SCG) consulting EnciNeers

WORKING FOR YOUR PROJECTS SUCCESS

STORM WATER MANAGEMENT PLAN

Address : 4 Crank Street
Sunshine Beach
Client :S Lehmann
Date : 21 March 2014
Report No : 24056(SWM)

p 07 5455 5604

f 075455 5696

e [email protected]

www.scg-engineers.com

po box 1661 noosa heads qld 4567

unit 1/11 project ave noosaville qld 4566 STRUCTURAL ®* CIVIL *GEOTECHNICAL

Debuild Pty Ltd Tradingas = ABN 40098 481 899
Full text of the other 5 pages

Page 2

1.0 INTRODUCTION:
SCG Consulting Engineers have been commissioned to provide a Storm Water Management Plan for
the proposed development at 4 Crank St, Sunshine Beach.

The objective of this plan is to demonstrate that the following measures will be incorporated into the
design and construction of the development:-

e Maintain stormwater quality — Protect receiving waters
e Manage storm water rates of runoff and existing flow path characteristics
e Protect against flooding

e Adopt Water Sensitive Urban Design (WSUD) principles throughout.

This report should be read in conjunction with our detailed site plan (attached) drawing (No.) 24056-
C4.

Referenced Documentation:-

Queensland Urban Drainage Manuai 2006

Water by Design - Deemed to Comply Solutions

Stormwater Quality Management S.E. Queensland

Sunshine Coast Regional Council - Planning Scheme Policy No. 5

Sunshine Coast Regional Council - Manual for Erosion and Sediment Control

2.0 SITE DESCRIPTION:

The allotment is described as Lot 430 on RP48112 and is within Noosa Shire Council. It is fronted by
Crank Street, Sunshine Beach. The allotment is currently vacant.

The existing ground slope within the allotment falls towards Crank Street. Council records indicate

stormwater infrastructure in close proximity to the allotment. The allotment is served by
Council/Unitywater sewerage infrastructure.

SCG CONSULTING ENGINEERS 2 SCG Ref: 24056(SWM)

Page 3

Losta Noosa

= Espresso

Y1) Frateltini a
Bark Design S

Architects -

Sunshine Beach

Zinc Properties
Noosa

 

Walker
& Beck a

Classic
Malibu

a Webs
The ama

 

j
id

t
Webb 6

3.0 PROPOSED DEVELOPMENT:
A duplex development (2 units) is proposed for the allotment.

The proposals are in sketch detail provided by the client.

4.0 OBJECTIVES:
41 STORMWATER QUALITY:
The following factors have been identified as potential contributors which can adversely effect
stormwater quality draining from the site:-
* Silt and sediment erosion
e Hydrocarbon runoff
« Nutrient runoff
4.1.1. SILT AND SEDIMENT EROSION:

A potential for sediment mobilization/transportation exists during and beyond the construction of the
proposed development. This can elevate Turbiltiy lebels of stormwater runoff.

SCG CONSULTING ENGINEERS SCG Ref: 24056(SWM)

Page 4

A RUSLE assessment of the site confirms proposed development is a Low Risk for soil loss (< 150

Tonnes).

Potential Causes

Stormwater scour and erosion of excavated or stripped surfaces and stockpiled soils

Disturbance/breakup of soil profile via vehicular traffic followed by stormwater scour
and erosion

Mitigating Measures

Construction of silt fences around the development site located to cut off all runoff

Provide 80-100mm crushed rock (no fines) hardstand under all vehicle paths expected
during construction. Generally this would be provided from the existing crossover and
extended to a distance within the site that would accommodate the maximum delivery
vehicle length expected

Where possible maintain existing landscaping/grasses downslope from construction
areas to act as buffer/silt trap

Install temporary downpipes from completed roof structures and ensure runoff passes
through silt fences.

Minimise concentrating surface flows.

4.1.2 HYDROCARBON RUNOFF:

Hydrocarbons can be mobilised and transported in stormwater runoff from the site. This can
contaminate stormwater runoff compromising Water Quality Objectives.

Potential Causes

Leaks from parked vehicles within the completed development

Washing of vehicles within the completed development.

Mitigating Measures

Drain driveways and parking areas through inground soakage pits.

4.1.3 NUTRIENT RUNOFF:

Nutrients such as Nitrogen and Phosphorus can be mobilized and transported in Stormwater runoff
from the site. This can compromise Water Quality Objectives.

Potential Causes

Detergents used in car washing and similar activities
Fertilisers used in propagation of landscaped areas

Embodied nutrients contained in silt (topsoil) runoff

SCG CONSULTING ENGINEERS 4 SCG Ref: 24056(SWM)

Page 5

Mitigating Measures

e Capture runoff from areas used for car washing and divert through inground soakage
-pits

e Implement management plan for landscaping propagation. Use stable organically
bound fertilizers cultivated immediately prior to turf placement. Mulch over areas of
exposed topsoil

« Construction of silt fences during construction and maintained beyond completion of
landscaping

4.2 MAINAGE STORMWATER RATES OF RUNOFF AND EXISTING FLOW PATH
CHARACTERISTICS:
4.2.1. MAINTAIN EXISTING STORMWATER RATES OF RUNOFF:

The allotment us currently vacant. The proposed development will increase the impermeable area of
the site leading to a possible increase in the rate of stormwater runoff.

The following factors are noted:-

Pre-Development sub-catchments Post Development sub-catchments
Pervious Area 370 m? Pervious Area 282 m?
Impervious area 450 m? Impervious area 238 m?
TOTAL 520 m? TOTAL 520 m?
STORM DATA
Time of Concentration 5 min
10 yr 1 hr Storm 1 70 mm/hr
5min Rainfall Intensities
10yr 220 mm/hr
20yr 250 mm/hr
100yr 320 mm/hr
Coefficient of Runoff
Fraction Impervious Cro Cro Cr00
Pervious Area* 0 0.7 0.74 0.84
Impervious Area 1 0.9 0.95 1.00

*Pervious area considered good grass cover with med, Soil permeability as per QUDM

 

 

 

 

 

 

Q=Cx!xA/360
Q - Pre-Development Q - Post-Development INCREASED
ARI Pervious Imperv. TOTAL Pervious Imperv. TOTAL RUNOFF
10 0.0158 0.0094 0.0252 mY/s | 0.0121 0.0131 0.0252 m/s} 0.0000 mis
20 0.0189 0.0099 0.0288 _ m/s | 0.0144 0.0156 0.0300 m/s} 0.0013 mi/s
100 0.0276 0.0133 0.0410 mis | 0.0211 0.0212 0.0422 m/s] 0.0013 mvs

 

 

 

SITE RUNOFF COEFFICIENTS

ARI Pre Development Post Development
10 0.79 0.79

20 0.80 0.83

100 0.89 0.91

SCG CONSULTING ENGINEERS 5 SCG Ref: 24056(SWM)

Page 6

Using these figures calculated peak runoff of volumes for a storm with an Average Recurrance Interval
(ARI) of 100yrs are as follows:-

Pre Development Qi99 = 41 It/s
Post Development Quigg (undetained) = 42.2 It/s
Peak Flow Increase = 1.2 It/s

Peak flow increases will be minor.

The use of infiltration pits and water storage tanks will offset this increase in peak runoff volumes.

4.2.2 MANAGE ALLOTMENT AND CROSS ALLOTMENT FLOWS:

From the existing surface contours, runoff from the site travels from the rear of the allotment towards
Crank Street.

A series of townhouses exists at the rear of the allotment. These drain along a driveway adjacent the
common boundary towards Crank Street. This ensures no cross allotment flows occur for the
allotment.

4.3 MANAGE WATER DEMAND:

A 5000It tank is proposed which will serve WC'’s and External Hose Cocks for irrigation purposes only.

The tank are to be fitted with a switchover device which provides mains water supply when the tank
volumes dropped to pre-determined levels.

4.4 PROTECT AGAINST FLOODING:

Noosa Shire Council's major flood overlay map confirms the allotment is not prone to flooding.

5.0 CONCLUSION:

The measures proposed in this report demonstrate that the development can incorporate Water
Sensitive Urban Design principles into it’s construction and on-going use.

The development will contribute positively to the built environment that will contain it.

 

Sean Richardson RPEQ 5835
For and on behalf of
SCG CONSULTING ENGINEERS

Attachment: Drawing (No.) 24056 — C4

SCG CONSULTING ENGINEERS 6 SCG Ref: 24056(SWM)

Used in these records

About this file

File size
758 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

REFERENCED DOCUMENT - MCU14.0006.pdf · 758 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.