Council archive · source document
09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
PROPOSED TEMPORARY CONSTRUCTION —4
“\— BATTER 1v TO 1.5h IN ACCORDANCE WITH \
GEOTECHNICAL REPORT Z ‘ PROPOSED BUILDING RETAINING STRUCTURE
REFER FUTURE STRUCTURAL ENGINEERING
{ ‘ DRAWINGS
( CO ) )
/ \ / , 7 \ \
/ /
/ ~ VW DENOTES TEMPORARY SEDIMENT FENCE
/ ae | | FINAL EXTENT TO BE REVIEWED AND
/ DETERMINED ON SITE
| | x WALL HEIGHT 1.8m
| DENOTES APPROX LOCATION OF
2 TREES TO BE RETAINED, CONFIRM
S | WITH LANDSCAPE DRAWINGS
S|
al
2 |
= |
“|
ie |
uw
w |
7 |
E
no |
<x
a | .
2 |
=a
a | |
1
ROCK FILTER DAM WITH OVER-TOPPING CREST
| LOCATED AT CENTER LINE OF LEVEL SPREADER
| ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN
|
|
| CONSTRUCT LEVEL SPREADER
| | DURING INITIAL EARTHWORKS STAGE
| REFER SHEET 8 FOR DETAILS
4S | \ A
YS
\ - EXCAVATE DETENTION BASIN DURING INITIAL
\ es EARTHWORKS STAGE
\ Te LINE SIDES WITH GEOFABRIC AND LOOSE PLACED
STONE PITCHING AS REQUIRED
ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN
- - \. \ |
L <
PROPOSED TEMPORARY \L
—) CONSTRUCTION ees DENOTES TEMPORARY SEDIMENT FENCE |
SITE PLAN FINAL EXTENT TO BE REVIEWED AND
SCALE 1-200 DETERMINED ON SITE |
PROPOSED TEMPORARY CONSTRUCTION PROPOSED BUILDING RETAINING STRUCTURE
ELANDA BATTER 1v TO 1.5h IN ACCORDANCE WITH REFER FUTURE STRUCTURAL ENGINEERING
STREET GEOTECHNICAL REPORT DRAWINGS
PROPOSED BUILDING OUTLINE EXCAVATE DETENTION BASIN DURING INITIAL
EARTHWORKS STAGE
a a LINE SIDES WITH GEOFABRIC AND LOOSE PLACED REE TNE OF LEVEL SPREADER
STONE PITCHING AS REQUIRED
| cut ; PAD LEVEL 48.40 ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN ALTERNATIVELY CONSTRUCT FULL DETENTION BASIN
Sree
y-— CONSTRUCT LEVEL SPREADER
/ DURING INITIAL EARTHWORKS STAGE
REFER SHEET 8 FOR DETAILS
SECTION A
SCALE 1:200
PLAN TITLE
CONTOUR | 5 4PaRTMeENT DeveLoPpMeNnT = = eT poe wx | GARTH WORKS, SEDIMENT AND
Consulting Engineers 4;| AT 43-45 ELANDA ST, SUNSHINE BEACH | = T cece as EROSION CONTROL PLAN
EEE KOR OAK INVESTMENT HOLDINGS P/L = ; : er oe
lata rea hanna . I oO ae: | mane 6083 = OPWE ween B armen 9 oF 8
cr
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1382 - Operational Works - Landscaping & Civil Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.