ROADWORKS NOTES

1 THE CONTRACTOR SHALL ESTABLISH THE LOCATION. LINE & LEVEL OF

ALL PUBLIC & PRIVATE UTILITY SERVICES PRIOR TO COMMENCEMENT

OF ANY CONSTRUCTION. WHERE UTILITY SERVICES ARE SHOWN ON

THE PLANS. THEY ARE SHOWN FOR THE INFORMATION OF THE

CONTRACTOR ONLY THE PRINCIPAL SHALL NOT BE LIABLE FOR ANY

OMISSION OF SERVICES FROM THE PLANS OR THE ACCURACY OF ANY

SERVICES SHOWN ON THE PLANS.

SURFACE LEVELS OVER THE SITE HAVE BEEN INTERPOLATED THROUGH

COMPUTER MODELLING OF FIELD SURVEY DATA THESE CALCULATED

LEVELS MAY VARY FROM THE ACTUAL GROUND LEVEL

ALL CONSTRUCTION LEVELS SHALL BE SET BY THE CONTRACTOR WITH

REFERENCE TO SURVEYED BENCH MARKS PROVIDED BY THE

PRINCIPAL'S APPOINTED SURVEYOR

4 SUBGRADE EVALUATION IS TO BE UNDERTAKEN IN ACCORDANCE WITH
THE PROCEDURES OUTLINED IN ARRB SR41 - ASTRUCTURAL DESIGN
GUIDE FOR FLEXIBLE RESIDENTIAL STREET PAVEMENTS.

5, ALL KERBING SHALL CONFORM TO NOOSA SHIRE COUNCIL'S
RELEVANT STANDARD DRAWINGS.

6 PAVEMENT MARKINGS AND SIGNS PROVIDED IN ACCORDANCE WITH
THE QUEENSLAND MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES.

7, PROVIDE TELSTRA AND ENERGEX CONDUITS UNDER CONCRETE DRIVE-

WAYS, WHERE DIRECTED.

SET-OUT OF ROAD AND DRAINAGE WORKS IS AVAILABLE TO CONTRACTOR

FROM CONTOUR ENGINEERS DIGTAL MODEL

 

NOTE
EXTENT OF CONNECTION TO BE DETERMINED ON SITE DURING
CONSTRUCTION BY ENGINEER & COUNCILS FIELD OFFICER.

 

 

 

150

150

       

 

TOTAL SEAL OVERLAP = 300mm
(SMOOTH TRANSITION TO
EXISTING BITUMEN)

SAW-CUT EXISTING
PAVEMENT

INDICATIVE SAW-CUT DETAIL
SCALE 1:50

EXISTING PAVEMENT NEW PAVEMENT

 

DRIVE OVER KERB

30mm ASPHALTIC AND CHANNEL

CONCRETE SURFACING

FSL

 

100mm THICK BASE COURSE MATERIAL (TYPE 2.2) - CBR 60 MIN (SOAKED) ON

100mm THICK SUB-BASE COURSE MATERIAL (TYPE 2.4) - CBR 45 MIN (SO;
2 100mm THICK LOWER SUB-BASE COURSE MATERIAL (TYPE 2.5) - CBR 15

ASPHALTIC CONCRETE
PAVEMENT DESIGN (INDICATIVE)
SCALE 1:50

EXISTING EDGE OF BITUMEN

DENOTES EXISTING
SURFACE LEVEL

'
'

DENOTES EXTENT OF

NEW PAVEMENT SEAL!

30.000 | cal
1

                   

ELANDA STREET

EXISTING CENTRE LINE “nel

 

 

10 woo |
1 ce &

 

 

 

'
'
'
'

ase 5

0.000
| JOIN NEATLY TO

| EXISTING KERB &
| CHANNEL
'

|

JAKED) ON
MIN (SOAKED).

 

 

 

 

 

 

  

 

%* NOTE
FINAL PAVEMENT DEPTH TO BE CONFIRMED FOLLOWING
SITE SOIL TESTS UNDERTAKEN IN THE EXCAVATED ROAD
BOX BY THE GEOTECHNICAL CONSULTANT

 

\

LAYOUT P'

 

 

 

CONTOUR

Consulting Engineers 3

2-117 061 160

P Se Ce E

SCALE 1:200

5 APARTMENT DEVELOPMENT
AT 43-45 ELANDA ST, SUNSHINE BEACH
FOR OAK INVESTMENT HOLDINGS P/L

\
Le

JOIN NEATLY TO EXISTING
KERB & CHANNEL

EXISTING CONCRETE
FOOTPATH

FOOTPATH

+— NEW SEMI-MOUNTABLE
KERB & CHANNEL

REFER ARCHITECTS PLANS
FOR SET OUT

 

NEW 5.5m WIDE
CROSS OVER

JOIN NEATLY TO EXISTING
FOOTPATH

EXISTING CONCRETE
FOOTPATH

 

JOIN NEATLY TO EXISTING

 

  

 

  

 

t— NEW 1.5m WIDE CONCRETE FOOTPATH

 

 

   

 

 

 

4630
= TING CONCRETE a
EXISTING ROAD 3s EXIS cs cl &
CENTRELINE KR FOOTPATH 5
“ a
“OATUMS1O) EH
30.000
NEW 1.5m WIDE 4
CONCRETE FOOTPATH a
2 |
a
a
-DATUMSI0 tf ee es StS
20.000
SAW CUT EXISTING PAVEMENT SUB-SOIL DRAINAGE IN
AND JOIN NEATLY & SMOOTHLY ACCORDANCE WITH
NSC STD DWG
4760
52
2360 a
5 5 & NEW 1.5m WIDE a,
S Ine CONCRETE FOOTPATH ©
9)
ST 4.8% ST 26%
GATOMSI OG) a a eye err er ON pee einen ree REE elie eae
10.000 NEW DRIVE OVER KERB AND
CHANNEL IN ACCORDANCE
WITH NSC STD DWG No. 9001
| 4610 |
ve EXISTING CONCRETE 8
o> @° FOOTPATH a
32 e ©
“ 2.2% a |
JORTUM SIG 3 gee
0.000

 

KERB AND CHANNEL

ELANDA STREET CROSS SECTIONS
SCALE 1:100

 

 

 

 

CAUTION - EXISTING SERVICES
THE CONTRACTOR IS TO DETERMINE THE EXACT LOCATION OF

ALL EXISTING SERVICES IN THE VICINITY OF THE PROPOSED

WORKS PRIOR TO THE START OF ANY CONSTRUCTION

THE COST OF ANY RECTIFICATION WORKS DUE TO DAMAGE TO
EXISTING SERVICES SHALL BE BORNE BY THE CONTRACTOR

 

 

 

 

 

A

e

 

 

 

EXTERNAL ROAD AND
FOOTPATH WORKS PLAN

DRIVE OVER KERB
AND CHANNEL
SCALE 1:20

 

 

 

 

punns SOB3 - OPS REVISION. B

sneer 6 of @

Used in these records

About this file

File size
20.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1382 - Operational Works - Landscaping & Civil Works [As Published].pdf · 20.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.