Skip to the record
Accept no imitations.

Council archive · source document

09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382

of 117

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

PROPOSED TEMPORARY CONSTRUCTION —4
“\— BATTER 1v TO 1.5h IN ACCORDANCE WITH \
GEOTECHNICAL REPORT Z ‘ PROPOSED BUILDING RETAINING STRUCTURE
REFER FUTURE STRUCTURAL ENGINEERING

 
 

 

 

        

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

{ ‘ DRAWINGS
( CO ) )
/ \ / , 7 \ \
/ /
/ ~ VW DENOTES TEMPORARY SEDIMENT FENCE
/ ae | | FINAL EXTENT TO BE REVIEWED AND
/ DETERMINED ON SITE
| | x WALL HEIGHT 1.8m
| DENOTES APPROX LOCATION OF
2 TREES TO BE RETAINED, CONFIRM
S | WITH LANDSCAPE DRAWINGS
S|
al
2 |
= |
“|
ie |
uw
w |
7 |
E
no |
<x
a | .
2 |
=a
a | |
1
ROCK FILTER DAM WITH OVER-TOPPING CREST
| LOCATED AT CENTER LINE OF LEVEL SPREADER
| ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN
|
|
| CONSTRUCT LEVEL SPREADER
| | DURING INITIAL EARTHWORKS STAGE
| REFER SHEET 8 FOR DETAILS
4S | \ A
YS
\ - EXCAVATE DETENTION BASIN DURING INITIAL
\ es EARTHWORKS STAGE
\ Te LINE SIDES WITH GEOFABRIC AND LOOSE PLACED
STONE PITCHING AS REQUIRED
ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN
- - \. \ |
L <
PROPOSED TEMPORARY \L
—) CONSTRUCTION ees DENOTES TEMPORARY SEDIMENT FENCE |
SITE PLAN FINAL EXTENT TO BE REVIEWED AND
SCALE 1-200 DETERMINED ON SITE |
PROPOSED TEMPORARY CONSTRUCTION PROPOSED BUILDING RETAINING STRUCTURE
ELANDA BATTER 1v TO 1.5h IN ACCORDANCE WITH REFER FUTURE STRUCTURAL ENGINEERING
STREET GEOTECHNICAL REPORT DRAWINGS
PROPOSED BUILDING OUTLINE EXCAVATE DETENTION BASIN DURING INITIAL
EARTHWORKS STAGE
a a LINE SIDES WITH GEOFABRIC AND LOOSE PLACED REE TNE OF LEVEL SPREADER
STONE PITCHING AS REQUIRED
| cut ; PAD LEVEL 48.40 ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN
Sree

 

      

y-— CONSTRUCT LEVEL SPREADER
/ DURING INITIAL EARTHWORKS STAGE

REFER SHEET 8 FOR DETAILS

SECTION A
SCALE 1:200

 

 

PLAN TITLE

    

 

    

 

 
    

 

 
  

 

 
 
   

 

CONTOUR | 5 4PaRTMeENT DeveLoPpMeNnT = = eT poe wx | GARTH WORKS, SEDIMENT AND
Consulting Engineers 4;| AT 43-45 ELANDA ST, SUNSHINE BEACH | = T cece as EROSION CONTROL PLAN
EEE KOR OAK INVESTMENT HOLDINGS P/L = ; : er oe

lata rea hanna . I oO ae: | mane 6083 = OPWE ween B armen 9 oF 8

cr

  

Used in these records

About this file

File size
20.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1382 - Operational Works - Landscaping & Civil Works [As Published].pdf · 20.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.