Council archive · source document
09/1382 - Operational Works - Landscaping & Civil Works [As Published] · 142009.1382
Very large file (20.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
coffey
a
“e geotechnics
SPECIALISTS MANAGING THE EARTH
dynamic penetrometer
test results
1/36 Karryl Street, Kunda Park, OLD,.4556
Ph: (07) 5445 4952 Fax; {07} 5445 3764
page 6 of 10
principal :
client: CONTOUR CONSULTING
Project: 43-45 Elanda Street, Sunshine Beach
location : Refer Plan
job no: GEOTKPARO7334AA
laboratory : KUNDA PARK
report date : January 18, 2008
test report no. : GEOTKPARO1334AA-8
test procedure: AS77289 6.3.2
test date : 15/1/08
wi
depth below
surface
{mm}
test numbers
readings recorded in blows per 100mm
BH3
test locations/remarks
2800
2800
3000
10
3100
10
3200
3300
3400
3500
3600
3700
3800
3900
4000
4100
4200
4300
4400
4600
15 WOSIA LEED CT
4600
4700
4800
4900
s000
5100
$200
§300
§400
General !nformation :
SACOD
NOSE AB)
SD0Z + BIT Ald
NATTA
Se
wore neaoowenn
RGaraarraricee
This document is issued In accordance with NATA‘s
accreditation requirements. Accredited for compliance with
ISOAEC 17025. This docurnent may not be reproduced
except in full.
NATA Accredited Laboratory Date : [ffer
No. 431 ;
Approved Signatory: _
a
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1382 - Operational Works - Landscaping & Civil Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 20.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.