Council archive · source document
09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
coffey geotechnics
dynamic
test results
SPECIALISTS MANAGING THE EARTH
enetrometer
1/36 Kerry] Street, Kunda Park, QLD.4556
Ph: {071 5445 4952 Eox: (07) 5445 3764
page 1 of 10
client :
principal :
project :
CONTOUR CONSULTING
43-45 Elanda Street, Sunshine Beach
focation : Refer Plan
job no: GETOKPARO1334AA
laboratary’: Kunda Park
January 18, 2008
GEOTKPARO1334AA-B
report date :
test raport no. :
test procedure :
AS1289 6.3.2
test date : 15/1/08
depth betow
surface
(mm)
Test Numbers
teadings recorded in blows per 100mm
BH1
test locations/remarks
100
200
300
~
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
wnlalalajalalafepayofufo]s
1700
1800
To wosion [HEL eT MUN Unog
1900
2000
2100
2200
2300
2400
2500
wofoajalalalapaj apa
2600
~
Ss
2700
70
General Information ;
Add
‘TBLYSIO}OVH AI}jOD {3
ee
NATTA
wome wseeameds
Aooncerraviced
This document is issued in accordance with NATA’s
accreditation requirements. Accreditad for compliance with
ISO/IEC 17028. This document may not ba reproducad
except in full.
NATA Accredited Laboratory
No. 431
Approved Signatory:
‘ o_O
Date: 14fe2,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1382 - Operational Works - Landscaping & Civil Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.