iv. likely numbers of users;
v. accessibility to the site by means other than private motor vehicle;
vi. the peak parking demand periods of uses on the site; and
vii. the availability of alternative car parking; and
b. is provided to accommodate the number and type of vehicles and motorcycles likely to be
generated by the development.
ASSSESSMENT
The proposal does not meet the numerical acceptable outcomes in AO35 of the Medium Impact
Industry Zone Code and AO6.1 of the Driveways and Parking Code, as application of the
prescribed rate of 1 space per 20m² to the full 297m² tenancy would require 15 car parking spaces.
Accordingly, the proposal is assessed against PO35 and PO6 to determine whether sufficient
parking is available having regard to the actual demand likely to be generated by the use.
With respect to the type and intensity of the land use and the likely number of users, the principal
parking-generating components are the 92.5m² dance studio and 26.2m² training room, which have
a combined area of 118.7m² and generate a requirement for 6 spaces at the applicable rate. The
balance of the tenancy comprises ancillary reception, waiting, storage, staff and office areas and
would not generate parking demand at the same intensity as the active recreation areas. Class
sizes are controlled, students may attend consecutive classes, and staggered start and finish times
avoid all users arriving and departing simultaneously. Further, a maximum of 15 students are
expected to attend classes at any one time. In conjunction with the staggered class approach, the
car parking provision both on site and within the immediate surrounding area is considered capable
of accommodating the demand generated by the proposal.
In relation to existing and alternative parking, 18 spaces are available across the Gateway Centre
(40 Gateway Drive). The previously approved service shop and service industry uses would require
15 spaces under the current planning scheme, leaving a surplus of 3 spaces within the centre. The
historic average parking rate for the subject tenancy also provides an existing-use credit of
approximately 5 spaces. Although this produces a nominal one-space shortfall when compared
with the 6 spaces attributed to the active recreation areas, that demand can be accommodated by
the 3-space surplus available elsewhere within the centre.
The hours of operation and peak demand periods also support the performance-based outcome.
The academy operates seven days a week, with peak attendance generally occurring from the
afternoon into the evening when parking demand from surrounding industrial premises is reducing.
A managed drop-off and pick-up arrangement limit the duration of parent and carer parking, and
the submitted Parking and Class Time Management Plan provides for active supervision and
ongoing management of parking and vehicle movements. The academy has operated under a
similar model in Noosaville for approximately 15 years. While private vehicles are expected to
remain the primary means of access, the staggered class timetable, consecutive student
attendance and short-duration drop-off and pick-up movements reduce the concentration and
duration of demand. Having regard to the type and intensity of the use, existing parking, operating
hours, likely user numbers, accessibility by other modes, peak parking periods and alternative
parking within the Gateway Centre, sufficient parking is available to accommodate the number and
type of vehicles and motorcycles likely to be generated by the development.
As part of the applicant’s information request response, time stamped photographs were provided
of the onsite car park and the on street car parking were taken at various times of day. The
photographs suggest that after 3;30pm the neighbouring’ tenancies and nearby businesses are
winding down their activities or closed for the day. The period after 3:30pm coincides with the
academy’s afternoon and evening class schedule. This suggests that the academy’s peak periods
will be outside of the neighbouring tenancies and nearby businesses peak demand times for car
parking.
The proposal therefore satisfies PO35 of the Medium Impact Industry Zone Code and PO6 of the
Driveways and Parking Code, despite not meeting the numerical acceptable outcomes.
Page 5 of 8
Document Set ID: 25237619
Version: 6, Version Date: 23/10/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU26 0067 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.