Skip to the record
Every meeting, every word.

Council archive · source document

09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382

of 117

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

1.0

INTRODUCTION

4.1 Preamble

This stormwater treatment system manual has been compiled to generally satisfy
Items 30 and 31 of the Sunshine Coast Regional Council's Decision Notice (Ref
2007/2174), dated 15 May 2008.

This report is to assist maintenance staff in the general upkeep of the stormwater
treatment systems.

1.2 Site Location

The subject site is located at 43-45 Elanda Street, Sunshine Beach, and is
described as Lots 399 & 400 on RP 48112. The site has an area of
approximately 0.15 ha.

Refer Figure 1.0 in Appendix A for Site Locality Plan and Figure 2.0 in Appendix
A for Aerial Photograph.

1.3 Description of the Proposal

The applicant proposes to construct a development comprising of five (5)
apartments, with associated driveways, swimming pools and car parking areas.
Additionally, the development will contain a detention basin to aid in the provision
of non-worsening of stormwater flows, and a gross pollutant trap with
hydrocarbon arrestor.

1.4 Treatment Systems
The following stormwater infrastructure has been installed at the site
i. Stormwater Detention System

Duke Environmental Drawing DE0731/03A included in Appendix A
indicates the location of the stormwater detention system. Appendix B
contains the maintenance schedule/actions for the system. Refer Contour
Consulting Engineers for detailed design drawings.

ii. | Fox BPT600 Gross Pollutant Trap and hydrocarbon arrestor

Duke Environmental Drawing DE0731/03A included in Appendix A
indicates the location of the unit. Appendix B contains general
maintenance schedule/actions for the system, and additionally, Appendix
C contains specific vendor supplied maintenance and operation advice for
the unit. Refer Contour Consulting Engineers for detailed design drawings.

1.5 Maintenance

The stormwater treatment systems shall be maintained generally in accordance
with the Maintenance Schedule/Actions included in Appendix B, and Appendix C.

 

AG07310MM
October 2009

ATfs

Used in these records

About this file

File size
20.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1382 - Operational Works - Landscaping & Civil Works [As Published].pdf · 20.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.