Council archive · source document
09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
EXAMPLES OF GOOD HILLSIDE PRACTICE £28
VEGETATION
RETAINED
ACOF WATER
PIPED OFF SITE.
CUT A FILL
MINNISED
. a@eoaoce
ome
ere rourarons
NTO ROCK
SUBSOWL ORAINAGE
MAY BE REQUIRED
AE SLOPE
SEWERAGE EFFLUENT PUMPCD- OUT
OA COMMECTED [0 SEWEA,
TAMAS ADZGUATELY FOUNDED
ENGINEERED RESAULAKG WALLS
WITH SURTACE & SUBSURFACE
BRAINAGE COUSTRUCTED
SEFORE HOUSE
EXAMPLES OF POOR HILLSIDE PRACTICE
UMSTABILISED
ROCK TOPPLES
VEGETATION
IMADEQUATELY
ar PALS OF FOUNDED
ROCK
VEGETATION
REMOVED .
SATURATED
SLOPE Fale.
Se
ia
\ PouDlD WATER ENTERS
SLOPE & ACTIVATES SUP
FIGURE 1 Illustrations of Good and Poor Hillside Practice
This ‘gure Is on dxtract fram CEQTECHNICAL RISKS ASSOCIATED WITH HILLSIDE OEVELOPIMENT as presented in Australian
Geomechanics Nawa, Number $0, December, 3985, which discusses tho mattar mare Sully.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1382 - Operational Works - Landscaping & Civil Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.