Skip to the record
For the highest quality transcripts.

Council archive · source document

09/0152 - MCU - Mulitple Housing Type 1 - Relative or Employee [As Published] · 132009.152

of 80

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

CLIMATE ZONE 2 < 300m }

Floor Area 108.3sq. m.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Weatherboard 1.3 |
Plywood cladding 12 | fos
‘Fibre cement cladding 11 |

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SOLUTION W11 TRADAC Technical Data Sheet {Oct.2002) |

Energy Efficiency Timber Framed Construction. ] |
NOTES: NORTH SECTOR | |

REQUIREMENTS FOR ROOF Moximum Effective Glazin . . . ; ; ,
g Area as per Table 3.12.2.1 37% of 108.3sq m. Alt plumbing work to comply with irements in AS/NZS 3500 Climate Region A
Minimum R-Value for roof as per Table 3.12.11 = 2.2 = 40.07sq.m. p ° prambing wor pry wit) energy requ 3
OUTCOME : Install AnticonSS blanket under tin R2.6 + RO.5 for
roof and ceiling materials = total R3.1 7 7
3 Orientation Area PIPE INSULATION
REQUIREMENTS FOR WALLS --- BCA Table 3.12.13 North Elevation | 5.67x 5 = Z83sqm. SYSTEM ELEMENT PIPING LOCATION | R-VALUE | ACCEPTED INSULATION MATERIAL
oo able 3.12.1. East Elevation 12.9sq. m. Cold water connection toHWS | Internal & External
R 1.0 min. required for external walls. South Elevation 10-32sq. m. 3 4 HWS e xternal | 0.3 13mm Closed cell polymer.
West Elevation T08sq. mr. Actual % |Max % -Between closest valve ant
OUTCOME : Total 27.1389. m. 25 37 Outlet piping from HWS.
SOLUTION W11 TRADAC Technical Data Sheet (Oct.2002) NOTES: ' -first 500 mm from HWS or to a As above.
Energy Efficiency Timber Framed Construction. RBM. Reflective Building Membrane. Po ene the first
70 mm timber studs gyprock internal lining, vapour permeable RBM Must have a reflectance of af least 0.95. 9 P.
covered by Hardies Primeline Cladding. Provides R 1.1 Not less than 20 mm between the more reflective Non recirculating hot water External piping
REQUIREMENTS FOR AIR MOVEMENT --- BCA Part 3.12.4 side and a building lining or cladding. Piping. connected to primary As above.
Minimum lap of 150 mm. kitchen sink.
Provision for Air Movement For Habitable Rooms. BULK INSULATION.
as per Table 3.12.4.1 Minimum total ventilation in accordance with AS 2464.3 for loose fill,
opening area per habitable room without ceiling fan. 10% AS 2464.5 for bats. ALL STORAGE HWS TO HAVE A HEAT TRAP WITHIN 1 OUTLET AND BEFORE THE FIRST BRANCH
Installed “(a So that it maintains it's position and thickness A im OFTHE OUTL BE
i jlati i A In ce here there i bulk insulati RBM i ts,
Analysis of Ventilation Opening Requirements So that'd overlaps the wall members by min. 50 mm. and IF NO INTERNAL HEAT TRAP IS AN INTEGRAL PART OF THE WATER HEATER.
Habitable Room floor Ventilation Opening | Window size and Analysis (C} So as to abut other bulk insulation or building members to :
Room area (sq.m) Required ( % & sqm.) ensure there are no voids, other than around domestic services
ee 4 B.6sqm. (10% 2.1% .9 x 2 = 3.78sq.m. or fittings where insulation may effect the safe or effective operation
1.36sq.m. 1.2 x 2.6 x 5 = 1.56sq.m. of the fitting, we ee
Total = 5.34sq.m. complies fo | | |
| Oo |
| L |
| |
1 External cladding | |
Combined Airspase(anti-glare) .
omer | 37-lsq.m. |10% 12x 24 x5 = 1h4sqm. 2 Vapour permeable R.B.M | L
Kitchen & 3Tsqm. - ‘ . . f vee.
" 2.4 x 3.1x.S = 3.72sq.m. 3 Airspace {reflective} | ]
“a x ate = 3 728q.m. 4 Timber stud | |
otal = 8.88sq.m. complies 5 10mm
- gyprock
| |_— |
ITEM TOTAL ‘R’ VALUE i Es (— |

WHEN SERVING A CONDITIONED SPACE,

A seal to restrict air infiltration must be fitted to each edge of an external door,
openable window, and other such openings.
A roof light must be sealed, or capable of being sealed, in accordance with WEST SECTOR

 

 

 

EAST SECTOR |

 

(1) An imperforate ceiling difuser or the like installed at the ceiling or
internal lining level, or eee ee ee ee ee Oe ee ee eee ed
(2) A shutter system readily operated either manually, mechanically or electronically
by the building occupant. =
An exhaust fan must be fifted with a sealing device such as a self-closing damper, SOUTH SECTOR
filter or the like. i BREEZE PATH REQUIREMENTS COMPLY WITH BCA CLAUSE 2.12.4.2

 

 

‘AMENDMENTS PHILL MCGOWAN DRAFTING QBSA No 525708 NY
102 Fairview Rd Gympie 4570 Phone 0754828350 Mobile 0429645361 Email [email protected]
Project PROPOSED RELATIVES APARTMENT
Location §1LAKE FLAT ROAD BOREEN POINT
Drawing ENERGY EFFICIENCY REQUIREMENTS

building designers Drawn P.M.

COPYRIGHT: This drawing remains the property'oy Australian Independent Builders, association “of
and may net be used of reproduced in whole of i part without written peraission. queensland inc. | scate - Date 19/11/08 Sheet 4 of 12

 

| Client R.& D. HAMMERSLEY 01088

 

 

 

 

 

Used in these records

About this file

File size
4.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0152 - MCU - Mulitple Housing Type 1 - Relative or Employee [As Published].pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.