Original source · versioned page text
Operational Works Application OPW17/0600
so om on Kerb invert w2 Pregerty boundary 3 + Refer sections AcB ao drawing number RS-05 300 mx vertical tronsition length weut to allow clean a # back of herb and channel. [we ; - Existing path ta be saw cut and removed prior to Crassing construction, Existing/future concrete path refer note 23 on RS-OS0, SETOUT REQUIREMENTS
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Operational Works Application OPW17_0600.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.