Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Operational Works Application OPW17/0600

of 14

Page text read automatically using OCR, there may be inaccuracies

 

Department of Infrastructure, Local Government and Planning

Section 2 — Further development details

7) Doés the proposed development application involve any of the following?

 

Material change of use LJ Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot L] Yes — complete division 2

Operational work CL] Yes -— complete division 3

Building work CJ Yes — complete DA Form 2 — Building work details

 

Division 1 — Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a local
planning instrument.

    

8.1) Describe the ee material change of use

Provide a general description of the Provide the planning scheme definition | Number of dwelling | Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m?)
(if applicable)

 

 

 

 

 

 

 

  
 

  

8.2) Does the proposed use Involve the use Of existing buildings on the premises?
1 Yes
Bf No

 

Division 2 — Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.

9.1) What is the total number of existing lots making up the premise:

   

 

 

9.2) What is the nature of the lot reconfiguration? ( Joye) for PC]
LD Subdivision (complete 10) C Dividing !and into parts by agreement (complete 11))
CL Boundary realignment (complete 12) CL Creating or changing an easement giving access to a lot from

a construction road (complete 13))

 

  

10) Subdivision
10.1) For this development, how many lots are being created and what is the intended use of thnse Ints:

Commercial Industrial Other, please specify:

 
  
 

      

    

Residential

   

Intended use of lots created

Number of lots created
10.2) Will the subdivision be staged?

LD Yes — provide additional details below

L] No

How many stages will the works include?
What stage(s) will this development application

 

 

 

 

 

 

 

 

 

apply to?
2B (a) b greeme ) F pa are being create & a1 SO Ls A a
Intended use of parts created Residential Commercial Industrial Other, please specify:

 

 

 

 

 

 

 

 

Number of parts created

 

Page 4
DA Form 1 — Development Application details
Version 1.0—3 July 2017

Log in to download the original (Operational Works Application OPW17_0600.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.