Appendix D - Geotechnical Report
Very large file (16.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Executive Summary This report presents the results of a geotechnical investigation and slope stability assessment undertaken by Tectonic for Threedom Nominees Pty Ltd. Proposed layout plans indicate that an existing single rural allotment (Lot 3 on SP258991) will be subdivided in to five future allotments. No significant earthworks are anticipated for the subdivisional works, with all lots having direct frontage to Black Mountain Range Road. The investigation comprised a site walk-over by an experienced engineering geologist and excavation of seven test pits to depths between 1.2 m and 3.1 m below ground level (BGL), together with in situ strength testing and targeted laboratory testing. No groundwater was encountered in the test pits at the time of investigation; however, seepage may develop following prolonged or heavy rainfall. Published mapping indicates the site is underlain by the middle Triassic age Kin Kin Beds (meta- sedimentary strata). Test pits generally encountered a profile in line with this, featuring a thin topsoil layer (0.1 m to 0.2 m BGL) underlain by very stiff residual soils and extremely weathered (XW) materials to about 0.8 m to 1.3 m BGL, then highly to distinctly weathered, very low to low strength phyllite to the termination depths. Quartz veins were encountered at two test pit locations. The site walk-over did not identify indicators of existing slope instability within the proposed development areas (e.g. tension cracking, hummocky ground or the like) and the proposed building areas were generally positioned on favourable rounded spur crests or broad flank slopes. A Low Risk of instability for the proposed subdivision would be achievable, with an acceptable minimum factor of safety against global instability in excess of 1.5. From a geotechnical and slope stability perspective, the proposed subdivision layout is considered acceptable. Key recommendations for future development (per-lot, at Building Works stage) include: minimising cut and fill; limiting unretained fill to 1 m height where natural slopes are 10° or greater (or otherwise providing engineered retention); and undertaking site-specific geotechnical assessment for each dwelling location within the nominated building envelopes. Footings supporting structures (including retaining walls) are to penetrate through fill and any unsuitable natural soils (if encountered) and be founded a minimum of 0.5 m into stiff (or stiffer) residual soils. Conventional footings may be suitable in some areas; however, bored piles are anticipated where fill pads are constructed or buildings are located on steeper ground. A preliminary site classification of Class M (according to AS 2870-2011) would apply for the existing natural subsurface profiles, extending to Class H1 where up to 1 m of fill is placed. Surface and subsurface drainage must be designed to divert stormwater away from building platforms, batters and retaining structures, with collected flows discharged in lined drains/pipes to stable outlets at least 5 m downslope of structures. Subsurface disposal of stormwater is not recommended. As reticulated sewer is not available, on-site wastewater treatment and disposal will be required for each lot. The land application area required for each lot varies due to slope reduction factors (per AS1547:2012). For feasibility these have been estimated as the following: ▪ Lots 1 & 2: 470 m² ▪ Lots 3 & 4: 840 m² ▪ Lot 5: 420 m² Prior to construction, a site specific ‘soil test,’ slope stability assessment and effluent disposal design should be prepared for future building works on each of the proposed allotments. Geotechnical Investigation 10 June 2026 | 26073-001-Rev0 ii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.