Placement of heavy ‘builders plastic’ or filter ‘cloth’, pinned to batters may be required if heavy of prolonged rainfall occurs during construction. Exposure of temporary batters should be minimised in order to limit shrinkage cracking in clayey soils and potential development of temporary instability. Ground surfaces should be graded to shed surface water runoff away from construction areas. It should be noted that during wet weather, the natural soils may cause turbid stormwater run-off. Appropriate erosion and sediment control measures must be installed prior to commencement of earthworks at this site. The above recommendations do not supersede any existing safety regulations or legislation applicable to excavations (e.g. limits on personnel entry into trenches). The residual soils and weathered rock where broken down to <100 mm particles, as encountered in the test pits would be suitable for use as structural fill, subject to appropriate moisture conditioning and compaction. It is noted that placement of any site won materials as fill would have an effect on the site classification (Ref. Section 7.3.1 below). All fill must be ‘benched’ into the natural slope, over-filled by at least half-width of the compaction plant (horizontally), and then trimmed back to the well compacted material. It is recommended that any imported fill should comply with the following: ▪ Minimum CBR of 10 % ▪ Maximum plasticity index of 15 % ▪ Shrink-swell index ≤ 1 % ▪ Maximum particle size of 100 mm Fill should be compacted at moisture contents within the range of ±2 % of optimum moisture content for Standard Compaction. Select fill should have a maximum particle size of 100 mm for an uncompacted layer thickness of 200 mm and shall be compacted by repeated rolling with a small compactor to achieve a dry density ratio of at least 95 % of the Standard Maximum Dry Density for cohesive soils, or 70 % Dry Density Index for any imported cohesionless soils. Confirmatory compaction testing should be carried out at regular intervals. A minimum of two tests per vertical lift is recommended where structural fill heights are to exceed 300 mm. Further details for control and testing of fill are given in Australian Standard AS 3798-2007 Guidelines on Earthworks for Commercial and Residential Developments. 7.3 Building Foundations 7.3.1 Preliminary Site Classification Based on the results of the investigation, the site classification for the proposed new lots is estimated to be Class M in accordance with AS 2870-2011 Residential Slabs and Footings. It should be noted that the predicted order of movement is based on the existing natural soil profiles, and moisture content changes within soils due to normal seasonal moisture variations only. Where up to 1 m of fill was placed as part of an earthworks building pad, for example, the site classification would extend to Class H1. Reactive soil movements and site classification should be assessed by the footing design engineer at Building Works stage to consider the extent of earthworks proposed, together with any removed/retained trees (yt factor). Geotechnical Investigation 10 June 2026 | 26073-001-Rev0 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.