor
48
Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for interfering
with overland flow water (other than using a water truck to pump water)?
[No - Goto 049 17 Yes - Answer both (a) and (b) below
(a) 1s the proposed operational work to be carried out in a floodplain management area of a wild river area declared under the
Wild Rivers Act 2005?
O Yes
If yes, indicate what the proposed operational work relates to
{i) Specified works for the area LI No C1 Yes
{ii) Work state in the relevant wild river declaration to be (No 0 Yes
assessable development for which an application may
be lodged - @
If yes to either or both of (i) or {li} above - (Complete Form 1, Part K:o Subject to the declaration for the relevant witd river area, assessment
may be required for the purposes of the Wild Rivers Act 2005)
If no to both {i) and (ii) above - the application will be taken to be not properly made and the Assessment Manager must refuse to receive it.
LINo
If no, are the operations mentioned as assessable development in the following?
(ii) A water resource plan under the Water Act 2000 Ono C1 Yes
(iv) A regulation under the IPA or the Water Act 2000 LJ No 0 Yes
If yes to either or both of (i) or (ii) above - (Complete Form 1, Part Kio) This application requires assessment by the Department of Natural
Resources and Water (NAW). If NAW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
(b) Is the interfering with overland flow water proposed in an area declared under the Water Act 2000 to be a drainage and
embankment area (other than a wild river floodplain management area) and declared to be assessable under that Act?
Oo No oO Yes - (Complete Form 1, Part Kio) This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRW is not the Assessment! Manager for the application, the agency has jurisdiction as Concurrence Agency.
ps a
a
Page 32
Page 47
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
TAKING OR INTERFERING WITH WATER: WILD RIVER AREA
4.9 |!s the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 (No [Yes
(i) To increase the storage capacity of a referable dam by more than 10% (No (Yes
If yes to either or both of (i) or (ii) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and
Water (NAW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
PA Sod Jost Ki 2 PAY rue atom ol] ae? oy
| TIDAL WORK; WILD RIVER AREA'
4.10. |Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
[No -Gotoas11 (7) Yes ~ Answer (a) and (b} below
(a) _ Is any of the proposed tidal work prescribed tidal work?
C1 Yes
It yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild Rivers
Act 2005?
CONo ee
If no, is the work proposed in a canal?
ONo
{f no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
Oo No - (Complete Form 1, Part P). If the Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensland
Transport (Maritime Sately Qid) as Concurrence Agency.
oO Yes - (Complete Form 1, Part P). if the Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensland
Transport (Maritime Safety Qld) as Concurrence Agency and Qld Fire and Rescue Service as Advice Agency.
Yes
It yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?
oO No - (Complete Form 1, Part P). This application must be referred to Queensland Transport (Mantime Safety Qld) as
Concurrence Agency.
oO Yes - (Complete Form 1, Part P). This application must be referred to Queensland Transport (Mantime Safely Qld) as
Concurrence Agency and Qld Fire and Rescue Service as Advice Agency.
C1 Yes .
If yes, is all of the proposed prescribed tidal work for specified works under the Wild Rivers Act 2005?
CINo- An application for the operational work will be taken to be not properly made and the Assessment Manager must
refuse to receive it.
01 Yes
If yes, is the work proposed in a canal?
LJ No
If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
oO No - Unless the application is consistent with any property development pian applying to the land. the Assessment
Manager must refuse to receive it. (Complete Form 1, Past P) If the Environmental Protection Agency (EPA) is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency
and assessment lor the purposes of the Wild Rivers Act 2005.
Oo Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment
Manager must refuse to receive it. (Complete Form 1, Part P) if the Environmental Protection Agency (EPA) is
nol the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency
and Qid Fire and Rescue Semice as Advice Agency. Subject to the declaration for the relevant wild river area, the
application also requires assessment for the purposes of the Wild Rivers Act 2005.
(Yes
If yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?
oO No - Unless the application is consistent with any property development plan applying to the land, the Assessment
Manager must refuse to receive it. (Complete Form 1, Part P) This application must be referred to Queensland
Transport (Maritime Safety Qld) as Concurrence Agency. Subject to the declaration for the relevant wild river
area. the application also requires assessment for the purposes of the Wild Rivers Act 2005.
oO Yes - Unless the application is consistent with any property development plan applying to ihe land, the Assessment
Manager must refuse fo receive it. (Complete Form 1, Part P) This application must be referred to Queenstand
Transport (Maritime Safety Qid) as Concurrence Agency and Qld Fire and Rescue Service as Advice Agency.
__ The application also requires assessment for the purposes of the Wild Rivers Act 2005.
(J No - Go io the first question on the next page of this Checktist
Page 33
Page 48
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 21.3, 9 May 2008
| TIDAL WORK; WILD RIVER AREA (consnuea)
If no, is any of the proposed tidal work to be carried out in a wild river area declared under the Wild Rivers Act 2005?
OYes
Ityes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
No - An application for the operational work will be taken to be not properly made and the Assessment Manager must
refuse to receive it.
CJ Yes
yes, is any of the proposed tidal work for a marina with more than 6 vessel berths? —__
No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager
must refuse to receive it. (Complete Form 1, Part M) This application requires assessment by the Environmental Protection
Agency (EPA). lf EPA is not the Assessment Manager for the application. the agency has jurisdiction as Concurrence
Agency. The application also requires assessment by Queensland Transport (Maritime Safely Qld) as Concurrence Agency
and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wid Rivers Act 2005.
i) Yes - Uniess the application is consistent with any property development plan applying to the land. the Assessment Manager
must refuse to receive i. (Complete Form 1, Part M) This application requires assessment by the Environmental
Protection Agency (EPA). if EPA is not the Assessment Manager for the application. tha agency has jurisdiction as
Concurrence Agency. The application also requires assessment by Queensland Transport (Maritime Safety Ota) as
Concurrence Agency and Old Fire and Rescue Service as Advice Agency. Subject to the declaration for the relevant wild
fiver area, the application also requires assessment for the purposes of the Wild Rivers Act 2005.
LINo
If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
oO No - (Complete Form 1, Part M) This application sequires assessment dy the Environmental Protection Agency (EPA). if EPA
is nol the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensland Transport (Maritime Safely Qld) as Concurrence Agency.
O Yes - (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). If EPA
is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency) and Qld Fire and
_ _. . Rescue Service as Advice Agency. __ .
{b) _ |s any of the proposed tidal work to be carried out in one or more of the following tidal areas?
(i) One only focal government tidal area CiNo [1 Yes
(ii) Starting in one local government tidal area and extending into another local government tidal []No [1] Yes
area (but in no strategic port tidal area) __.
(iii) In two or more local government tidal areas but not starting in either local government tidal area (JNo [] Yes
{iv) One only strategic port tidal area CINo (Yes
EN a ee + At
(v) A tidal area that is not a strategic port tidal area or a local government tidal area : CINo (J Yes ‘
Note: The answers you provide in (i) - (v) above may affect who the Assessment Manager is for the application.
Pa q mT Pett es tt sg bem Rt te te Hom 2, Fonat
Dogtra
Page 34
Page 49
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
COASTAI MANAGEMENT DISTRICT: WILD RIVER AREAS
4.44
Is any of the operational work proposed to be carried out within a coastal management district?
(No -cowos12 [Yes
If yes, is the proposed operational work for the following?
(i) Interfering with quarry material on State coastal land above high- |-water mark Oo No o Yes
(i) Disposing of dredge spoil or other ther solid waste material in tidal waters Oo No (Yes
(ii), Draining or allowing drainage or flow water or other matter across Slate costal land above high-water oO No CI Yes
mark
(iv) Constructing or installing works i in a ‘watercourse where the works are not assessable under IPA, CINo (J Yes
schedule 8, part 1, table 4, items 3 or4
(vy). Reclaiming land under tidal waters
(vi). Constructing an artificig cial waterway, 0
acanal, associated with reconfi iguring a fot a O No : Oo Yes :
vii) Constructing ana an
c canal, associated with reconfiguring a lots oO No [Yes
(vill Constructing an n artificial waterway not associated with reconfiguring a fot on land, other than Stale (No (Yes
coastal | land, above high-water if the maximum surface area of water on the waterway is at least 5 000m?
(ix) Constructing a bank or bund wall to establish a ponded pasture on land, other than State coastal land, oO No. (Yes
above high-water mark
(x) Removing or ‘interfering with coastal dunes on land, other than State coastal | land, that is in an erosion — oO No oO Yes
_ prone area and above high-water m mark _
If yes to one or more of (i) - (x) above, is any of the proposed wi work to be carried out in a wild river area under the Wild Rivers Act
2005?
Oo No - (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). if EPA is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency. If yes, above, to any shown bold and marked with the symbol #,
o the application also requires assessment by Queensland Transport (Marine Safety Qld) as Concurrence Agency.
Yes
If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager mus! refuse to receive it
(Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). If EPA is not the Assessment
Manager for the application, the agency has jurisdiction as concurrence Agency. If yes, above, to any shown bold and marked with the symbol a, the
application also requires assessment by Queensland Transport (Marine Safety Qkd) as Concurrence Agency. Subject to the declaration for the relevant
wild river area, the application also requires assessment for the purposes of the Wild Rivers Act 2005.
0 No - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it.
atop. schedule ‘gat tase f toms Hang 5, Seastar P-otacter ard Vang
‘PA scheciie 3. oat! Mole 1 tem 3:!P Fegutapen. scnecuie 2. table 2, toms 12 ana 14 OP Ao
Act 1995 Act 1395. section 1044 evla aver aroy: Wild Bivers Act 2005, secton 43A,
WATERWAY, BARRIER WORKS; WILD RIVER AREA
4.12
Is any of the proposed operational work for constructing or raising waterway barrier ‘works under the Fisheries Act 1994?
LINo-Gowass3 {] Yes
It yes, is any of the proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005?
(No :
IF no, is all of the operational work for constructing or raising waterway barrier works - tick applicable box/es and answer (a) and/or (b) below
(i) temporary Cino [Yes
(il) minor Ono _ ClYes
(iii) rebuilt on a regular basis CINo C1 Yes
(a) If yes to one or more of {i) - (iii) above, does all the proposed operational work comply with any applicable Department
of Primary Industries and Fisheries (DPI&F) self-assessable code?
(1 Yes - A permit for that aspect of the operational work is not required. Go to O4.13 (No - Goto)
(b) If no to all of (i) - (iii) or no to (a) above - (Complete Form 1, Part Os) This application requires assessment by the Department of Primary
Industries and Fisheries (DPI&F). If OPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
CO Yes
It yes, is any of the proposed operational work to be carried out in a wild river high preservation area?
oO No ~ Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive
it (Complete Form 1, Part O) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). and,
‘Subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. If DPIGF is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
oO Yes - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it.
Page 50
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
DECLARED FISH HABITAT AREA; WILD RIVER AREA
4.13
Is any of the proposed operational work to be carried out completely or partly within a declared fish habitat area under the Fisheries
Act 1994,
[I No -Gotoas1¢ (] Yes
IFyes, is the operational work reasonably necessary for: (Tick applicable box/es and answer (a) and/or (b) below)
(i) The maintenance of existing structures, including for example the following structures, if the structures CONo (1 Yes
were constructed in compliance with all the requirements, under any Act, relating to a structure of that
type ~
+ Boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures & weirs;
» Existing powerlines or associated powerline infrastructure
(ii) Educational or research purposes relating to the fish habitat area (No gO Yes
(iii) Monitoring the impact of development on the declared fish habitat area oO No O Yes
{iv) The construction or placement of structures, including for example, safety signs, swimming enclosures [J] No (] Yes
and aids to navigation, if -
¢ The impact on the area is minor; and
« The structures are constructed in compliance with all the requirements, under any Act, relating to a
structure of that type
(v) Public benefit works, including, for example, the construction of runnels for mosquito control, the CINo (Yes
removal of Lyngbya and seed collection for site rehabilitation, if the impact on the area is minor
(a) Ifyes to one or more of (i) - (v) above, does all the proposed operational work comply with any applicable Department of
Primary Industries and Fisheries (DPI&F) self-assessable code?
0 Yes - A permit for that aspect of the operational work is not required. Go to 04,14 O No - Go to (b)
(b) If no to all of (i) - (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?
oO No - (Complete Form 1, Part Q2) This application requires assessment by the Department of Pamary Industries and Fisheries (OPIBF). i OPI&F is not
g y the Assessment Manager for the application. the agency will have jurisdiction as Concurrence Agency.
es
If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
Yes — Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse (0
receive it. (Complete Form 1, Part Oz) This application requires assessment by the Department of Primary Industries and Fisheries
(DPI&F) and assessment for the purposes of the Wild Rivers Act 2005. if DPI&F is not the Assessment Manager for the application, the
agency has jurisdiction as Concurrence Agency,
CNo
If no, is any of the proposed operational work to be carried out in a wild river high preservation area?
oO No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must rafuse
to receive it. (Complete Form 1, Part Q2) This application requires assessment by the Department of Primary Industries and
Fisheries (DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers
Act 2005. if OPI&F is not the Assessment Manager for the application, the agency has Jurisdiction as Concurrence Agency.
C) Y@S - An application for the operational work will be taken to be nat properly made and the assessment manager must refuse to
receive it,
wate
PUR oo P.cT a haem
Page 36
Page 51
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 21.3, 9 May 2008
REMOVAL™ DESTRUCTION OR DAMAGE OF. A MARINE PLANT: WILD RIVER AREA (i
4.14 |Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
[INo -Gotoos.15 (1 Yes
if yes, is thi is the proposed operational work reasonably necessary for: (Tick applicable box/es and answer (a) and/or (b) below)
ne The removal, destruction or damage of dead marine wood on unallocated State land, other than ina at No Oo Yes
wild river area, for trade or commerce
(ii) The maintenance of existing structures, including, for example, the following structures, ifthe | {INo (] Yes
structures were constructed in compliance with all the requirements, under any Act, relating to a
structure of that type —
* boat ramps, boardwatks, drains, fences, jetties, roads, safety signs, swimming enclosures and
weirs;
+ — existing drainage structures;
* — existing powerlines or associated powerline infrastructure
(iii) For educational or research purposes or for the monitoring the impact of development on marine o No “Cl Yes.
plants ee
(iv) For the construction or placement of structures, including, for example, swimming enclosures, safety [_] No CI Yes
signs, aids to navigation, fences, pontoons, public boat ramps and pipelines, if -
+ The extent of the removal, destruction or damage is minor; and
« The structures were constructed in compliance with all the requirements, under any Act, relating -
to a structure of that type
ci ee
(v) For the construction of runnels for mosquito control, removal of Lyngbya, seed collection for site oO No (Yes
rehabilitation or the collection of marine plants for fishing bait, or handicraft
(a) if yes to one or more of (i) ~ (v) above, does all the proposed operational work comply with any =oolnable Department of
Primary Industries and Fisheries (DPI&F) self-assessable code?
(1 Yes - A permit for that aspect of the operational work is not required. Goto 04.15 [_] No - Goto (b)
(b) IF no to all of (i) - (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?
oO No - (Complete Form 1, Part Oz) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). if DPI&F is not
the Assessment Manager for the application. the agency has jurisdiction as Concurrence Agency.
O Yes
If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
oO Y@S - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part Oz) This application requires assessment by the Department of Primary Industries and Fisheries
(DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if
ODPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
CINo
If no, is all of the proposed operational work necessary and unavoidable part of installing or maintaining works or
infrastructure required to support other development for which a development permit is not required or, if a
development permit is required, the permit is held or has been applied for?
O Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part 02) This application requires assessment by the Department of Primary industries and Fisheries
(DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if
DPI8F is nol the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
o No - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it.
PA sopedi.o3 ptt eles 19m 3 PA sorties part2 iane 4s ten t F'srenes Reguaver 12955'134
Fegianen, soneduie | gait tabled om 3. Fgherrs Act 1294 soction “308 wd wer acca. Vd Bwess Ac!
2g 2 Regu'arer scvadue 2 9092 ee 29 P
JA x ovarhe'd va deca won vd Iwars Code
Page 37
Page 52
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008 WILD RIVER AREA 415 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005? LINo -Gotoos1s [1] Yes If yes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to be assessable? () Agricultural activities as defined under the Wild Rivers Act 2005 CI No Ci Yes (ii) Animat husbandry activities as defined under the Wild Rivers Act 2005 LINo C1 Yes Ifyes to either (i) or (ii) above, is any part of the premises in the wild river high preservation area? Yes - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it. ] No lf.no, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005? oO Yes - An application for the operational work will be taken fo be not properly made and the Assessment Manager must refuse to receive it. oO No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive tt (Complete Form 1, Part Q if agriculture. Complete Form 1, Part R if animal husbandry) Subject to the declaration for the selevant wild river area, this application requires assessment by the Oepariment of Natural Resources and Water (NAW). If NAW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. DIRE am th hem OM nn ghee Drage ke A 42 5 det otes wid 4.16 STATE-CONTROLLED ROAD 2 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road? (CNo -Endofsectonad ([] Yes \fyes, is the proposed operational work associated with any of the following? (Tick applicable box/es) @ (i) Amaterial change of use that is assessable under the planning scheme Ono (Yes (ii) Reconfiguring a lot that increases the total number of lots, or increases the totalnumber oflots (JNo (] Yes abutting the State-controlled road If no to either or both (i) or (ii) above, and answers to questions in this section of the checklist indicate the proposed operational work is assessable under IPA, schedule 8 - Answer (a) - (c) below. (a) Is any of the proposed operational work associated with access to a State-controlled road? oO No O Yes - This application must be referred to the Department of Main Roads (OMR) as Concurrence Agency. (b) Is any of the proposed operational work for filling or excavation? LCINo C1 Yes Ifyes, is the operational work proposed in a future State-controlled road not defined by route? No - This application must be referred fo the Department of Main Roads (OMR) as Concurrence Agency. oO Yes - This application must be referred to the DMR as Advice Agency. (c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land, through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controtled road? CI No Yes If yes, is the operational work proposed in a future State-controlled road not defined by route? No - This application must be referred to the Department of Main Roads (DMA) as Concurrence Agency. e@ O Yes - This application must be referred fo the OMA as Advice Agency. Pee ee ng any Page 38
Page 53
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008 SECTI O N 5 The following question only applies when the application is seeking approval to carry out building work to the DECLARED FISH HABITAT ARI extent the work is in a declared fish habitat are 51 ts the proposed building work in a declared fish habitat area under the Fisheries Act 1994? (I No - End of Section 5 0 Yes _Ifyes, is the proposed building work reasonably necessary for: (Tick applicable box/es and answer (a) and/or (b) below) (i) The maintenance of existing structures, including for example the following structures, if the (No [] Yes structures were constructed in compliance with all the requirements, under any Act, relating toa structure of that type - + Boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures and weirs; + _Existing powerlines or associated ociated powerline in infrastructure ) Educational or research purposes relating to the fish habitat area il) Monitoring the impact of development on the declared fish habitat area The construction of structures, including, for example, safety signs, swimming enclosures and aids “Fy No (1) Yes to navigation, if - « The impact on the area is minor; and « The structures are constructed in compliance with all the requirements, under any Act, relating to _ a structure of that type (a) Ifyes to one or more of (i) - (iv) above, does all the proposed building work comply with any applicable Department of Primary Industries and Fisheries (DPI&F) self-assessable code? Yes - A permit for that aspect of the building work is not required. End of Section5 [_] No - Goto (b) (b) If no to all of (i) - (iv) or no to (a) above, is that proposed building wark to be carried out in a wild river area declared under the Wild Rivers Act 2005? Oo No - (Complete Form 1, Part 02) This application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If OPI&F is not the Assessment Manager for the application. the agency has jurisdiction as Concurrence Agency. End of Section 5 Yes If yes, is all of the building work for specified works under the Wild Rivers Act 2005? 0 Yes - Unless the application is consistent with any property development plan applying to the land, the assessment manager must refuse to receive it. (Complete Form 1, Part Oz) This application requires assessment by the Department of Primary Industries and Fisheries (OPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild River Act 2005. If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. End of Section 5 CINo if no, is any of the proposed building work to be carried out in a wild river high preservation area? oO No - Uniess the apptication is consistent with any property development plan applying to the land, the assessment manager must refuse to receive it. (Complete Form 1, Part 02) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of ihe Wild River Act 2005. if DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. End of Section 5 oO Yes - An application for the building work will be taken to be not properly made and the assessment manager must refuse to receive it, End of Section 5 PPA sch en, schecue ? a2! amd 33 bissessab's Jeveromer’ ar 3 table 1 tera 2 Waitt Bwers Act 20C9. section 12 Page 39
Page 54
THIS PAGE HAS BEEN DELIBERATELY LEFT BLANK TO FACILITATE DOUBLE SIDED PRINTING/ PHOTOCOPYING Page 40
Page 55
INTEGRATED PLANNING ACT 1897 IDAS Assessment Checklist, Version 21.3, 9 May 2008 SECTION 6 Complete Section 6 if you have received a referral agency response about an aspect of your proposal prior to making an application. 61 REFERRAL MATTERS FOR WHICH A REFERRAL AGENCY RESPONSE HAS BEEN RECEIVED UNDER IPA S3.2.2 - jist a separate matter in each row HAVE YOU SATISFIED ANY CONDITIONS STATED IN THE RESPONSE? OO Yes | CI No | D Noconditions OJ Yes | C1 No | DO Noconditions OO Yes | CJ No | C1 Noconditions © Yes | 11 No | C1] Noconditions © Yes | 1) No | CD Noconditions O Yes | C1 No | CD Noconditions OO Yes | C1 No | C) Noconditions if yes for any of the referral matters listed in the table above - A referral for this matter is not required, and the relevant Part identified in the IDAS Assessment Checklist is not required to be completed. A copy of the referral agency response and evidence of how you have Satisfied any conditions stated in the response must be attached to your application. #f no for any of the referral matters listed in the table above - The ralavant Part identified in the IDAS Assessment Checklist is required to ba completed. The application must be referred to the relevant referral agency, unless the referral agency is the Assessment Manager, Page 41
Page 56
THIS PAGE HAS BEEN DELIBERATELY LEFT . BLANK TO FACILITATE DOUBLE SIDED PRINTING/ PHOTOCOPYING
Page 57
a | Tard conics to» Ste cortfd ed 7. INTEGRATED PLANNING ACT 1997 APPENDIX 1 IDAS Assessment Checklist, Version 21.3, 9 May 2008 Below is a list of the referrals triggered under the integrated Planning Regulation 1998, schedule 2 that can apply to an application for building work assessable against the Building Act 1975. This appendix is provided for advice only. This appendix is not required to be completed and lodged where an application involves building work made assessable under the Integrated Planning Act 1997, schedule 8 for assessment against the Building Act 1975 only. For more information go to schedule 2 table 1 and scharaia 2A of Be IP Rogue Lt Mi ser 5 No response is a deamed Special fire services - generally ~ 1. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work requires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998 (IP Regulation) or includes an altemative solution assessed against the performance requirements of the Building Code of Australia. Fire safety for budget accommodation 2. Fax more Iormation go p echedule 2.0 Region | An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work the subject of the application requires the installation of a fire safety system for a budget accommodation building. Spray painting 3. For more Information go to schedule 2 of the IP Reguiation - httovAwww. legislation aid. govawActs Sis/Acts. Si | htm| An application may trigger referral to the Department of industria! Relations (DIR) as a concurrence agency if the application involves a workplace incorporating spray painting. Foe more Information go.to schedule 2 of the (P Reguirtion - bhttoviwww legislation od. cov awActs Sls/Acts Sk. i.him Retall meat premises 4, An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a retail meat premises. For more information go to schedule 2 of the IP Private health facilities 5. An application may trigger referral to the Department of Health as a concurrence agency if the Reguiation - application involves a private health facility. httouwww Jogisiation. oki. gov.awActs Ske/Acts Si! him) oo aaltelP 6. Anapplication may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the application involves a work place area less that 2.3m?. For mora Information go to schedule 2 of the [P Regutation - " n.gid.gov.BLWAs An application may trigger referral to the Department of Main Roads as a concurrence agency or advice agency if the application involves land contiguous to a State-controlled road, Pastoral workers accommodation 8. For more Information go to schedule 2 of the IP Regulation - uy Bula An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency if the application involves pastoral workers accommodation. Chitd care centre 9, For more information go to schedule 2 of the IP Regulation - bout lngistation.okLoov.auiActs Ska/Acts Sin An application may trigger referral to the Department of Communities as a concurrence agency if the application involves a childcare centre. For more information go to schedule 2 of the IP Coastal development 10 . An application may trigger referral to the Environmental Protection Agency (EPA) as a For more Information go to schedule 2 of the IP Regulation - httovAvww. tlon.ghd.gov. Regulation - concurrence agency if the application involves land completely or partly seaward of a coastal Wd . od I u building line’. tntegration of land use and public transport 11. An application may trigger referral to Queensland Transport as a concurrence agency if the application involves existing or future public transport corridors, or airport operational airspace®. ’ For more information go to schedule 2 of the iP Regulation - bttouiwew legistation old. gov awActs Sks/Acts SL |.him Raltway safety and efficiency 12. An application may trigger referral to Queensland Transport as a concurrence agency if the application involves future railway land. NOTE: CONCURRENCE AGENCY ASSESSMENT PERIOOS The local goverment, as the concurrence agency, is required to assess and provide an forthe fing building siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all other applications the assessment period is 15 days. If no response is received from ihe focal goverment for an appication, it is taken to be a deemed refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or ‘structure (15), no response is taken to be a deemed approval. ions within a time. For ap ions relating to design and work for single detached cless 1 building or ciess 10 building or structure For more information go to actredule 2 table 1 of the (P ‘Resgutation - ‘Assessment period 15 days. No response is a deemed approval. Amenity and aesthetic Impact of particular bullding |143, An application will trigger a referral to the local government if it is : © fora single detached class 1 building or class 10 structure; and « the local government has declared by resolution the following: — the appearance of the building or structure will have an extremely adverse impact on the amenity of the locality; and — the appearance of the building or structure would be in extreme conflict with the 7 Coastal building lines are prescribed under the Coastal Protection and Management Act 1995. ® Operational airspace is as defined under State Planning Poficy 1/02 Development in the Vicinity of Certain Airports and Aviation Facilities”. APPENDIX 1, Page 1
Page 58
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008 character of the locality. , Whether particular bulidings may be occupied for residential purposes For more information go to schedule 2 table 1 of the IP Regulation - Assessment period 15 days. No reaponee is a deemed rohunal. . An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a referral to the local government as the concurrence agency. Design and siting For more Information go to schedule 2 table 1 of the iP Freguietion- ‘hSosvww legisteton oid cov.auActs Sla/Acs Sh. Uta (Assessment period 5 days. No reaponee is a deemed refusal, 15. An application may trigger referral to the local government as the concurrence agency if the building work does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code. An application may trigger referral to the local government as the concurrence agency if the building work does not comply with the qualitative statement for building clearance and site cover. An application may trigger referral to the local government as the concurrence agency if the building work does not comply with the qualitative statement for performance criteria 4, 5, 7,8 or 9 of the Queensland Development Code, part 11 or 12. Fire safety in particular budget accommodation | bulidings For more information go to schedule 2 table 1 of the iP ‘Regulation - | Assesment period 15 days. No reepones is a deemed rehsal. . An application may trigger referral to the local government as the concurrence agency to determine the building will comply with the fire safety standard under the Building Act 1975 when the building work has been completed. For more information go to schedule 2 table 1 of the IP Reguiation - hiavAvww.legistation.gid.gov.awActs SLs/Acts St Lhtm| and the QOC pert 20. Assessment period 15 days. No responee is a deemed refusal, Higher risk personal appearance services 19. An application may trigger referral to the local government as the concurrence agency to For more informetion go i echeduis 2 table 1 of the determine if the building work m ielation.o © — complies with the performance criteria of the Queensland Development Code, part 15; and and the QDC part 15. © — the work does not comply with an acceptable solution stated in the part. Assoaament period 15 days. No responee is a deemed retusa. Bullding work for residential service 20. An application for building work for premises in which residential care service under the Residential Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger referral to the local government as the concurrence agency. Buliding work for removal or rebuilding 21 For more information go to schedule 2 table 1 of the IP le: i tour legislation old gov.awActs Sis/Acts Sh | hen! Assessment period 5 days. No reeponee is a deemed refusal, . An application for the removal and/or rebuilding at another site of a building or other structure, will trigger referral to the local government as the concurrence agency. Bullding work for rainwater tank in designated ralnwater tank area For mora information go to schedule 2 table 1 of the IP Regulation - 0 Llegislation.gid.gov, Mi and the QDC part 25. Assessment period 15 days. No nseponee ie a deemed refusal, 22. An application may trigger referral fo the local government as the concurrence agency to determine if the building work or structure complies with the relevant performance criteria if - e Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant building work, in a designated rainwater tank area; and e Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable solution for a relevant performance criterion. Disclaimer: While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances. To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your teliance on this process and the information contained on this form. APPENDIX 1, Page 2
Page 59
Locked Bag 72 T 07 8475 7272 Su nshine Coa st Sunshine Coast Mail Centre F 07 5475 7277 Regional Council Qid 4560 E [email protected] giona ABN 37 876 973 913 w www.sunshinecoast.qid.gov.au Officer. Ron Read ’ Direct Telephone: 07 5449 §263 Response Address: PO Box 141, Tewantin QLD 4565 Email: [email protected] Our Reference: 08 7188 Your Reference: < 21 November 2008 , ' ae eee SQ Australian Independent Builders oye iq 70 Howard Street 4 vee Nambour Qid 4560 Dear Sir/Madam Re: Re: Minimum Floor Height or Flood Levet Information Thank you for your minimum floor height inquiry dated 20 November 2008 for the following property: Property Address: 61 Lake Flat Road, Boreen Point ~ Property Description: Lot 5 SP 109944: The nominated minimum floor level required by The Noosa Plan for the above property is: Minimum Floor Level: 3.3m AHD (Australian Height Datum) i Type of data: Modelled (based on 100 ARI event and ‘ includes allowance for greenhouse effects, stormsurge and wave action where applicable) Source of modelled data: Noosa River Flood Study 1995 John Wilson and Partners Pty Ltd and Lawson & Treloar Pty Ltd, Updated 2000 IMPORTANT: This information relates only to regional flooding and not to local runoff or local i flooding. The property may or may not be affected by local runoff or local flooding. , To determine the exact level of the relationship of the floor levels to other levels of the property, a Property survey is necessary and a licensed surveyor should be engaged to provide this information. This floor height information is valid for 6 months Only from the date of this report. WARNING , : THIS MINIMUM FLOOR HEIGHT SEARCH DOES NOT IN ITSELF INDICATE WHETHER THE SUBJECT PROPERTY HAS OR HAS NOT BEEN AFFECTED BY FLOODS. The information in this search is supplied from Council's records in the belief that it Is accurate but no incil warranty Is given In that regard. Co information and expressly disclaims responsibility for any loss or damage suffered as a result of Caloundra Office Maroochydore Office Nambour Office . Tewantin Office . 1 Omrah Avenue 11-13 Ocean Street Cnr Currie and Bury Streets 9 Pelican Street Caloundra Qld 4551 Maroochydore Qld 4558 Nambour Qld 4560 Tewantin Qld 4565 ; | T 07 5420 8200 T 07 5475 8501 T 07 5475 85m Tint nein ees F 07 5420 Rann Cnt meee ones
Page 60
$P109944 V1 REGISTERED Recorded Date 05/04/2000 16:53 Page 1 of 2 Not To Scale
vy
Land Title Ae11994 ; Land Act iSga SURVEY PLAN Sheet} af
Form ziVersion 2 t 14
2
Rrw6WeS i
2 B9°2S0" OP oP.
33 SBBZI oP 31527 (380525) B26 AO, 400-0
Q & or ; Salar pop o>
8 ‘allan nop 73 . 2 2a ORS 72 3 2
yy oRT wae es 7 7-O03ha & v euTs 8-073 ha
: Ber2930" & A Bsr2¥30" (501-74)
390-055 so
EMTA
he & 5 SREDIAGA
a
10-98 ha y
a Beess
y 8 32-72 ha °
So gs 3
s i
hm
7 .
40-5/ha
x No OMk
a Gt Nat Pld Mtoe & COz4 071024 "29065, 5
in Gen REP a S29); On oP
Born 13 ORT Sto ae Con spilt FP
4 (A2hiS 106-88 Jor7 (852666)Bo! 41713 am
” * 2700 0 :
——_) op 83 2 oP
7 Cen RFP J P or | 8 l-
we 268°39, 66.22 RPI86BO9 : 2
BOIE7I
REFERENCE MARKS.
[57] 70 GRIGN | GEARING | DIST e ew Road
/ oP RPIZ6723 9S14° 0-962 PERMANENT MARKS.
2 pay a | FEE | MEN gg f SOO Devrees L150 me Pid ORIG | BEARING | DIST | NO
¢ PIN sasros' | 1245 25-0PmM | Rcaxs3ze | 35906 | «66 | 95950
§ eM ienres, | 1065 laced at all naw and ort
7 PIN asraz | o6 | Eagar ‘ginal
a orp Rp1867a7 | 168°59' | 298 | comers, unless otherwise stated, TRAVERSES ETC.
9 OP RPI88787 89°50" +04 UNE { BEARING | DISTANCE
9 oP piaéaog | i790 | 099 S35 leesesaol Gora?
7 IN wor | o2 ;
@ PIN, 125°" Mt Original Information comp. ots ieege Doe
Bidwd "1,7 2280 | 453 A “
2 St J35S°25° 60 I5-54 1269°23'30"| 626
B PIN geey | 152
“4 PIN les03e | 058
i“ OP RPIB6809 267°05’ +02 rT
14 | Remns ORT Sip] MCHI96 S90" | 27017 Ss .
5 PIN W707 30" | 0875 : DIAG.
16 PIN 17790230" | 0-905
7 PIN e72y | 085 DIAGRAM A
8 ap Reax5324 | I77°02°30"| N14
9 oIP Rea3s324 | 322°45'30"| 08/8
20 OP RCBISI24 77°34'30" +04 ws
2 PIN 132265 | O82
2 PIN 17513" | 1-09
23 PIN W227 | 1095 37S
24 PIN S57°19° NOs 23) BR
26 PIN 24ers | 45 | a re OBOE ee ee ee oO
27 PIN 2703S | HI75 oF
28 PIN wry | 6S 2892330" (S2K66) 25
29 PIN 90°24 +4 24 Ta
30 PIN a5e3¢30" | 126 s¥ig0 ole MEDS Coy, 9154) 23 :
J PIN 2654" | 106 Big on
‘| 8 | EMT A ake
3 oP RPI26723 | 279923'30"| 0676 5 A 4. re
aw ORT RPIZ672S | 2IS°OI'3O" | 18-236 wo" “B
35 oP Rcasssed | 242°53'30"| 1862 1-@9ha sf Q a
° 100 200 300 400 600
Spit —— momen Gi Noll In RFP
SCALE 1:6000 O.05Ma04S
John Robert CAMPBELL jo L 1 L i Sonn La L_100jern 1 L L L150 [men State copyright reserved.
Jahn
teroby certty that | have surveyed the land Scare: 1:6000
od this ily & by Wa:
tenle Schulz (gureAtaca) for whose work)” Plan of Lots 1-5 &7 fom STANDARD
eceept reaponsbility end that the pian Is
te, that th Wd erformed
wh accordonce wih tha Surveyors Act 1977. ond E&EMTA In Lot S&EMTB in Lot 3
the Surveyors Reguletion 1992, and that the
sold curvey wos completed on 8/8/98 Co
w Cancelling Lot | on RP 126723 & Lot 130 on MCH 396 SP109944
ool. ore = sensed Surveyor
Coy led. PARISH: MOOSA county: March Plan Status:
Bete IG.97AR...- | versie — Vide RPIZE723 Fis, NO
Copyright protects the plan/s being ordered by you. Unauthorised reproduction or amendments are not permitted.
Page 61
WARNING : Folded or Mutilated Plans will not be accepted.
Plans may be rolfed.
70 3 97 9 37 5 Information may fot be placed tn the outer margins.
Registered 6. Lodged by .
$555.00 Kee Cras Pasee ME G0)
05/04/2800 16:53
NR 400 NT A os Rerceve Haat
Md sH9 73950
Oran
(Qnchude edoress, phone number, reference, and Lodger Coda}
1. Certificate of Registered Owners or Lessees. e Existing Created
UWe ..Boccaccio. Nominees .Pty..Ltd..ACN.005-245.-983,--Therasia—----- | Title Reference | Lot Plan Low Ents Road
Pty.Ltd. ACN..004.908918, John..Richard.Campton-.and Bruno-D'Anna- 149700 I RP 126723 I-3,5 AB
7 . Deen PIR ences eine sen 14971096 |130| MCH396 | 1,4,5,7 | A [New Re
v MORTGAGE ALLOCATIONS
(Names in full) Mortgage Lots Fully Encumbered |Lots Partially Encumbered
as Registered Owners of this land agree to this plan and dedicate the Public Use 602407024 4,7 5
Land as shown hereon in accordance with Section 50 of the Land Title Act 1994.
consi ITLL
I oA FOR NE
Copal
e
Deere, orn
* Rule out whichever is happic able THEA PTY LTDACN wt "Gua
2 Local Government Approval.
«COUNCIL OF THE SHIRE OF NOOSA ee
hereby approves this plan in accordance with the :
yz Local Government (Planning & Environment) Act 1990
73 2, 12, Building Format Plans only.
279 2,3,5 toerlty thar
130 1,4,5,7 * As far us it {s practical to determine, no pert
of the building shown on thie plan encroaches
Ong ton opto low or road;
a ee © Past of the building shown on this plan
7. Portion Allocation : encroaches onto adjoining * tots and roed
weet tittes a. Map Reference :
; 1999
Dated this... Sin eeember 9445-21 * etete words not recuirad
9. Locality : +3, Lodgement Fees :
BOREEN POINT Survey Deposit
q a e* x +0. Local Government : Lodgement
. x - NOOSA SC oan New Titles
© Ineert the name of the Local Government. “Piseaee rereing Ach 1997 oF Photocopy
of inant of ot Locat (Prenniog & no Act 1900 11, Passed & Endorsed : Postage
3. Plans with Community Management Statement: | « References : By: TOTAL
CMS Number : : Dept File : Date:
° LecatGovt: 2741 Signed : 34, Insert
Name: Surveyor: SIII6 Designation : Number
Page 62
ys « x CURRENT TITLE SEARCH NATURAL RESOURCES AND WATER, QUEENSLAND Request No: 5701148 Search Date: 15/01/2009 15:39 Title Reference: 50325498 Date Created: 21/08/2000 Previous Title: 14971096 14971100 REGISTERED OWNER Dealing No: 706385441 25/02/2003 ROBERT LEIGHTON HAMMERSLEY DEBORAH LEE HAMMERSLEY JOINT TENANTS ESTATE AND LAND Estate in Fee Simple LOT 5 SURVEY PLAN 109944 County of MARCH Parish of NOOSA Local Government: SUNSHINE COAST EASEMENTS, ENCUMBRANCES AND INTERESTS 1. Rights and interests reserved to the Crown by Deed of Grant No. 11211183 (POR 279) Deed of Grant No. 11998215 (POR 130) 2. EASEMENT No 704175968 14/07/2000 at 15:42 burdening the land to LOT 4 ON SP109944 OVER EASEMENT A ON SP109944 3. EASEMENT No 704175969 14/07/2000 at 15:43 burdening the land to LOTS 2 AND 3 ON SP109944 OVER EASEMENT A ON SP109944 4. MORTGAGE No 708273934 07/12/2004 at 15:30 COMMONWEALTH BANK OF AUSTRALIA A.B.N. 48 123 123 124 ADMINISTRATIVE ADVICES Dealing Type Lodgement Date Status 706504987 OWNER BUILDR 07/04/2003 12:05 CURRENT QUEENSLAND BUILDING SERVICES AUTHORITY ACT 1991 UNREGISTERED DEALINGS - NIL CERTIFICATE OF TITLE ISSUED + No Page 1/2
Page 63
> CURRENT TITLE SEARCH NATURAL RESOURCES AND WATER, QUEENSLAND Request No: 5701148 Search Date: 15/01/2009 15:39 Title Reference: 50325498 Date Created: 21/08/2000 Caution - Charges do not necessarily appear in order of priority ** End of Current Title Search ** COPYRIGHT THE STATE OF QUEENSLAND (NATURAL RESOURCES AND WATER) [2009] Requested By: SMIS Page 2/2
Page 64
“espe at va ym romyIn (AE a pe Moyne PERSE FEE oq you dtm pot
“oul puojsusanb "
49, UOI}OIDASSO
susuBbrsap Buipying
te
902525 ON WSAO ONILIVHO NVMOD2H Vid
©9---AUCNMOM NOL HOH iW
|
eanpeng yonpundepg ueesiiny 18 Aystdead a cee SNE ONL =aHNAEO) L L
+ BAA 185 aonbon ak “ry wey
soem) ag qesivoterub awa! aqeioujan”
yoeebaswes sy. peti Wawiim le sxvds ¥ ef
42 aah bg 4obiqoy retrrssa xe wry fevy| way
4 atiqe} yopressy ay quer abe) vospeh- obey ~
Pe
gureremeag ges - rot s bso pene bag
t_ nee uV-22 M89 le Be rime “C4O87,
200.6746
Cory
OO.KE6
‘OLE 9ez,
—_—_—_—
i)
“arqtonidde 2424 ueyse aren pur CL.
“eynagg2 aenequoad6 49) UGE
apna pur 4UPAe (UY anh VO PP
HY WEE 1949] 2204) ENGR
oz eet
WOE E7697 ooo?
argooteS Utld pesssHb2y YO
NOLL GROSAC ALUIGOUd
Et. i
Page 65
mess Bes 2 ys 15°00" 26818'5 2003 REGIONAL ECOSYSTEM MAP 2003 Remnant endangered regional ecosystem Dominant Sub-dominant . 2003 Remnant of concern regional ecosystem Dominant ‘Sub-dominant 2003 Remnant not of concern regional ecosystem Non-rernnant Plantation Forest Dam or Reservoir 2003 Remnant Vegetation Cover (AVC) Vegetation Management Act Easential Habitat Area identified as essential habilat by the EPA tor a species of wildlife listed as endangered, vulnerable, near threatened or rare under the Nature servation Act 1992. For further Information on VMA Essential Habitat, please see the atlached VMA Essential Habitat map. Subject Lot Certitled Map Amendment area Roads * MapInto Australia Pty Ltd 2006 Bioreglon boundary National Park, Conservation Area State Forest and ather reserves: Cadastre line | The maximum spatial error of parcets exteacted for this map fear the Digital Cadastral Data Base(DCDB} range trom: 14m to 251m at a 98% confidence level. Property boundaries shown are provided as a tocational eid only. Towns Based on 2003 Landsat TM imagery Requested By: WAYNE. [email protected] Date: 02 Feb 09 Time! 10.55.42 Centered an Lot on Plan: SsPt0ss44 This is 2 copy of the certifled regional ecosystem map defined by the map extent for the purpose of the Vegetaton Management Act 1999. Areas ot Proper maps of vagetation (PMAVs) are not shawn on this map. Queensland Government LOCALITY DIAGRAM J | Horizontal Datum: Geacentele Oatum at Austratis 1994 (GOAS4) Defined map areas are labolted with the regional ecosystem (RE) cade along with y braakdown if more than one RE occurs within the area. Detailed long of regfona! acasystams ave available trom www epa.c\d,gov.auREDD. Defined map areas smaller than Sha may nat ba. . Rag Nnework has been ata scala of 1:100 000, except in designated areaa where a compilation acale of 1:50 000 is, avaiable. inework shouts ba used a3 a guide only, The posttona! accuracy of RE data mapped at a scale ol 1:100 000 is +/-100 mates. ‘The extant of remnant regional ecosystems as af 2003, on this tap ls based an racifiad 2003 Landaat TM imagery (supplied by SLATS, Department af Natural Reources and Water). Disctaimer: While avery care is taken to ensure the accuracy of this product, the Dapartmont af Natural Resources and Water, the Environmental Protection ney and Mapinto Australla Pty Lid, makes no ceprasantations at warranties about its accuracy, (eliability, compiateness, oF sab fot any parbcuarpurpase aid disclaims all rasponsibifty and ail ttabliity (including without Imitation, liability in negligence) for ail expenses, lossas, damages (Including indirect or consequential yand costs which you might incur a8 a rasuit of the product elng inaccurate of incomplets in any way and for any reason. Alt datasets are updated as they become available to provide the most current information as of the date shown on this map. Additional information is required tor the purposes of land clearing or assessment of a regional ecosystem map of PMAV applications, For further Information go to the web site: www.nrw.qid.gav.au/vegetation ‘of contact the Department ol Natural Resources and Water, Digital regional ecosystam data is avaiable in shapefile format, tor Lot on Plans from wwew.epa.qid.gov.awREDATA or from the Queensland Herbarium for targer areaa, Emait: [email protected] © The State of Queensland, 2009
Page 66
2003 Remnant endangered regional ecosystem ESSENTIAL HABITAT MAP
Dominant Requeated By: [email protected]
, De 12 Feb OS Tima: 10.55.45
Sub-dominant
@ 2003 Remnant ot concern regional ecosystem Centered on Lot on Plan:
EA Dominent 5 sptos944 Labels for Vegetation Managament Act Essential Habitat are centred
an on the area of intarest (1-17 surrounding and including & Lat on
@285 Sub-dominant Plan or 2.2km around the selected coordinates). Labels rekate to
#63 2003 Remnant not of concer regional ecosystem the attached species ist
Non-remnant Regional ecosystem linework has been compiled at a scate of 1:100 000,
i Plartati exceptin designated areas where a compitation scale af 1:50 000
—. lantation Forest avaltable. Linework shouts be used as a guide ory. The,
Dam or Reservoir accuracy of RE data mapped at a scale ol 1:100 000 Is +/-100 meres.
{ The extent of ramnant regional acosystems aa of 2003, dapicted on this
! 2003 Remnant Vegetation Caver (RVC) igbased on rectfied 2003 Landsat TM imagery (supplied by
Vegetation Management Act Essential Habitat SLATS, Department of Natural Reources and Water).
26-15
2S
VEGETATION MANAGEMENT ACT
Area Identified as essential habitat by the EPA for a species
Disctaimer:
ot wildlife listed as endangered, vulnerable, near threatened Whils avery care Is taken to enaure tha accuracy of this product, the
or rare under the Natura Canservation Act 7992. instand Repartmert ot Natural Resources and Water, te Enviconmantl
© Vegetation Management Act Essential Mabitat Species Records A Nee ee ae eains cecetany coeatsiy, completeness
’ or sutabiy for any partculst purpose and disclaims all esponsibi
\/ Subject Lot LOCALITY DIAGRAM and all Babstity (i ing ‘without Reitation, Tlabillty in negiigrace) y
Roads iN for all expenses. losses, damages (including indirect of consequential
*Mapino Australia Pty Ltd 2008 ps damage) and coats which you might incur a3 3 osu of fhe product
being) incom aagon.
+ Bioregion boundary ‘ anyway any reason.
Nationel Park, Conservation Area State Forest ‘AB datasets are updated as they become avallable to provide the
and other reserves most current information as of the data shown on this map.
Cadastre line u Additional information és required for tha purposes of land claaring or
The maximum spatial erst of parcels exteacted for this Li... gsgessmont ofa regional ecosystam map of PMAY applications. Tot
map from the Digital Cadastra! Dato Base{DCDB) range eentact ine ‘Doparonont ot Nataral Resources on oy aulvagetation
trom: 14m to 251m at 2 95% confidence level. Property 1 -
boundaries shown are provided as a locational aid only. t Digital regional ecosystern data is avatable in shapeie format, for Lat
© Towns j on Plans hom werw.ena.qkd.gov.awREDATA or from the Queansiand
\ Herbarium for larger areas.
Emait: [email protected]
000 ° 000m
Horlzontas Datum: Geocentric Datum of Austratia 1994 (GDAS4} a cs ousensland, 2008
1.
mec, pede
Page 67
cd
SITE DRAINAGE
Sa er surf ' : the build’ TIE-DOWN SCHEDULE N3 AS1684.2 FRAMING SCHEDULE
urface and subsurface water occuring on the building ROOF SHEETING . tarers wey:
site shall be diverted to prevent it from flowing under BATTENS T0 TRUSSES ) To roofing manufacty Specification. ROOF BATTENS
: D4 4.5kN 9.25 (d) 775mm no.14 Type 17 screw each interface
the structure. Ponding of wafer under the structureshall . aan 70 x 35 MGP12 p
ae ; igi METAL BATTENS TO TRUSSES Topspan 40 metal battens fitted to manufacturers specifications.
be prevented by filling, grading or the provision of t ' WALLS - EXTER
drainage or diversion channels. TRUSSES TO TOP PLATE 104 13KN 9.21 (el f{ 30x08 gi looped strap, 4/2.8 nails each leg, 10 x 35 studs at 450 cent t notched for braci
NOTE: The ground surface should be graded fo fall TOP PLATE TO SLAB/BEARER JD4 20kN 9.19 (f} #' M12 rod beside openings and @ max. 1200 mm. crs. anes s lates JO x LS botton 7 ‘ or bracing
away from the building. LINTELS TO FLOOR FRAME/SLAB JD4 20kN 9.20 {c) M12 rods to occur within 100mm of stud at opening 10 x % n0gitg ves ee om plate
Discharge stormwater to street thru 100mm.@ pvc pipe as BEARER TO STUMP 32 54kN 9.16 (bh) §, 2/M12 bolts through 75 x 10 m.s. plate 4mm. c.f.w, to post ‘
directed by local authority, or to rainwater holding tank VERANDAH RAFTER TO IDS 4.2kN 9.22 (m) Bf 3.06mm. naits, plus 2/ No 14 Type 17 screws min. WALLS, INTERNAL NON LOAD BEARING
where applicable. / , / VERANDAH BEAM | 35 mm. penitration into receiving member 70 x 35 studs at 450 centres, may be notched for brac
All runoff water to be directed so as not to interefere with = VERANDAH RAFTER TO JD4 5.9kKN 9.21 (b) 2 framing anchors 4/2.8 mm. dia. nails each leg 70 x 35 top and bottom plates, and one row nogging
neighbouring allotments. The roofwater drainage system POLE PLATE i ;
shalt be completed in accordance with BCA part 3.5.2. prior to : .
the final inspection. Pp FASCIA BEAM TO POST Db SkN 9.20 (i) 210 through-bolts at road pearing wate fo be Men ia Seasoned Radiata
POST TO BASE 2 29kN 9.20 (j} 2 M12 bolts through Bostitch Type 1 saddle cast in concrete. nrels 10 be tin Grieg hardwoo
Selection of guttering;
The size of guttering must ;
(a) be in accordance with Table 3.5.2.2o0f
the Building Code of Australia
(b) be suitable to remove rain when
falling at the appropriate rainfall
intensity tisted in Table 3.5.2.1. in B.A,
for 20 year average occurance interval.
(c) be installed with a fall of not less
than 1: 500.
(d) be supported by brackets spaced at
not more than 1200mm, centres.
Downpipes ;
(a) Downpipes must be securely fixed to
walls.
(b) The spacing between D.P.'s
no more than 12m.
(c) Downpipes must be as close as
possible to a valley gutter, and if more
than 1200mm. from a valley gutter,
provision for overflow must be made.
(d) Downpipes must be selected in
accordance with Table 3.5.2.2. of the
Building Code of Australia.
to be
MINIMUM DESIGN STANDARDSARE IN ACORDANCE WITH BUILDING CODE OF AUSTRALIA, QLD. DEVELOPMENT CODE AND
STANDARD BUILDING REGULATIONS.
Bushfire Protection (If required)
Termite Protec
Timber Durability classification to
Preservative Treatment to
Groundwork for Slabs & Footings to
Demolition to
Concrete Structures generally to
Ground Slab & Footings to
Ready Mixed Concrete to
Timber Framing & Flooring to
Structural Steelwork to
Cold Formed Steet Framing to
Preparation of Metal Surfaces to
Particleboard Flooring to
Fibre Cement Flooring to
Plywood Flooring to
REEITGUPSes installed to
Masonry Generally to
Masonry Units to
Clay Brick Durability fo
Wall Ties to
Flashings & Damp-courses fo
INSULATION AND SARKING
Cellulose Fibre to
Mineral Wool Bats & Blankets to
Minerat Wool in loose fill to
Polystyrene to
Bulk Insulation installed to
AS 3959.
AS 3660.1
AS 1604.1
AS 1604.1
AS 2870
AS 2601
AS 3600
AS 2870
AS 1379
AS 1684.4 or AS 1720.1
AS 4100
AS 3623
AS 1627
AS/NZS 1554.1
AS/NZS 1859.1
AS/NZS 2908.2
AS/NZS 2269
AS 4440
AS 3700
AS/NZS 4455
AS/NZS 4456.10
AS/NZS 2669.1
AS/NZS 2904
AS 2462
AS 3742
AS 2461
AS 1366.4
AWRAP/A202
AS 3999
AS/NZS 4200.2
i
Roof Fasteners to
Tiling Materials to
Metaliroofing Design & Installation to
Roof Plumbing to
Cladding Flashing material to
Self Drilling Screws to
Hardboard Clading to
Fibre Coment Cladding to
Metal Cladding to
Plastic Cladding uPVC fo
GPR sheet to
Polycarbonate to
Glass te
Window selection to
Window instalation to
Garage Doors to
Plastecboard to
Plasterboard Installation to
Waterproofing Wet Areas to
Plumbing and Drainage Products to
Stormwater to
Wastewater to
Sep Panks to
Effluent Disposal to
Freshwater to
Rainwater Tanks installed to
Gas installation to
Masonty Units and Segmented Pavers to
In SitwWeoncrete paving to
Electrffal Instaliation to
AS 3566
AS 2049
AS 1562.1
AS/NZS 3500..3.2
AS/NZS 2904
AS 3566
AS/NZS 1859.4
AS/NZS 2908.2
AS 162.1
AS /NZS4256.4
AS/NZS 4256.3
AS/NZS 4256.3
AS 1288
AS 2047
AS 1909
AS/NZS 4505
AS/NZS 2588
AS/NZS 2589.1
AS 3740
SAA MP52
AS/NZS 3500.3.2 or AS/NZS 3500.5
AS/NZS 3500.2.2 or AS/NZS 350.5
AS/NZS 1546.1
AS 1547
AS/NZS 3500.1.2.and AS/NZS 3500.4.2
AS/NZS 3500.1.2
AS 5601
AS/NZS 4455
AS 1379
Or Hyspan. Unless otherwise noted
All non toad bearing walls to be FS seasone
d Radiata
All framing to be in accordance with A.S, 1684.2
Category N3
SILL TRIMMERS
AS 1684.2 - 1999
TABLE 6.3 - N3
UP TO 1500 = same as common stud
1800 70x35 FB/MGP12
2100 70x35 F8/MGP 12
2400 70x35 F8/MGP 12
2700 2/70x35 F8/MGP 12
openings may be 70mm wider
DESIGN CRITERIA
REGION - B
TERRAIN CATEGORY - T
TOPOGRAPHY - T
SHIELDING- P
WIND CLASSIFICATION~ N
CLIMATE ZONE 2
€2.5
1
Ss
3
AS/NZS 3018 and comply with the ED S&IR
MIN. SETBACK FROM FRONT BOUNDRY ---61
MIN. SETBACK FROM SIDE BOUNDRY---1.5
Telecommunications installation must comply to AUSTEL TS 009 and the
Sarking installed to
recommendations of SAA HB29
!
Roof Flashing material to
Wool to
NOTE:
Temporary bracing shall be equivatent to
at least 60% of permanent bracing required.
AS/NZS 2904
BE AWARE: Substitution of any structural members, & or variations to
any part of the design, WILL VOID any responsi es of PHILL MCGOWAN
DRAFTING for the structural integrity and performance of the buildi
AMENDMENTS: PHILL McGOWAN DRAFTING QBSA No 525708
102 Fairview Rd Gympie 4570 Phone 0754828350 Mobile 0429645361 Email pmcgow@bigpond,net.au
Project PROPOSED RELATIVES APARTMENT
Location 61 LAKE FLAT ROAD BOREEN POINT
Drawing TITLE PAGE
i i r .
ae building designe S | Client R&D. HAMMERSLEY 01088 Drawn PM,
COPYRIGHT: This drawing remains the property’ of Australian Independent Builders, ;
and may not be used of reproduced in whole oF in part without written permission, qu eensland inc. Scale - Date 19/11/08 | sheet Vor 12
Page 68
REAL PROPERTY DESCRIPTION SITE DRAINAGE
Lot 5$ On Registered Plan SP109944 Surface and subsurface water occuring on the building
PARISH NOOSA site shall be diverted to prevent it from flowing under
COUNTY March the structure. Ponding of water under the structureshall
AREA 10,98ha. be prevented by filling, grading or the provision of
drainage or diversion channels.
NOTE: The ground surface should be graded to fall
away from the building.
Discharge stormwater to street thru 100mm.¢ pyc pipe as
<< irected by local authority, or to rainwater holding tank
where applicable.
~ All runoff water to be directed so as not to interefere with
a neighbouring allotments. The roofwater drainage system
<S shall be completed in accordance with BCA part 3.5.2. prior to
es shown herin have been located
where possible by field survey. If not
able to be located, services have been
plotted from the records of the relevant
authorities where available.
Prior to any excavation on the site, the
relevant authority should be contacted
for possible location of further under-
ground services,
NOTE;
Levels and contours shown are based
RL FLOOR 3.99} on assumed datum.
Prior to construction, the relevant
H ,
Proposed tiouse authority should be contacted forpossible
minimum floor tevel requirements and
flood information.
89°23'30" \
390.055 179°23'30"
me 269°23'30"
“e
130.120
RL 1.98)
Existing Hous. FF]
oO
Exibting Garag
RL_bench3.50)
|
|
Existing Shed
MIN. SETBACK FROM FRONT BOUNDRY--~-6m
MIN. SETBACK FROM SIDE BOUNDRY--~1.5m
Minimum floor level 3.3m. AHD
Based on 100 ARI event and includes
allowance for greenhouse effects,
stormsurge and wave action where applicable.
OLt'68t
~O0,64eLLb
2
108.260
91°29'00" 185.000
92°55"00"
226,870 |
91°33°00"
(AMENDMENTS: PHILL McGOWAN DRAFTING QBSA No 525708 Y
102 Fairview Rd Gympie 4570 Phone 0754828350 Mobile 04 29645361 Email [email protected]
Project PROPOSED RELATIVES APARTMENT
Location 61LAKE FLAT ROAD BOREEN POINT
Drawing SITE PLAN
ing Fen Ogssoed designers Client R.& D. HAMMERSLEY 01088
COPYRIGHT: This drawing remains the property ot Austratian Independent Builders, Q ration §
and may not be used of reproduced in whole or in part without written pernission. queensland inc. | Scale 1: 250 [Date 19/41/08 Sheet 2 of 12
Orawn P.M.
Page 69
GENERAL NOTES
THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL
OTHER PROJECT DRAWINGS, SPECIFICATIONS AND WITH SUCH
OTHER WRITTEN INSTRUCTIONS AS MAY BE ISSUED DURING THE
COURSE OF THE WORK. ALL DISCREPANCIES SHALL BE
REFERRED FOR DECISION BEFORE PROCEEDING WITH THE WORK.
ALL DIMENSIONS RELEVANT TO SETTING OUT AND OFF-SITE WORK
SHALL BE VERIFIED BY THE CONTRACTOR BEFORE CONSTRUCTION
AND/OR FABRICATION IS COMMENCED. DRAWINGS SHALL NOT BE
SCALED UNLESS SPECIFICALLY NOTED OTHERWISE.
DURING CONSTRUCTION THE CONTRACTOR SHALL BE RESPONSIBLE
FOR MAINTAINING EXCAVATIONS IN A STABLE CONDITION.
SAFETY REQUIREMENTS SHALL BE IN ACCORDANCE WITH THE
REQUIREMENTS OF THE WORK PLACE, HEALTH AND SAFETY ACT
AS ADMINISTERED BY THE DIVISION OF ACCIDENT PREVENTION.
Gt
G2
G3
G6
G7 THE APPROVAL FOR THE USE OF ALTERNATIVES SHALL BE SOUGHT
BEFORE THE WORK COMMENCES.
ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
ALL REDUCED LEVELS ARE EXPRESSED IN METRES AND ARE TO
ASSUMED DATUM UNLESS NOTED OTHERWISE
G8
THESE DRAWINGS CONTAIN INFORMATION FOR OBTAINING A BUILDING
PERMIT, THEY ARE NOT DETAILED SUFFICIENTLY FOR A SPECIFICATION
ROOFWATER DRAINAGE
RAINFALL INTENSITY
OF 250mm/hr WITH ARI OF 20 YEARS (BRISBANE)
AS PER PART 3.5.2 OF THE B.C.A., THE ROOF AREA PER
DOWNPIPE IS CALCULATED USING THE STRAMIT QLD. QUAD
EAVES GUTTER WITH A EFFECTIVE CROSS-SECTIONAL AREA OF
8100 SQ.MM. ACHIEVING A MAXIMUM ACTUAL ROOF AREA PER
DOWNPIPE OF 50 SQ.M. WHICH GIVES A MAX. PLAN DIMENSION
OF 49.8 SQ.M AT 5°, 49.2 SQ.M AT 10°, 48.3 SQ.M. AT 15°,
47.0 SQ.M AT 20°, 45.3 SQ.M. AT 25° & USING 100x75mm
DOWNPIPES.
AS PER PART 3.1.2 OF THE B.C.A. IN ACCORDANCE WITH
AS/NZS 3500,3.2, UPVC STORMWATER PIPELINES HAVING A
SMOOTH (NON-PROFILED} INTERNAL BORE WITH A FALL OF
1:100 MIN. & A NOMINAL DIAMETER OF 100MM ACHIEVES A
HYDRAULIC CAPACITY OF 8L/s, GIVING A MAX. ACTUAL ROOF
AREA OF 114.7 SQ.M. OR A MAX. PLAN DIMENSION OF 110.2
$Q.M AT 5°, 105.2 SQ.M AT 10°, 101.0 SQ.M. AT 15°, 97.2 SQ.M
AT 20°, 93.2 SQ.M. AT 25° PER STORMWATER PIPE.
FOR A BINDING CONTRACT WITH A BUILDER. AN ADDITIONAL SPECIFICATION
SHOULD BE WRITTEN TO INCLUDE PAINTING, ELECTRICAL & PLUMBING FITTINGS,
AND SECOND FIXINGS (KITCHENS, ROBES, CUPBOARDS ETC).
WINDOWS & DOORS INCLUDING FRAMES, GLAZING & FIXINGS ARE TO
ROMPLY WITH AS 1288 - 1994 (GLAZING & IMPACT) AND AS 2047
1999 (CONSTRUCTION) AND BE CERTIFIED BY MANUFACTURER
CLUDING FIXING DETAILS), REFER TO DTCM/412/1-2 FOR DESIGN
PRESSURE CRITERIA. BUILDER TO CHECK THAT FRAME SIZES SUITE
CONSTRUCTED OPENINGS (ESP. BLOCKWORK),
WINDOWS LESS THAN 1500mm FROM BASE OF BATH OR SHOWER]
SUBSTRATE ARE REQUIRED TO BE SAFETY GLASS AS PER AS 1288.
SLIDING GLASS DOOR TO HAVE SAFETY MOTIFS AT MID HEIGHT.
SAFETY GLASS {S REQUIRED WHERE GLASS PANELS EXCEED 0.5 SQM.
SMOKE ALARMS (COMPLYING WITH AS 3786) ARE TO BE INSTALLED
WHERE SHOWN ON PLAN IN ACCORDANCE WITH BCA 3.7.2. PHOTO ELECTRIC
OR IONISATION TYPES ARE TO BE FITTED IN OR UNDER CEILING (WITH
Ensure ground above structure
slopes away to spoon drain so
as to divert water run off away
from under house.
Unprotected embankments must
be within the paremeters described
in Tabte 3.1.1.1 of B.C.A. and if left
exposed at the end of construction
works, must be stabilised by
vegetation or similar works to
NO DEAD AIR SPACES) AND IN HALLWAY BETWEEN BEDROOMS AND OTHER
HABITABLE AREAS AS REQUIRED.
SANITORY COMPARTMENTS (TOILETS) TO HAVE REMOVABLE DOOR AS PER
BCA 3.8.3.3(C) IF DISTANCE FROM PAN TO NEAREST PART OF DOOR IS
LESS THAN 1200mm, ALTERNATIVES INCLUDE SLIDING DOOR OR OPENING
OUTWARDS.
PROPRIETORY ITEMS AND NON STRUCTURAL MATERIALS WITH UNSPECIFIED
FIXING SHALL BE CONSTRUCTED AS PER MANUFACTURERS SPECIFICATION
FOR THE RELEVANT REGION
NOTES
The design of timber stairs, ramps and batustrades
@::;' be in accordance with the Building Code of Australia
ART 3.9.1 and PART 3.9.2 and must be designed to take
oading forces in accordance with AS 1170.1 0r AS/NZS 1170.1
Goings and rises must be constant throughout
Rises must not have any openings that would allow 2 125mm
sphere to pass through between fhe treads.
Going (G), riser( R) and quantity (2R+G) must be in accordance
with BCA Figure 3.9.1.2.STAIR RISER AND GOING DIMENSIONS.
Provide a handrail and balustrade along every side of any
stairway or ramp and any corridor, hallway, external access
balcony, bridge, patio, mezzanine floor or the like, wherever
the side is not bounded by a wall and is more than 915mm
high (or 5 rises in the case of a stairway) above the finished
surface of the adjoining floor or ground.
Provide at least one handrail to other stairs.
Fix handrails and balustrades at a vertical height of between
865mm and 1000mm above the nosings of stair treads, or
the floor surface. .
Every handrail to stairs shalt be continuous between stair
fli nt landings and shall have no gap in the rail wider than
150mm and chall be so constructed that there will be no
obstructions that will tend to break a handhold.
Balustrades must not have any openings that would allow a
125mm. sphere to pass through between the balusters, or
between the bottom rail and fhe floor.
The top rail will be min. 1000mm. above the surface beneath.
For floors more than & m. above the surface beneath any
horizontal elements within the balustrade or other barrier
between 150mm. and 760mm. above the floor must not fa
climbing.
tate
£2
E1
£3
c4
ES
E6
E7
Es
E9
£10
e1
E12
£13
SITE PREPARATIONS, EARTHWORKS AND FOUNDATIONS NOTES.
EARTHWORKS SHALL BE ACCORDANCE WITH AS 3798 AND AS FOLLOWS
REFER GEOTECHNICAL REPORT AS NOTED ON DRAWINGS
ALL VEGETATION AND TOPSOIL SHALL BE REMOVED TO STOCKPILE.
THE CONTRACTOR SHALL CHECK ALL EXCAVATIONS FOR ORGANIC
MATERIAL AND RUBBISH. IF ANY OF THIS MATERIAL IS FOUND, IT
SHALL BE REMOVED FROM THE WORKS TO A PLACE DESIGNATED BY
THE OWNER OR BUILDER.
WHERE INDICATED IN THE SPECIFICATION OR ON THE DRAWINGS,
EXCAVATED MATERIAL ADEQUATE FOR FILLING SHALL BE STOCKPILED
FOR REAUSE. .
UNLESS NOTED OTHERWISE IN SPECIFICATION, FOOTING AND SLABS
SHALL BE FOUNDED ON COMPACTED MATERIAL OR CONTROLLED FILL
AS PER GEOTECHNICAL REPORT
OF 100 kPa. BEFORE ANY CONCRETE IS PLACED THE SAFE
CAPACITY OF THE GROUND SHALL BE VERIFIED,
PRIOR TO CARRYING OUT EARTHWORKS OPERATIONS, THE CONTRACTOR
SHALL LOCATE ALL SERVICES & ADVISE THE SUPERINTENDENT
OF ANY CONFLICTS.
LEVELS SHOWN ARE TO BE CONFIRMED ON SITE PRIOR TO
COMMENCING WORK
PRESSURE
TERMITE TREAT UNDER SLAB IN ACCORDANCE WITH THE RELEVANT
REQUIREMENTS - AS PER A.S. 3660 Pt.1.
ANY ACTIVE NEST CONTAINING ECONOMICALLY SIGNIFICANT TERMITES WITHIN
THE PROPERTY BOUNDARIES UP TO A DISTANCE OF 50m FROM
THE PROPOSED BUILDING SHALL BE ELIMINATED PRIOR TO CONSTRUCTION
ALL TIMBER CUT-OFFS, BUILDING DEBRIS, REMOVABLE FORMWORK AND OTHER
MATERIALS CONTAINING CELLULOSE {EG. CARDBOARD, PAPER) SHALL BE
REMOVED FROM THE SITE
THE LIMITATIONS OF EXCAVATIONS NEAR FOOTINGS SHALL BE AS FOLLOWS:
LINE OF INFLUENCE.
FOOTING EXCAVATION.
XS
LW % BACKFILLED TRENCH
NSRRSK yy OR OTHER EXCAVATION.
x KRER_ __E]ELR Se
; 0 X = 10 IN ROCK
X=S INFILL
ALL FREE DRAINING GRANULAR FILL MATERIAL BEHIND RETAINING
WALLS'SHALL BE OF STRONG DURABLE PARTICLES CONFORMING
TO THE,FOLLOWING GRADINGS.
AS. SIEVE SIZE % PASSING
b6.5mm 100
pone 45 - 100
2.36mm 20 - 75
75 microns 0-15
=
DRAINAGE: FOR ALL FORMS OF TERMITE PROTECTION THE SUB FLOOR
AREA BELOW A SUSPENDED FLOOR SHALL BE GRADED & DRAINED TO
PREVENT THE PONDING OF WATER UNDER BUILDINGS. ALL PAVING &
OTHER GROUND SURFACES ABUTTING EXTERNAL WALLS SHALL GRADE
AWAY FROM THE BUILDING. :
CONCRETE NOTES
ee
6]
C16
(21
ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE
WITH AS3600 - 1994.
DAMPPROOF MEMBRANE 70 BE 200um THK. POLYETHYLENE FILM.
LAP JOINTS 200mm. SEAL LAP PENETRATIONS & PUNCTURES
WITH DOUBLE SIDED BUTYL ADHESIVE TAPE.
MAINTAIN MINIMUM COVER TO REINFORCEMENT AROUND PENETRATIONS
OF THE SLAB.
TIMBER NOTES
1
T4
16
17
18
ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE
WITH AS 1720 - 1988.
ALL CONSTRUCTION OF TIMBER FRAMING SHALL BE IN ACCORDANCE
WITH AS 1684.2 - 1999
TIMBER SIZES ARE MINIMAL SIZES FOR UNDRESSED HARDWCOD AND
FINISHED SIZE FOR DRESSED TIMBERS.
ALL MEMBERS UNDRESSED UNLESS NOTED OTHERWISE.
ALL BOLTS, NUTS, WASHERS AND PLATES TO BE HOT DIP GALVANISED.
PROVIDE BOLTS WITH PLATE WASHERS (HOT DIP GALVANISED) UNDER
HEAD AND NUT RESPECTIVELY. WASHER SIZES TO BE IN
ACCORDANCE WITH AS 1720
STORE MATERIALS AT LEAST 150mm CLEAR OF THE GROUND, EVENLY
SUPPORTED. WELL VENTILATED AND PROTECTED FROM SUN AND
PROVIDE TIMBERS WITH DURABILITY CLASS AND PRESERVATIVE
TREATMENT SUITED TO INTENDED APPLICATION AS RECOMMENDED
BY AS 1684.2 - 1999
TERMITE RISK MANAGEMENT
Termite controtto be in accordance with AS 3660.1
& BCA 3.1.3
Monolithic concrete stab laid in accordance with
AS 2870.1 with 75mm exposed vertical concrete
edge for visual termite control.
All penetrations and construction joints to be fitted
with Termimesh or other approved physical barriers
installed or applied by licenced applicator to manufacturers
specification,
Any untreated timber posts, stairs and the like shall be set
75mm minimum clear of ground for visual inspection.
Any active nest containing economically significant termites
within the property boundaries up to a distance of 50m
from the proposed building shall be eliminated prior to
construction. All timber offcuts, building debris and other
materials such as cardboard and paper containing cellulose
shall be removed from the site.
Two approved notices shall be affixed to the dwelling as
required advising owners of the method of termite risk
Management used, and their ongoing responsibility for the
maintainance of the systems.
STRUCTURAL STEELWORK NOTES
$1 All workmanship and materials shall be in accordance
with AS4100-1990
$2 Unless otherwise specified, all steelwork not hot dip
Galvanised shall be shop painted with one coat of zinc
phosphate primer.
$3 Except where otherwise shown, welds to be 6mm.
continuous fillet. E4 1XX electrode.
S4 Unless otherwise shown, all bolfs, nuts and washers
shall be galvanised in accordance with AS1214
SS Site welds to be painted with zinc rich paint.
$6 Dissimilar metats shall be separated so as to prevent
Galvanic corrosion.
$7 All metat used in structural timber connections shall be
provided with suitable corrosion protection for particular
conditions in accordance with AS/NZS 4791 & AS 1214.
‘AMENDMENTS:
COPYRIGHT:
This drawing remains the property of Australian dependent 81 .
and may net be used of reproduced jn whole oF in part without written peraission.
building designers
association “of
queensland inc.
PHILL McGOWAN DRAFTING QBSA No $25708 Y
102 Fairview Rd Gympie 4579 Phone 0754628350 Mobile 0429645361 Email [email protected]
Project
Location 61LAKE FLAT ROAD BOREEN POINT
Drawing GENERAL NOTES
PROPOSED RELATIVES APARTMENT
R. & D. HAMMERSLEY Drawn P.M.
| Date 19/11/08
01088
Sheet 3 of 12
Page 70
CLIMATE ZONE 2 < 300m }
Floor Area 108.3sq. m.
Weatherboard 1.3 |
Plywood cladding 12 | fos
‘Fibre cement cladding 11 |
SOLUTION W11 TRADAC Technical Data Sheet {Oct.2002) |
Energy Efficiency Timber Framed Construction. ] |
NOTES: NORTH SECTOR | |
REQUIREMENTS FOR ROOF Moximum Effective Glazin . . . ; ; ,
g Area as per Table 3.12.2.1 37% of 108.3sq m. Alt plumbing work to comply with irements in AS/NZS 3500 Climate Region A
Minimum R-Value for roof as per Table 3.12.11 = 2.2 = 40.07sq.m. p ° prambing wor pry wit) energy requ 3
OUTCOME : Install AnticonSS blanket under tin R2.6 + RO.5 for
roof and ceiling materials = total R3.1 7 7
3 Orientation Area PIPE INSULATION
REQUIREMENTS FOR WALLS --- BCA Table 3.12.13 North Elevation | 5.67x 5 = Z83sqm. SYSTEM ELEMENT PIPING LOCATION | R-VALUE | ACCEPTED INSULATION MATERIAL
oo able 3.12.1. East Elevation 12.9sq. m. Cold water connection toHWS | Internal & External
R 1.0 min. required for external walls. South Elevation 10-32sq. m. 3 4 HWS e xternal | 0.3 13mm Closed cell polymer.
West Elevation T08sq. mr. Actual % |Max % -Between closest valve ant
OUTCOME : Total 27.1389. m. 25 37 Outlet piping from HWS.
SOLUTION W11 TRADAC Technical Data Sheet (Oct.2002) NOTES: ' -first 500 mm from HWS or to a As above.
Energy Efficiency Timber Framed Construction. RBM. Reflective Building Membrane. Po ene the first
70 mm timber studs gyprock internal lining, vapour permeable RBM Must have a reflectance of af least 0.95. 9 P.
covered by Hardies Primeline Cladding. Provides R 1.1 Not less than 20 mm between the more reflective Non recirculating hot water External piping
REQUIREMENTS FOR AIR MOVEMENT --- BCA Part 3.12.4 side and a building lining or cladding. Piping. connected to primary As above.
Minimum lap of 150 mm. kitchen sink.
Provision for Air Movement For Habitable Rooms. BULK INSULATION.
as per Table 3.12.4.1 Minimum total ventilation in accordance with AS 2464.3 for loose fill,
opening area per habitable room without ceiling fan. 10% AS 2464.5 for bats. ALL STORAGE HWS TO HAVE A HEAT TRAP WITHIN 1 OUTLET AND BEFORE THE FIRST BRANCH
Installed “(a So that it maintains it's position and thickness A im OFTHE OUTL BE
i jlati i A In ce here there i bulk insulati RBM i ts,
Analysis of Ventilation Opening Requirements So that'd overlaps the wall members by min. 50 mm. and IF NO INTERNAL HEAT TRAP IS AN INTEGRAL PART OF THE WATER HEATER.
Habitable Room floor Ventilation Opening | Window size and Analysis (C} So as to abut other bulk insulation or building members to :
Room area (sq.m) Required ( % & sqm.) ensure there are no voids, other than around domestic services
ee 4 B.6sqm. (10% 2.1% .9 x 2 = 3.78sq.m. or fittings where insulation may effect the safe or effective operation
1.36sq.m. 1.2 x 2.6 x 5 = 1.56sq.m. of the fitting, we ee
Total = 5.34sq.m. complies fo | | |
| Oo |
| L |
| |
1 External cladding | |
Combined Airspase(anti-glare) .
omer | 37-lsq.m. |10% 12x 24 x5 = 1h4sqm. 2 Vapour permeable R.B.M | L
Kitchen & 3Tsqm. - ‘ . . f vee.
" 2.4 x 3.1x.S = 3.72sq.m. 3 Airspace {reflective} | ]
“a x ate = 3 728q.m. 4 Timber stud | |
otal = 8.88sq.m. complies 5 10mm
- gyprock
| |_— |
ITEM TOTAL ‘R’ VALUE i Es (— |
WHEN SERVING A CONDITIONED SPACE,
A seal to restrict air infiltration must be fitted to each edge of an external door,
openable window, and other such openings.
A roof light must be sealed, or capable of being sealed, in accordance with WEST SECTOR
EAST SECTOR |
(1) An imperforate ceiling difuser or the like installed at the ceiling or
internal lining level, or eee ee ee ee ee Oe ee ee eee ed
(2) A shutter system readily operated either manually, mechanically or electronically
by the building occupant. =
An exhaust fan must be fifted with a sealing device such as a self-closing damper, SOUTH SECTOR
filter or the like. i BREEZE PATH REQUIREMENTS COMPLY WITH BCA CLAUSE 2.12.4.2
‘AMENDMENTS PHILL MCGOWAN DRAFTING QBSA No 525708 NY
102 Fairview Rd Gympie 4570 Phone 0754828350 Mobile 0429645361 Email [email protected]
Project PROPOSED RELATIVES APARTMENT
Location §1LAKE FLAT ROAD BOREEN POINT
Drawing ENERGY EFFICIENCY REQUIREMENTS
building designers Drawn P.M.
COPYRIGHT: This drawing remains the property'oy Australian Independent Builders, association “of
and may net be used of reproduced in whole of i part without written peraission. queensland inc. | scate - Date 19/11/08 Sheet 4 of 12
| Client R.& D. HAMMERSLEY 01088
Page 71
NOTE:
‘ If no connection is available to a reticulated water supply,
the dweiling must be provided with water supply storage
of at least 45,000 litres, and must comply with AS/NZS 3500:2003
and the Water Act 2000.
Ensure ground above structure
slopes away to spoon drain so
as to divert water run off away
from under house.
Unprotected embankments must
be within the paremeters described
in Table 3.1.1.1 of B.C.A. and if left
exposed at the end of construction
works, must be stabilised by
vegetation or similar works to
prevent erosion.
7800
600
70 1999 70 1420 70 1530 7 3000 70
# —t Ht —# He @& SD Approved smoke alarm to comply
8300 3000 with AS, 3786 & Part 3.7.2 of BCA
xz t- # All wet areas to be treated to BCA 3.8.1
11300 i with approved waterproofing system, and
y —_f must comply with AS8740-2 04
} -
ENCLOSED LIVING AREA 64.7sq.m.
VERANDAHS 43.65q.m.
q TOTAL 108.3sq.m.
(AMENDMENTS: PHILL McGOWAN DRAFTING QBSA No 525708 ‘N
102 Fairview Rd Gympie 4570 Phone 0754828350 Mobile 0429645361 Email [email protected]
Project PROPOSED RELATIVES APARTMENT
Location 61LAKE FLAT ROAD BOREEN POINT
Drawing FLOOR PLAN
sy ge : ; P
building designers Client R&D. HAMMERSLEY 01088 Drawn PM.
: This drawing remains the Australian independent Builders, :
COPYRIGHT: Te lay al be ed er Feprecation whole of part without writen persion queensland inc. | Sscate 1.100 Date 19/11/08 Sheet 5 of 12
3000
10
Ht
4000
3590
4000
70
3590
2109lv.
21091v.
2109lv.
aii]
weeotC«wNSSSsS~S:CSS
|SZEGIx WW
14200 x 2400,
|2400x 3100
AL
Sliding Glass Deor
12400 x 3100| Sliding Giass Door
HEAD SIZE
‘sh.
JAMB STUDS _
165 = 35FA7 shwd. }2/70 x45 MGP12
220 x 35F17 shwi. $3/70 x 35 MGP12 |
w4 |2100% 26001 Window Wall on vu (120% 35FA ) show
11300 __}2100x900 |} __ Louvre ___ ___190.x 35 F17 shwd.
# wT m SE | 2100 x 900 | Louvie | 90 x 35 Fi? shwd.
# _. Leuven | Obscum —_(90.x 35 Fi? shwd. 35
y 3400 4090 if 3000 .. Ask Obscure 90x 35 FA7 shwd (2/70 x 35 MGPI2 |
4070 4030 100 3900 00
# 7 Ht
eee eee an Mo —. 4
oi. 4 Be FP
Sil i
3 j
* Bow
. 3 11 8
Svea “ if t STR
m6 2431stacker-—@ yt
fa Oe q
WS wW3 4 Sts
Ht # ae
'
J .
s—-ai »
be a
ef z= |
x LVING 2-2 st lels
BED! 2 he $ 34 ek? | 2
7 wy ere
z th
lf x 2 d
e Ci 2
i i.
2:
[O} :; | + ar
4 Ss 650 \
Kitchen loro io ss
indicative ony. for Fog
i . . detalla,referto 13
fi Tiled recess in walt spectlicaliore. ? rrle
Refer to specs. for details. ° a t a
Floor waste by owner KITCHEN >~|foll! = 3 tel NK
21620 s 2: I a
— z ' aa »
£ t Sas 2k Fal, 7
AL. 4 Al
0618s| Ramp by owner
Page 72
CL
|
JL
2700
2100
FFL
Wi
wi
SUT OT
! l a
W3
According to the BCA Volume 1 Part 02.10 Pedestrian ramps,
{b) A ramp serving as a required pxit must -
(i) where the ramp is also serving as an accessible ramp
under Part D3 (Access for People With Disabilities)
be in accordance with AS 1428. have a gradient not
greater than 1: 14 with a’maximum run of 9m.and a
1200mm. platform, orf
li) in any other case, have a gradient not steeper than 1: 8.
(c) The floor surface of a ramp must have a non-slip finish.
bax
Rendered "Blueboard” cladding: {
}
6* roof pitch
Cotorbond Custom Orb roof
Ch
J ~~
Wh
2700
2100
SSS L___!__} FEL
VIEW 2
>
4
f
i
i
i?
2400 x 3100! ‘Sliding Glass Door |
2400 x 3100| Sliding Glass Door |
2100x2600} Window Wall |
2100x900! Louvre | . {90x35 F17 shwd. (2/70x 35MGP12 |
2100 x 900 | _... $90X35F17 siwd. 12/70 35 MGP12
* 2100x900 | Obscure |90535F17 shwd [2/70.x 35MGPI2
3 600 x i800 | i Obscure _ SFI? shwd. |2/70x35 MGPi2
VIEW 4
‘AMENDMENTS:
COPYRIGHT: This drawing remains the properif ot Australian Independent Builders,
and may net be used or reproduceg in whole of in part without written permission.
building designers
association of
queensland inc.
PHILL McGOWAN DRAFTING QBSA No 525708
~
102 Fairview Rd Gympie 4570 Phone 0754828350 Mobile 0429645361 Email pmcgow(@bigpond.net.au
Project PROPOSED RELATIVES APARTMENT
Location 61LAKE FLAT ROAD BOREEN POINT
Drawing ELEVATIONS
Client &.%D, HAMMERSLEY 91088
Scale 1: 190 Date 19/11/08
Drawn P.M.
Page 73
DETAIL 1
JL
2700
2100
FFL
Colorbond Custom Orb Roof
Aircell insulation blanket
re ir
M12 cyclone rod
DETAIL 1 Scate1: 10
4000 —¥
DETAIL 2
DETAIL 3
Lap 130 x 45 hySPAN rafter 1.0m
beside pine truss and secure with 3/M12 gal bolts.
or as specified by engineer.
| “-Strap trusses to top plate
70 x 35 MGP12 pine ribbon plate
10 x 35 MGP12 pine top plate
2750
iar =| an} hpnllhrneietomatimaiieniantinpmenninita S| t.\, \
{ CI===
L--
ses __
oo
Colorbond Custom Orb Roof:
Aircell insulation blanket:
M12 boits {
70 x 35 MGP12 pine frame
between trusses to carry
cladding
|
DETAIL 2 scate 1:10
70 x 3S MGP12 pine batten
130 x 4S hySPAN rafter
130 x 45 hySPAN bird boar
Cr=ot
70 x 35 MGP12 pine batten
|/_Tripplegrip each side
Selected cladding to cover beam
vy x 4S hySPAN beam
MH
UN M12 gal bolt
“F100 x 100 F14 hwd. post
DETAIL 3 Scale 1:
"AMENDMENTS:
This érawing eemains the prope:
and may not be used oF repr.
COPYRIGHT:
Austealian Independent Sudders.
in whole or in part without written permission.
building designers
association of
queensland inc.
PHILL McGOWAN DRAFTING QBSA No 525708
102 Fairview Rd Gympie 4S70 Phone 0754828350 Mo
Project PROPOSED RELATIVES APARTMENT
Location 61 LAKE FLAT ROAD BOREEN POINT
Drawing —SECTIONS-DETAILS
“I
0429645361 Email [email protected]
Client R.8D. HAMMERSLEY 01088
Date 19/11/08
Scale SHOWN Sheet 7 OF 12
Drawn P.M.
Page 74
ot
| HS240 45 hy JOIST
Top mount joist hanger
2/240 x 45 hySPAN bearer“
LT M12 gal bolt
150
|
f Top mount joist hanger
240
_
_ OT h 10mm. m.s, plate
2/240 x 45 hySPAN bearer
10mm. ms. plate
15 x 75 x & Duragal post
\- M12 gal bolt
A! 150 x 63 hySPAN bearer eS
4 I y . RLW]2700
Ko mm. m.s. plate ‘
b— 10mm. ms. plate
FLW|z000 FLW] 200 FLW|3600 FLW]1500
a
ss
” wn
e3
e ” ° 2c ©
232 _& . 38 &
$33 5a 5 & 3s =
sei yF & z 3 ee z 2
Pr M12 gal bolt 2 se st ey 0 S35 Oe ak
2}—i 3-H at 8
x eed 3+ st e| =
12 gal pott a es —ab we wi} e| 7
1 i S os xt x ie
a B81 Ra wake an
6. a
3 u u $
~ 150 x 63 hySPAN bearer I 0 S35
* 5 ons g| 2%
bs & rs t— & .
be 3 Lg 4S e 8
10mm, ms. plate }= a Le ! @ S| oe 2
1S 3 oN $4
g EN Ls INS Fat 2] 2
HE : so g}—ge—-Ei{ oan?
t Y + a gu Boy =
DETAIL FOR BEARER4 &5 tux s Ys t 3 a e2—4-44 2
I 5 I] (_S_ Wp — "Ba eae =
2 oot
a Fd oF 72 w
jalsts framed Into the side of bearers T & g 4: ge S) o| eae
° es
- floor level bearers = 2—at_ 35 _~31 #
(_# 22.
bz Lae =—_§_L_ ar 47 a
1-9; = s Ag —t 0 S38 2
. a m_ ¥ x2 =P Se
£ .
J01S* HANGER: 1 re : g 4 == = ee
\ hyGPAN BEARER Fs 1 2 2 z &
ow
— | © 2 ~ 3
\ Y to i 5 2
‘ — | ms (OB
=x >
; 3s —t = a o S38 tek
ec 2
i— ee a8 a3 be
7 na $$ RR z
= =z =z
/ zz zz 2a 3900 100
POOR IOIS- 5 3995 15, 4080 15 2925 Bs
at Ht At Ht
AMENDHENTS: PHILL McGOWAN DRAFTING QBSA No 525708 y
102 Fairview Ro Gympie 4570 Phone 0754828350 Mobile 0429645361 Email [email protected]
Project PROPOSED RELATIVES APARTMENT
Location 67 LAKE FLAT ROAD BOREEN POINT
Drawing FLOOR - ROOF LAYOUT
building designers | ¢, Drawn P.M
4 Client R. 8 .
COPYRIGHT: This drawing remains the Property of Austratian Independent Builders, association of R.&D. HAMMERSLEY 6108
and pay not be used of reproduced in whole of in part without written permission. queensland inc, Scale 4: 100 Date 19/11/08 [sheet BOF 12
Page 75
—~
1Skn. brace set F
. et . °
o | | t
n 1 r I
wv 1 { q
2 ! | 1
5 3 é q
£ { ' 4
po
wp B2 Ih
L r a —
_.
1 c~-
r <
! DIRECTION B 3 _|
DIRECTION B 20,24kn] REQUIRED
58.3kn. REQUIRED ' 22.8kn. ACHIEVED
63kn. ACHIEVED ° i
|
1 at
B3 I<
t t —~
ul Nn. oo .
6m. 6RN. oko
1
1
1 _
T ORN. << .
6HTT. ORT. 6HN. 5 ~Ipal
° ‘ B1 B&.
DIRECTION A i DIRECTION A
56.4kn. REQUIRED , 23.0tkn. REQUIRED
63kn. ACHIEVED 28.5kn. ACHIEVED
J DIRECTION A REQD.-- 23.01kn. DIRECTION B REQD.-- 20.24kn.
LL. Al [ F14 Ply 4mm 0.9 m. 5.0 kn. Bi] F14 Ply 4mm. 0.9 m. 5.7 kn.
A2 | F14 Ply 46mm3 | 0.9 m. 5.7 kn. B2 | F14 Ply 4mm. 0.9 i. 5.7 kn.
A3 | F14 Ply Gmma | 18m. 11.4 kn. B3 | F146 Ply 4mm. [ 0.9 m. 5.7 kn.
AG | F14 Ply 4mm% | 0.9 m. 5.7 kn. B4 | F14 Ply 4mm. 0.9 m. 5.7 kn.
oo TOTAL RESISTANCE-- 28.5kn. TOTAL RESISTANCE -- 22.8kn.
DIR.A Area 27.4sq.m. x 0.84 = 23.01kn. DIR B Area 18.4sq.m. x 1.1= 20.24kn. 4
1684.2 TABLE 8.2 1684.2 TABLE 8.4
L,
E
DIR.A Area Si.4sqm. x 1.1 = 56.54Kn. DIR B Area 44.9sqm. x13 = 5837KN. aeiommTs PHILL McGOWAN DRAFTING OBSA No 525708
1684.2 TABLE 8.3 1684.2 TABLE 8.5 102 Fairview Rd Gympie 4570 Phone 6754828350 Mobile 0429645351 Email pmcgow @bigpondanet au
Project PROPOSED RELATIVES APARTMENT
3 Location 61LAKE FLAT ROAD BOREEN POINT
: Drawing BRACE PLAN
3 building designers | cient Drawn PM.
COPYRIGHT: This drawing remains the property ot Australian Independent Builders, association of lent RED. HAMMERSLEY 01088
and may not be used of reproduces in whole or in part without written permission.
queensland inc. Scale -
Date 19/91/08
Sheet $ OF 12
Page 76
‘5 x 50 shear block fixed
90 x 45 shear block fixed to top plate
with 3/75 mm, No 14 type 17 screws
Bo!
D
tom chord
clearance for
truss deflection
Bracing wall
TRUSS TO BRACING WALL 10kn. per set
WALL AT RIGHT ANGLES TO TRUSS
PLYBRACE AS 1684.2-2006 Minimum plywood Bracing
TABLE 8.18 thickness (mm) Capacity
(g) - Plywood (kN/ml
Plywood shall be nailed fo frame using 30 x 2.8mm dia. flathead naits or equivatent Stud
For Method A,M12 rods shall be used at each end of sheathed section top st spacing
plate to bottom plate/floor frame. Method B has no rods but sheathing shalt ress {mm}
be nailed to top & bottom plates and any horizontal joints at 50mm crs. grade
Horizontat butt joints permitted, provided nai 450 600
fixed to nogging at s = 150mm cers for
Method A, or s = SOmm crs for Method B FB 7 9
/ Pa an = FN 6 1
150 T it | Fis 4 6
} . 5 } F27 4 45
| r Tt , 1 Fastener spacing, s
« 300mm. +} : + inl °
: { : toe
1 . : : + - Top and Method
F . 1 ‘ 1 bottom plate Aba
s . | = Method A 150 | Method
} : . + - Method B so | 8 6.0
Sheathed } : + Vertical
panels shali r . 1 edges 150
beconnected = | : 1 : . 4
to subfloor fe see fe
For Method A only; Intermediate
M12 rod to top & bottom plate studs 300
each end of sheathed section
NOTE: For plywood fixed to both sides of wall, see Clause 8.3.6.5
Steel Braces on Timber or Steet Columns
where bearer height to width
exceeds 4:1 the bearer shall be
fixed to prevent overturning
, crf
———__——_—___2/M 12 or 1/M16
2/30 x 0.8 galv straps, 4/2.8 bolt to bearer
Rails each end for hardwood and footing
5/2.8 nails for softwood FOOTING DEPTH IN M16 rod 1
FIRM {OR STRONGER} MAXIMUM TIE-DOWN rods, circular
LOW TO MEDIUM FORCE “U" (kN) hollow or rectangular
2 nailing plates ea. end M10 bolt PLASTICITY CLAYimm) holiow sec
of bridging, legs not bent 3 450 11.25
with 6/2.8 nails ea. face X 600 15.0 =
a 750 18.75 ——\!_——— column
3] mm 900 22.5
For each square
a metre of 190mm 2s 60° MAX
concrete slab . 30" MIN concrete stab optional
. tied te footing
100x50mm bridging F +
BRACING WALL TO FLOOR JOISTS piece on edge I | x
, bracing rods shall be tensioned 1 | ej£ 8
DESIGN STRENGTH {kN) I L { 5 a+
BRACING WALL TO EXTERNAL WALL Fe Ux D/titean oa g|8 &
r— Mi0 bolt with maximum of L J o
15 KN per set y
po
M { X
TO FLOOR JOISTS
BRACING WALL Double joist or 450mm long
full depth cleat nailed to
joist with 6/75x3.15mm dia. nai
‘AMENDMENT PHILL McGOWAN DRAFTING GBSA No 525708 Y
This drawing remains the propert
and may not be used oF reproduc
COPYRIGHT:
t Austratian Independent Builders,
whole or in part without written permission.
102 Fairview Rd Gympie 4570 Phone 9754828350 Mobile 0429645361 Email [email protected]
Project PROPOSED RELATIVES APARTMENT
Location 61LAKE FLAT ROAD BOREEN POINT
Drawing BRACE DETAILS
building designers Drawn P.M.
essociation of
queensland inc.
Client R.& D. HAMMERSLEY 01088
Scale - Date 19/11/08 Sheet 10 OF 12
Page 77
Shower Roses: (fo reticulated mains water supply areas only) * This app ies to new Class | buildings and soie-occupancy units of new Class 2 buildings, or where the bathroom of these building classifications undergoes renovations Shower Roses te be 3 Star rating under the Water Ef lency Labeling Scheme (WELS) or a AAA rating when assessed against AS/NZ 6400:2005 Water Efficient Products — rating and labeling. Water Pressure Limiting: (to reticulated mains water supply areas only} The maximum pressure level of water from any outiet within the property boundaries of a new Class | building must Hot Water Supply: in 9 Né@w Class t building. A suitable hot water system includes: (a) ages hot water system with a five star energy rating: or (b) aheat pump or a Soler hot water system where: ) in @ building with 3 or more bedrooms, the hot water system, must be eligible to receive at least 22 Renewable Energy Certificates; or In a building with | or 2 bedrooms the hot water system must be eligible to receive at feast 14 Renewable Energy Certificates. not exceed 500kPa. Compliance can be achieved through the installation of a water pressure limiting device in tine !f choosing GAS hot water system be awere that the system must be kept clear of window and door openings with the water meter. Where it is known that the pressure level of the water supply does not exceed 500kPa, a water(including air vents, weep Noles and drains} for a horizontal distance of 1 meter and with a vertical separation of pressure limiting device is not required. Dual Flush Tollets: This applies to new Class | buildings and sole-occupancy units of new Class 2 buildings or where toilets are replaced in the bathrooms of these building classifications undergo renovations. A toilet must have a dual flush capacity that does not exceed 6 litres on full flush and 3 litras on half flush. 500mm. to any openings above Refer to AS5601-2004. Depending on the type of gas storage bottie(Exchange or Insitu), you can not nave an ignition source surrounding the gas storage bottle, 1.5m. radius for Exchange bottie, or 3.5m. radius for insitu bottle. 4 Refernce Standards and Legislation: AS/NZS 3500.1: 2003 Plumbing and drainage- Water services. AS/NZS 6400: 2005 Water Efficient Products-Rating and Label Plumbing and Drainage Act 2092 Standard Plumbing and Drainage Regulation 2003. 1 t SITE DRAINAGE : | Surface and subsurface water occuring on the building ; site shall be diverted to prevent it from flowing under I the structure. Ponding of water under the structureshatl | be prevented by filling, grading or the provision of | drainage or diversion channels. | NOTE: The ground surface should be graded to fall ! away from the building. | Discharge stormwater to street thru 100mm.¢ pyc pipe as : directed by locai authority, or to rainwater holding tank | where appticable. ‘ All runoff water to be directed so as not to interefere with | neighbouring allotments. The roofwater drainage system shall be completed in accordance with BCA part 3.5.2. prior fo | the final inspection. ROOF WATER DRAINAGE RAINFALL INTENSITY | OF 250mm/hr WITH ARI OF 20 YEARS (BRISBANE) | AS PER PART 3.5.2 OF THE B.C.A., THE ROOF AREA PER | DOWNPIPE IS CALCULATED USING THE STRAMIT QLD. QUAD EAVES GUTTER WITH A EFFECTIVE CROSS-SECTIONAL AREA OF B100 SQ.MM. ACHIEVING A MAXIMUM ACTUAL ROOF AREA PER DOWNPIPE OF SO SQ.M. WHICH GIVES A MAX. PLAN DIMENSION OF 49.8 SQ.M AT 5, 49.2 SQ.M AT 10°, 48.3 SQ.M. AT 15°, 47.0 SQ.M AT 20°, 45.3 SQ.M. AT 25° & USING 100x75mm DOWNPIPES. AS PER PART 3.1.2 OF THE B.C.A. IN ACCORDANCE WITH AS/NZS 3500.3.2, UPVC STORMWATER PIPELINES HAVING A AMENDMENTS: PHILL McGOWAN DRAFTING OBSA No 525708 ‘N SMOOTH (NON-PROFILED) INTERNAL BORE WITH A FALL OF 102 Fairview Rd Gympie 4570 Phone 0754828350 Mobile 0429645361 Email [email protected] 1:00 MIN. & A NOMINAL DIAMETER OF 100MM ACHIEVES A Queensland Development Code Part 25 states: Project PROPOSED RELATIVES APARTMENT HYDRAULIC CAPACITY OF BL/s, GIVING A MAX. ACTUAL ROOF single detached heute must install a rainwater fank Drawing nr LAKE enten BOREEN POINT AREA OF 114.7 SQ.M. OR A MAX. PLAN DIMENSION OF 110.2 with a min. 50001, capacity. ‘ ut LUMBING LA SQ.M AT 5°, 105.2 SQM AT 10, 101.0 SQ.M. AT 15, 97.2 SQ.M, painwater tank must receive rainfall from at least half building designers | cient pz A D.HAMMERSLEY 1088 Drawn P.M. AT 20°, 93.2 SQ.M. AT 25° PER STORMWATER PIPE. the roof catchment area or 100sq.m. whichever is lesser, | COPYRIGHT: This drawing remains the properf] of Australian Independent Builders, association of —— 4 and may not be used oF repreduceh in whole or in part without written permission, queensland inc. | scate 1: 199 Date 19/11/08 [sheet 11 OF 12 7
Page 78
Enecgy,Efficient Lighting: This applies to new Class 1 building and a sole-occupancy units in Class 2 buildings. Energy efficient lighting includes fluorescent and compact fluorescent lights. It does not include incandescent or halogen lights. Compliance is achieved when snergy efficiant lighting is used for at least 40 percent of the total floor area of the building or sole ocsupancy unit. (Floor erea means the area of € room measured within the finished surfaces of the wats, and includes the area occupied by any cupboard or other builtin fumiture, fixture or fitting} This area includes associated garages. Where a part of a house is lit by more than one jight source, and one or more of those light sources is not deemed to be efficient lighting, then that part of the house is not considered to have efticient lighting, and therefore does not ' qualify towards the 40% efficient lighting requirement. ELECTRICAL LEGEND * E rh < o st E 3 2 O Zz 3 hp = S ubo —_ = a = 5S z w/proof power point single power outlet double power outlet ceiling mounfed light wall mounted light fluorescent light spotlight light & fan switch two-way light switch hot water system dishwasher exhaust fan smoke detector range hood stove round 32 fluro hot plates under bench oven tv. point telephone point tv. anfaenna To comply with Part 29 of Queenstand Development Code, Fluorescent lighting must be provided to . of 40% of floor area. ‘AMENDMENTS: COPYRIGHT: This drawing remains the property af Australien Independent Builders, and may not be used or repregjced in whole or in part without written permission. building designers | cient PHILL McGOWAN DRAFTING QBSA No 525708 ~ 102 Fairview Rd Gympie 4570 Phone 0754828350 Mobile 0429645361 Email [email protected] au Project PROPOSED RELATIVES APARTMENT 61LAKE FLAT ROAD BOREEN POINT Drawing ELECTRICAL LAYOUT association ‘of R.& D. HAMMERSLEY 01068 queensland inc. Scale 4: 100 Date 19/11/08 Sheet 12 OF 12 Drawn P.M
Page 79
Sunshi Ine Coast. LAND USE SECTION FEES Regional Council RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation 520 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation 111 APPLICATION FEES . . Material Change of Use - Code/Impact sO Consistent (SSO 521 Inconsistent Ss §21 Assessment under Superseded Planning Scheme 521 Modification to a Development Permit $21 Extension of a Currency Period. 521 Operational Works - Landscaping §21 Bldg Work assessable against the Planning Scheme. — : §21 PRE LODGEMENT REVIEW Half Hour : , . 522 One Hour . §22 ADVERTISING . Purchase Advertised Applications ; 523 JETTIES : Jetty Application Fee - 524 Jetty Bond : , ; . Te, 51 oF : : (Category 4) BONDS * Performance Bond 51 : : (Category 9) . SIGNS Registration Fee : : - . 222 SEARCH FEE . . Search of Land Use Section file. ; 112 | Liquor Licensing Request mo : 113 . ToTaL $¢ [SSO , NAME: a ourtY Oe (oa st Co ex ADDRESS: fOKkbxe 117 Colode Ss x FILE NO: _: DATE: Ay receiptno: 7 Gir} Signature of TP Officer: AUTHORITY NO: 5) Q.0%K iS >| \.
Page 80
CALCULATION OF FEES
APPLICATION
FEE
TOTAL
FEES
MCU - CODE ASSESSMENT
Details of Development
Consistent 1.0
Inconsistent 3.0
FEE CALCULATION
MCU - IMPACT ASSESSMENT
Details of Development
Consistent 1.0
Inconsistent 3.0
FEE CALCULATION
‘ ‘
{OPERATIONAL WORKS
Details of Development
FEE CALCULATION
TOTAL FEES
Used in these records
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.