Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Delegated Report - Code - Planning MCU26 0067 (As Published) · MCU26/0067

of 8

Text shows just the words. Original shows the document exactly as it was published.

                        iv.     likely numbers of users;
                        v.      accessibility to the site by means other than private motor vehicle;
                        vi.     the peak parking demand periods of uses on the site; and
                        vii.    the availability of alternative car parking; and
                b.      is provided to accommodate the number and type of vehicles and motorcycles likely to be
                        generated by the development.

               ASSSESSMENT
               The proposal does not meet the numerical acceptable outcomes in AO35 of the Medium Impact
               Industry Zone Code and AO6.1 of the Driveways and Parking Code, as application of the
               prescribed rate of 1 space per 20m² to the full 297m² tenancy would require 15 car parking spaces.
               Accordingly, the proposal is assessed against PO35 and PO6 to determine whether sufficient
               parking is available having regard to the actual demand likely to be generated by the use.
               With respect to the type and intensity of the land use and the likely number of users, the principal
               parking-generating components are the 92.5m² dance studio and 26.2m² training room, which have
               a combined area of 118.7m² and generate a requirement for 6 spaces at the applicable rate. The
               balance of the tenancy comprises ancillary reception, waiting, storage, staff and office areas and
               would not generate parking demand at the same intensity as the active recreation areas. Class
               sizes are controlled, students may attend consecutive classes, and staggered start and finish times
               avoid all users arriving and departing simultaneously. Further, a maximum of 15 students are
               expected to attend classes at any one time. In conjunction with the staggered class approach, the
               car parking provision both on site and within the immediate surrounding area is considered capable
               of accommodating the demand generated by the proposal.
               In relation to existing and alternative parking, 18 spaces are available across the Gateway Centre
               (40 Gateway Drive). The previously approved service shop and service industry uses would require
               15 spaces under the current planning scheme, leaving a surplus of 3 spaces within the centre. The
               historic average parking rate for the subject tenancy also provides an existing-use credit of
               approximately 5 spaces. Although this produces a nominal one-space shortfall when compared
               with the 6 spaces attributed to the active recreation areas, that demand can be accommodated by
               the 3-space surplus available elsewhere within the centre.
               The hours of operation and peak demand periods also support the performance-based outcome.
               The academy operates seven days a week, with peak attendance generally occurring from the
               afternoon into the evening when parking demand from surrounding industrial premises is reducing.
               A managed drop-off and pick-up arrangement limit the duration of parent and carer parking, and
               the submitted Parking and Class Time Management Plan provides for active supervision and
               ongoing management of parking and vehicle movements. The academy has operated under a
               similar model in Noosaville for approximately 15 years. While private vehicles are expected to
               remain the primary means of access, the staggered class timetable, consecutive student
               attendance and short-duration drop-off and pick-up movements reduce the concentration and
               duration of demand. Having regard to the type and intensity of the use, existing parking, operating
               hours, likely user numbers, accessibility by other modes, peak parking periods and alternative
               parking within the Gateway Centre, sufficient parking is available to accommodate the number and
               type of vehicles and motorcycles likely to be generated by the development.
               As part of the applicant’s information request response, time stamped photographs were provided
               of the onsite car park and the on street car parking were taken at various times of day. The
               photographs suggest that after 3;30pm the neighbouring’ tenancies and nearby businesses are
               winding down their activities or closed for the day. The period after 3:30pm coincides with the
               academy’s afternoon and evening class schedule. This suggests that the academy’s peak periods
               will be outside of the neighbouring tenancies and nearby businesses peak demand times for car
               parking.
               The proposal therefore satisfies PO35 of the Medium Impact Industry Zone Code and PO6 of the
               Driveways and Parking Code, despite not meeting the numerical acceptable outcomes.
                                                                                                       Page 5 of 8

Document Set ID: 25237619
Version: 6, Version Date: 23/10/2026

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU26 0067 (As Published).pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.