Council archive · source document
Planning Report 2020 · MCU20/0090
proposal report
The proposal has been reviewed against the Waterways Works Code (refer Appendix C) and is considered
to comply with the Overall Outcomes of the code.
The proposal has been reviewed against the Recreation and Open Space Code (refer Appendix D) and is
considered to comply with the Overall Outcomes of the code.
The proposal has been reviewed against the Business Activities Code (refer Appendix E) and is considered
to comply with the Overall Outcomes of the code.
5.0 State assessment and other matters
5.1 State interests
The proposal is required to be assessed against State Code 8: Coastal Development and Tidal Works. A
review of the proposal is included in Appendix F which demonstrates that the proposed works comply with
the State Code.
martoo consulting
town planners + urban designers + development managers page 9 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Planning Report 2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.